STA-SR 172-25.53
STA County · est $2.3M
Bid dateThursday, May 11—
STA County · est $2.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | % of bid |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3769 CY | $145 | $175 | 28% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 2,694 CY | $200 | $225 | 27% |
| 253E01000 PAVEMENT REPAIR | 3,000 SY | $75.00 | $120 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $180,000 | $160,000 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 74,480 SY | $1.75 | $3.45 | 7% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 622 CY | $65.00 | $95.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $149,860 | 2% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 25,186 FT | $1.50 | $0.80 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 11,572 GAL | $2.50 | $2.75 | 1% |
| 646E10010 EDGE LINE, 6" | 9.58 MILE | $2,950 | $2,950 | 1% |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 504 STA | $55.00 | $50.00 | 1% |
| 304E20000 AGGREGATE BASE | 500 CY | $50.00 | $30.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,478 GAL | $5.00 | $5.80 | 1% |
| 646E10200 CENTER LINE | 4.79 MILE | $4,500 | $4,500 | 1% |
| 209E60200 LINEAR GRADING | 504 STA | $35.00 | $20.00 | 1% |
| 621E00100 RPM | 424 EACH | $41.25 | $33.80 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $2,400 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 9.58 MILE | $1,500 | $1,500 | 1% |
| 512E33010 TYPE 3 WATERPROOFING | 258 SY | $45.00 | $45.00 | 1% |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 383 SY | $30.00 | $15.00 | 1% |
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC |
|---|---|---|---|
| 203E10000 EXCAVATION | 500 CY | $20.00 | $15.00 |
| 690E21000 SPECIAL - AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $3,500 | $500 |
| 659E10000 SEEDING AND MULCHING | 14,050 SY | $0.80 | $0.79 |
| 659E20000 COMMERCIAL FERTILIZER | 1.9 TON | $890 | $200 |
| 659E31000 LIME | 2.9 ACRE | $150 | $25.00 |
| 659E35000 WATER | 38 MGAL | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 2,365 SY | $2.00 | $2.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 4.77 MILE | $1,375 | $1,375 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 347 EACH | $5.00 | $0.25 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 45 FT | $35.00 | $35.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 6 SF | $45.00 | $45.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $20.00 | $20.00 |
| 646E10400 STOP LINE, 24" | 24 FT | $15.00 | $15.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 75 HOUR | $100 | $85.00 |
| 614E12460 WORK ZONE MARKING SIGN, (ALL PHASES) | 18 EACH | $65.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $125 | $300 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.79 MILE | $1,500 | $1,500 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.58 MILE | $600 | $600 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 48 FT | $4.00 | $4.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 24 FT | $4.00 | $4.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,000 | $2,000 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 329 SY | $30.00 | $15.00 |
| 407E20000 NON-TRACKING TACK COAT | 50 GAL | $2.50 | $2.75 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 68 FT | $25.00 | $25.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $275 | $215 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (18 CY | $425 | $375 |
| 512E33010 TYPE 3 WATERPROOFING | 186 SY | $45.00 | $45.00 |
| 515E30000 HIGH EARLY STRENGTH KEYWAY GROUT | 50 FT | $50.00 | $50.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,000 | $2,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,000 | $2,000 |
| 407E20000 NON-TRACKING TACK COAT | 58 GAL | $2.50 | $2.96 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 80 FT | $25.00 | $25.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 14 CY | $275 | $215 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (23 CY | $425 | $375 |
| 515E30000 HIGH EARLY STRENGTH KEYWAY GROUT | 51 FT | $50.00 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $18,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3769 CY | $145 | $547k | 26% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 2,694 CY | $200 | $539k | 25% |
| 253E01000 PAVEMENT REPAIR | 3,000 SY | $75 | $225k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $180,000 | $180k | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 74,480 SY | $1.75 | $130k | 6% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 622 CY | $65 | $40k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 25,186 FT | $1.5 | $38k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 11,572 GAL | $2.5 | $29k | 1% |
| 646E10010 EDGE LINE, 6" | 9.58 MILE | $2,950 | $28k | 1% |