Ric-BH FY2023
Richland County · est $0.6M
Bid dateThursday, April 13—
Richland County · est $0.6M
Bid tab · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20 items by low bid’s extended amount · 11 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Eclipse CO LLC | R3Adena Corporation | % of bid |
|---|---|---|---|---|---|
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 50 CY | $1,066 | $1,175 | $1,081 | 14% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 39 CY | $1,203 | $1,409 | $1,270 | 12% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (78" X | 172 FT | $251 | $170 | $246 | 11% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 25 CY | $1,206 | $1,425 | $1,254 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,547 | $27,311 | $22,553 | 7% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (DEFORM | 93 FT | $279 | $245 | $251 | 7% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (EXISTI | 19 CY | $956 | $1,300 |
| Item | Quantity | R1Bcc Ohio INC | R2Eclipse CO LLC | R3Adena Corporation |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $84.00 | $68.00 | $134 |
| 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (FASCIA | 18 EACH | $275 | $210 | $176 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 222 EACH | $27.45 | $73.00 | $28.62 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 6 FT | $113 | $426 | $264 |
| 611E04401 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $574 |
| 5% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 200 FT | $82.11 | $55.00 | $98.01 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,653 | $21,000 | $14,073 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,653 | $30,000 | $35,494 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,653 | $30,000 | $41,329 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $14,789 | $18,646 | $24,539 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,163 | $1,106 | $1,502 | 2% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (KNEE W | 1 LS | $9,137 | $18,000 | $12,391 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,670 | $10,000 | $42,442 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $1,438 | $685 | $500 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 170 FT | $50.10 | $112 | $45.55 | 2% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 1,866 LB | $4.47 | $8.00 | $4.70 | 2% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 8 CY | $1,033 | $1,120 | $1,363 | 2% |
| 530E00400 SPECIAL - STRUCTURES: RESET STONE MASONRY | 18 EACH | $457 | $165 | $375 | 2% |
| 6 FT |
| $673 |
| $869 |
| $750 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 854 LB | $4.47 | $8.00 | $6.71 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 272 EACH | $27.45 | $67.00 | $28.62 |
| 611E96650 SPECIAL - GROUTING VOIDS AROUND CORRUGATED METAL P | 3 CY | $815 | $1,800 | $795 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,383 | $9,500 | $7,348 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,750 | $6,500 | $10,902 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 50 CY | $1,066 | $53k | 12% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 39 CY | $1,203 | $47k | 11% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (78" X | 172 FT | $250.74 | $43k | 10% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 25 CY | $1,206 | $30k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,547 | $27k | 6% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (DEFORM | 93 FT | $278.66 | $26k | 6% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (EXISTI | 19 CY | $956.05 | $18k | 4% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 200 FT | $82.11 | $16k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,653 | $16k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,653 | $16k | 4% |