MOT-SR 48-01.02
MOT County · est $2.2M
Bid dateThursday, April 13—
MOT County · est $2.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 145 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | R3Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,149 CY | $187 | $208 | $245 | 14% |
| 611E52502 24" X 38" CONDUIT, TYPE B, 706.04 | 450 FT | $244 | $250 | $400 | 7% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 416 CY | $235 | $330 | $335 | 6% |
| 304E20000 AGGREGATE BASE | 1,006 CY | $97.00 | $67.11 | $107 | 6% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 367 CY | $252 | $325 | $300 | 6% |
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 78 FT | $1,125 | $1,120 | $1,159 | 6% |
| 203E10000 EXCAVATION | 2,895 CY | $30.00 |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | R3Sunesis Construction CO |
|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $500 | $560 | $549 |
| 202E23500 WEARING COURSE REMOVED | 3,553 SY | $6.00 | $7.75 | $4.75 |
| 202E30000 WALK REMOVED | 694 SF | $4.00 | $3.22 | $4.63 |
| 202E32500 CURB AND GUTTER REMOVED | 30 FT | $15.50 | $14.16 | $13.38 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 298 FT | $22.00 | $31.32 | $25.74 |
| 202E35200 PIPE REMOVED, OVER 24" |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40.77 |
| $44.72 |
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $199,060 | $32,571 | 5% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,175 CY | $70.00 | $70.28 | $89.72 | 5% |
| 659E00300 TOPSOIL | 1,550 CY | $52.50 | $3.00 | $44.95 | 5% |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 550 SY | $128 | $173 | $105 | 4% |
| 602E20000 CONCRETE MASONRY | 42 CY | $1,630 | $913 | $1,871 | 4% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $30,020 | $28,210 | $30,020 | 4% |
| 832E30000 EROSION CONTROL | 55,000 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $25,620 | $24,720 | $25,620 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $100,000 | $146,674 | 3% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 2,246 FT | $22.00 | $17.82 | $12.41 | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,152 CY | $40.00 | $27.71 | $70.53 | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 470 SY | $92.00 | $105 | $121 | 3% |
| 202E23000 PAVEMENT REMOVED | 2,472 SY | $17.00 | $17.26 | $16.28 | 3% |
| 200 FT |
| $25.00 |
| $27.09 |
| $26.09 |
| 202E38000 GUARDRAIL REMOVED | 667 FT | $7.50 | $2.00 | $7.50 |
| 202E53101 MAILBOX REMOVED, AS PER PLAN | 1 EACH | $300 | $345 | $1,162 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $600 | $525 | $442 |
| 202E98100 REMOVAL MISC.: PRIVATE LIGHT POLE | 1 EACH | $315 | $1,112 | $190 |
| 203E20000 EMBANKMENT | 1,099 CY | $29.00 | $25.22 | $13.97 |
| 204E10000 SUBGRADE COMPACTION | 4,458 SY | $1.45 | $3.10 | $4.20 |
| 204E45000 PROOF ROLLING | 13 HOUR | $210 | $216 | $288 |
| 204E50000 GEOTEXTILE FABRIC | 2,820 SY | $1.85 | $3.70 | $1.53 |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $26.00 | $19.80 | $26.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $31.00 | $21.40 | $31.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 38 FT | $29.00 | $24.50 | $29.00 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 1 EACH | $2,350 | $2,380 | $2,350 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,400 | $1,395 | $1,400 |
| 607E35001 FENCE REMOVED AND REBUILT, AS PER PLAN | 50 FT | $62.50 | $78.50 | $62.50 |
| 608E10000 4" CONCRETE WALK | 2,968 SF | $13.00 | $14.80 | $15.02 |
| 608E13000 6" CONCRETE WALK | 200 SF | $15.00 | $17.69 | $18.00 |
| 608E52000 CURB RAMP | 260 SF | $24.00 | $27.27 | $33.25 |
| 608E53020 DETECTABLE WARNING | 78 SF | $60.00 | $60.00 | $60.00 |
| 623E38500 MONUMENT ASSEMBLY | 7 EACH | $1,700 | $566 | $1,569 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 39 EACH | $350 | $493 | $1,076 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $7,899 | $13,272 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 20 CY | $211 | $252 | $183 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 6 CY | $315 | $352 | $224 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $70.00 | $200 |
| 659E10000 SEEDING AND MULCHING | 13,195 SY | $0.92 | $1.20 | $1.70 |
| 659E14000 REPAIR SEEDING AND MULCHING | 660 SY | $0.50 | $1.20 | $0.50 |
| 659E15000 INTER-SEEDING | 660 SY | $0.01 | $1.00 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 1.8 TON | $1,500 | $925 | $1,500 |
| 659E31000 LIME | 2.73 ACRE | $200 | $100 | $200 |
| 659E35000 WATER | 35.6 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 448 SY | $2.35 | $2.70 | $2.35 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,475 | $1,475 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $3,250 | $4,350 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,250 | $12,193 | $12,193 |
| 611E00400 4" CONDUIT, TYPE E, FOR PULL BOXES | 25 FT | $35.00 | $31.91 | $26.02 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 90 FT | $33.00 | $39.91 | $46.62 |
| 611E04400 12" CONDUIT, TYPE B | 319 FT | $102 | $57.98 | $100 |
| 611E04600 12" CONDUIT, TYPE C | 17 FT | $90.00 | $74.39 | $116 |
| 611E05900 15" CONDUIT, TYPE B | 77 FT | $110 | $62.00 | $116 |
| 611E06100 15" CONDUIT, TYPE C | 6 FT | $119 | $104 | $249 |
| 611E10600 24" CONDUIT, TYPE C | 33 FT | $134 | $104 | $183 |
| 611E52504 24" X 38" CONDUIT, TYPE C, 706.04 | 140 FT | $245 | $279 | $405 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,750 | $2,772 | $4,999 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $2,450 | $1,479 | $2,001 |
| 611E98540 CATCH BASIN, NO. 2-4 | 3 EACH | $4,150 | $2,703 | $4,346 |
| 611E98570 CATCH BASIN, NO. 2-5 | 1 EACH | $4,900 | $3,737 | $5,792 |
| 611E99574 MANHOLE, NO. 3 | 6 EACH | $6,500 | $5,935 | $7,976 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $400 | $620 | $410 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $10,641 | $7,020 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 2,424 SY | $9.25 | $7.00 | $4.50 |
| 407E10000 TACK COAT | 79 GAL | $3.50 | $5.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT(0.055 GAL/SY) | 641 GAL | $3.50 | $5.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT(0.085 GAL/SY) | 508 GAL | $3.50 | $5.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 12 CY | $350 | $693 | $500 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $270 | $692 | $500 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 30 CY | $335 | $435 | $450 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 112 FT | $60.00 | $62.87 | $64.41 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 215 FT | $45.00 | $47.52 | $49.59 |
| 617E10100 COMPACTED AGGREGATE | 150 CY | $120 | $94.95 | $138 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $550 | $643 | $140 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 84 FT | $25.00 | $19.40 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $45.50 | $48.00 | $45.50 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 12 EACH | $355 | $385 | $355 |
| 630E80100 SIGN, FLAT SHEET | 86.17 SF | $28.00 | $20.00 | $28.00 |
| 630E80510 SIGN, STREET NAME | 6 EACH | $155 | $145 | $155 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $25.00 | $10.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $40.00 | $15.00 | $40.00 |
| 644E00104 EDGE LINE, 6" | 1.01 MILE | $6,610 | $5,500 | $6,610 |
| 644E00300 CENTER LINE | 0.74 MILE | $8,325 | $7,500 | $8,325 |
| 644E00400 CHANNELIZING LINE, 8" | 800 FT | $1.25 | $1.80 | $1.25 |
| 644E00500 STOP LINE | 150 FT | $6.65 | $8.25 | $6.65 |
| 644E00630 CROSSWALK LINE, 24" | 356 FT | $5.60 | $7.45 | $5.60 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 216 FT | $6.10 | $7.85 | $6.10 |
| 644E01300 LANE ARROW | 16 EACH | $125 | $142 | $125 |
| 625E18401 BRACKET ARM, 20', AS PER PLAN | 1 EACH | $1,860 | $1,845 | $1,860 |
| 625E18511 BRACKET ARM, 30', AS PER PLAN | 3 EACH | $3,180 | $2,885 | $3,180 |
| 625E25400 CONDUIT, 2", 725.04 | 104 FT | $22.35 | $11.75 | $22.35 |
| 625E25410 CONDUIT, 2", 725.052 | 137 FT | $10.20 | $3.50 | $10.20 |
| 625E25506 CONDUIT, 3", 725.052 | 71 FT | $17.65 | $5.90 | $17.65 |
| 625E25606 CONDUIT, 4", 725.052 | 34 FT | $22.45 | $8.70 | $22.45 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 271 FT | $53.35 | $55.00 | $53.35 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 4 EACH | $545 | $475 | $545 |
| 625E29000 TRENCH | 323 FT | $12.70 | $10.50 | $12.70 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,080 | $905 | $1,080 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,186 | $1,135 | $1,186 |
| 625E31510 PULL BOX REMOVED | 7 EACH | $232 | $150 | $232 |
| 625E32000 GROUND ROD | 13 EACH | $365 | $335 | $365 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 208 FT | $1.55 | $1.60 | $1.55 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $1,091 | $1,155 | $1,091 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,740 | $1,840 | $1,740 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 8 EACH | $656 | $575 | $656 |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 8 EACH | $875 | $940 | $875 |
| 632E30980 SIGNAL CABLE, 3 CONDUCTOR, NO. 10 AWG | 834 FT | $3.35 | $1.90 | $3.35 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,361 FT | $2.70 | $2.15 | $2.70 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,573 FT | $3.40 | $2.40 | $3.40 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $9,960 | $6,800 | $9,960 |
| 632E64020 PEDESTAL FOUNDATION | 8 EACH | $1,115 | $1,250 | $1,115 |
| 632E64950 TEST HOLE PERFORMED | 2 EACH | $1,390 | $500 | $1,390 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 56 FT | $6.10 | $6.55 | $6.10 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 33 FT | $6.10 | $6.55 | $6.10 |
| 632E70000 POWER SERVICE | 1 EACH | $3,880 | $5,545 | $3,880 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 8 EACH | $1,300 | $1,040 | $1,300 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $4,475 | $4,335 | $4,475 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $17,920 | $16,780 | $17,920 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,710 | $1,495 | $1,710 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $640 | $950 | $640 |
| 633E68510 COMMUNICATIONS | 1 EACH | $3,660 | $2,090 | $3,660 |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN | 1 EACH | $8,595 | $8,870 | $8,595 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $9,200 | $9,695 | $920 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,870 | $9,130 | $8,870 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $5,790 | $5,180 | $5,790 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 9 EACH | $42.75 | $35.00 | $42.75 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $24.90 | $35.00 | $24.90 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 5 CY | $215 | $117 | $91.41 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 5 CY | $215 | $117 | $102 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 70 HOUR | $85.00 | $93.10 | $75.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,400 | $2,400 | $2,400 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $800 | $199 | $445 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 39 EACH | $14.00 | $14.00 | $14.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 39 EACH | $21.00 | $21.00 | $21.00 |
| 614E18002 MAINTAINING TRAFFIC, MISC.: TEMPORARY TRAFFIC SIGN | 1 LS | $20,000 | $1,980 | $30,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,050 | $1,050 | $1,050 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1 MILE | $2,065 | $2,785 | $2,065 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.74 MILE | $1,255 | $2,785 | $1,255 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 2 MILE | $1,590 | $1,612 | $1,590 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.01 MILE | $1,020 | $1,612 | $1,020 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 100 FT | $3.75 | $5.05 | $3.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 150 FT | $3.65 | $5.05 | $3.65 |
| 614E40050 BUSINESS ENTRANCE SIGN | 4 EACH | $300 | $125 | $125 |
| 616E10000 WATER | 20 MGAL | $75.00 | $934 | $15.23 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 990 FT | $24.00 | $24.00 | $24.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $22,500 | $26,289 | $8,048 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $11,000 | $10,220 | $23,903 |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $12,000 | $16,666 | $2,177 |
| 517E73501 RAILING, PIPE, AS PER PLAN | 25 FT | $435 | $238 | $435 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,826 | $17,343 | $15,564 |
| 614E12420 DETOUR SIGNING | 1 LS | $15,970 | $15,235 | $15,970 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,575 | $1,518 | $1,385 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $5,043 | $28,170 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,149 CY | $187 | $215k | 8% |
| 611E52502 24" X 38" CONDUIT, TYPE B, 706.04 | 450 FT | $244 | $110k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 416 CY | $235 | $98k | 4% |
| 304E20000 AGGREGATE BASE | 1,006 CY | $97 | $98k | 4% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 367 CY | $252 | $92k | 4% |
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 78 FT | $1,125 | $88k | 3% |
| 203E10000 EXCAVATION | 2,895 CY | $30 | $87k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $85k | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,175 CY | $70 | $82k | 3% |
| 659E00300 TOPSOIL | 1,550 CY | $52.5 | $81k | 3% |