Figure 0.1 · BRIEFING BID #230275 · ODOT RESULT · awarded Apr 27 D07-PPM FY23 D07 County · est $1.4M
Bid date Thursday, April 27 —
Project scope Bid form · ODOT
25 ITEMS Pavement Marking 60% Maintaining Traffic 16% Mobilization & General 8% Other 16% Top items by winning bid Item Qty Unit price Extended % 643E00204 LANE LINE, 6" 419.13 MILE $568 $238k 19% 643E00404 CHANNELIZING LINE, 12" 187,621 FT $0.69 $129k 10% 643E00500
Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC % of bid 643E00204 LANE LINE, 6" 419.13 MILE $568 $595 20% 643E00404 CHANNELIZING LINE, 12" 187,621 FT $0.69 $0.75 11% 643E00500 STOP LINE 21,600 FT $5.75 $6.40 10% 643E00700 TRANSVERSE/DIAGONAL LINE 35,453 FT $3.15 $3.65 9% 643E01300 LANE ARROW 1,284 EACH $82.00 $85.00 9% 643E01510 DOTTED LINE, 6" 146,069 FT $0.69 $0.85 8% 643E00620 CROSSWALK LINE, 12" 21,304 FT $3.15 $3.70 6% 643E01310 WRONG WAY ARROW 169 EACH $275 $340 4% 614E11001 MAINTAINING TRAFFIC, AS PER PLAN 1 LS $42,284 $115,000 3% 624E10000 MOBILIZATION 1 LS $42,284 $87,000 3% 643E00400 CHANNELIZING LINE, 8" 69,840 FT $0.59 $0.70 3% 642E50000 PAVEMENT MARKING, MISC.: BLACK SHADOW LANE LINE 48.6 MILE $838 $1,055 3% 643E01550 DOTTED LINE, 12" 27,814 FT $1.25 $1.66 3% 643E40000 AIR SPEED ZONE MARKING 255 EACH $135 $145 3% 643E01000 RAILROAD SYMBOL MARKING 45 EACH $475 $470 2% 643E01110 SCHOOL SYMBOL MARKING, 96" 33 EACH $465 $490 1% 643E01410 WORD ON PAVEMENT, 96" 60 EACH $119 $130 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $6,269 $7,400 1% 643E50100 PAVEMENT MARKING, MISC.: LANE REDUCTION ARROW 20 EACH $300 $265 0% 643E01500 DOTTED LINE, 4" 4,995 FT $1.00 $1.20 0%
Show all 25 line items Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC 643E01602 BIKE LANE SYMBOL MARKING 22 EACH $225 $280 643E20802 YIELD LINE 169 FT $25.00 $27.00 643E50100 PAVEMENT MARKING, MISC.: "MERGE" 5 EACH $501 $680 643E50100 PAVEMENT MARKING, MISC.: "XING" 4 EACH $453 $550 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST 24 HOUR $50.00 $72.00
Project details
Description D07-PPM FY23
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →