ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Outdoor Enterprise LLC | R2John R Jurgensen Company | R3L J Deweese CO INC | R4Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 525 CY | $65.00 | $48.25 | $45.00 | $55.00 | 14% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (78 CY | $352 | $378 | $385 | $370 | 11% |
| 304E20000 AGGREGATE BASE | 325 CY | $80.00 | $79.30 | $175 | $100 | 11% |
| 608E10000 4" CONCRETE WALK, AS PER PLAN | 1,592 SF | $15.00 | $12.28 | $15.00 | $12.00 | 10% |
| 659E00300 TOPSOIL, AS PER PLAN | 292 CY | $79.00 | $33.24 | $60.00 | $55.00 | 10% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 38 CY | $352 | $768 | $385 | $465 |
| Item | Quantity | R1Outdoor Enterprise LLC | R2John R Jurgensen Company | R3L J Deweese CO INC | R4Barrett Paving Materials INC |
|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,180 SF | $2.50 | $4.25 | $4.00 | $3.00 |
| 204E10000 SUBGRADE COMPACTION | 1,465 SY | $2.00 | $2.65 | $3.00 | $3.00 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 18 FT | $59.00 | $65.13 | $90.00 | $135 |
| 832E30000 EROSION CONTROL | 1,425 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 203E20000 EMBANKMENT, AS PER PLAN | 159 CY | $80.00 | $43.37 | $110 | $55.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $10,000 | $7,500 | $20,000 | 5% |
| 203E98600 ROADWAY, MISC.:BENCH, AS PER PLAN | 3 EACH | $3,450 | $7,119 | $5,300 | $6,500 | 4% |
| 680E14550 SPECIAL - TRASH RECEPTACLE, AS PER PLAN | 2 EACH | $5,000 | $6,594 | $3,800 | $4,500 | 4% |
| 203E98600 ROADWAY, MISC.:DOG WASTE STATION, AS PER PLAN | 2 EACH | $3,000 | $1,751 | $1,500 | $1,550 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $5,660 | $5,000 | $12,000 | 3% |
| 608E52001 CURB RAMP, AS PER PLAN | 188 SF | $29.00 | $28.26 | $25.00 | $30.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,903 | $5,500 | $15,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $1,789 | $3,500 | $5,516 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $18,753 | $6,500 | $25,500 | 2% |
| 608E13000 6" CONCRETE WALK, AS PER PLAN | 242 SF | $18.00 | $13.77 | $20.00 | $23.00 | 2% |
| 659E10000 SEEDING AND MULCHING, AS PER PLAN | 1,750 SY | $2.00 | $2.75 | $4.25 | $4.00 | 1% |
| 644E00100 EDGE LINE, 4" | 0.38 MILE | $8,662 | $13,320 | $9,000 | $8,500 | 1% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $3,000 | $1,250 | $2,500 | $3,000 | 1% |
| 84 GAL |
| $11.00 |
| $10.00 |
| $12.00 |
| $3.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, TYPE S | 21 FT | $17.60 | $15.50 | $20.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 10 SF | $33.00 | $16.00 | $35.00 | $50.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 525 CY | $65 | $34k | 14% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (78 CY | $352 | $27k | 11% |
| 304E20000 AGGREGATE BASE | 325 CY | $80 | $26k | 10% |
| 608E10000 4" CONCRETE WALK, AS PER PLAN | 1,592 SF | $15 | $24k | 10% |
| 659E00300 TOPSOIL, AS PER PLAN | 292 CY | $79 | $23k | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 38 CY | $352 | $13k | 5% |
| 203E20000 EMBANKMENT, AS PER PLAN | 159 CY | $80 | $13k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 5% |
| 203E98600 ROADWAY, MISC.:BENCH, AS PER PLAN | 3 EACH | $3,450 | $10k | 4% |
| 680E14550 SPECIAL - TRASH RECEPTACLE, AS PER PLAN | 2 EACH | $5,000 | $10k | 4% |