CUY-IR 71/IR 90 Wrong Way Signs
CUY County · est $3.2M
Bid dateThursday, May 25—
CUY County · est $3.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Perram Electric INC | R2Ruhlin Company | R3Miller Cable Company | % of bid |
|---|---|---|---|---|---|
| AA3 809E69130 WRONG WAY DETECTION SYSTEM (TRAFFICALM) (ALTERNAT | 24 EACH | $38,280 | $44,800 | $60,000 | 31% |
| 625E25400 CONDUIT, 2", 725.04 | 15,006 FT | $13.51 | $21.00 | $12.00 | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 3,616 FT | $53.20 | $59.00 | $43.00 | 7% |
| 809E65011 ITS CABINET - POLE MOUNTED, AS PER PLAN | 21 EACH | $9,040 | $10,050 | $9,900 | 6% |
| 625E29000 TRENCH | 15,006 FT | $12.41 | $12.00 | $9.40 | 6% |
| 625E30700 PULL BOX, 725.08, 18" | 153 EACH | $1,145 | $1,015 | $900 | 6% |
| 632E70001 POWER SERVICE, AS PER PLAN | 26 EACH | $6,640 | $7,700 |
| Item | Quantity | R1Perram Electric INC | R2Ruhlin Company | R3Miller Cable Company |
|---|---|---|---|---|
| 659E00300 TOPSOIL | 881 CY | $30.00 | $90.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 7,931 SY | $0.50 | $3.50 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 397 SY | $2.00 | $0.40 | $1.00 |
| 659E15000 INTER-SEEDING | 415 SY | $2.00 | $0.10 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 1.78 TON | $1,125 | $900 | $220 |
| 659E31000 LIME | 1.64 ACRE | $200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $6,500 |
| 6% |
| 632E64020 PEDESTAL FOUNDATION | 100 EACH | $1,290 | $920 | $1,100 | 4% |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15' TRANSFORMER BASE | 96 EACH | $1,103 | $790 | $1,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | 3% |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 12,878 FT | $6.25 | $5.50 | $7.00 | 3% |
| 809E65990 ITS DEVICE, MISC.: CCTV IP-CAMERA SYSTEM, FIXED VI | 27 EACH | $2,790 | $3,700 | $3,700 | 3% |
| 632E69320 POWER CABLE, 3 CONDUCTOR, NO. 2 AWG | 7,079 FT | $10.42 | $11.00 | $12.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $62,050 | $20,360 | $153,500 | 2% |
| 621E00100 RPM | 814 EACH | $70.00 | $65.00 | $70.00 | 2% |
| 632E64950 TEST HOLE PERFORMED | 25 EACH | $2,000 | $550 | $75.00 | 2% |
| 644E01360 WRONG WAY ARROW | 37 EACH | $1,250 | $965 | $1,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,361 | $16,937 | $34,706 | 2% |
| 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE | 8,261 FT | $5.30 | $6.00 | $7.50 | 1% |
| 625E32000 GROUND ROD | 117 EACH | $296 | $331 | $275 | 1% |
| $75.00 |
| $35.00 |
| 659E35000 WATER | 44 MGAL | $5.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 25 EACH | $1.00 | $1.00 | $1.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 192 EACH | $151 | $190 | $200 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 104 EACH | $18.10 | $75.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 60 EACH | $17.10 | $55.00 | $25.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 63 EACH | $164 | $185 | $116 |
| 625E22910 NO. 2/0 AWG 2400 VOLT DISTRIBUTION CABLE | 5,222 FT | $6.30 | $8.40 | $9.00 |
| 625E30710 PULL BOX, 725.08, 32" | 1 EACH | $3,735 | $1,800 | $3,800 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 15,006 FT | $1.17 | $1.20 | $3.00 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 405 FT | $8.45 | $8.50 | $7.50 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 25 EACH | $640 | $750 | $300 |
| 632E89300 WOOD POLE | 21 EACH | $1,485 | $1,100 | $1,600 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 4,957 FT | $1.76 | $1.20 | $2.00 |
| 809E65990 ITS DEVICE, MISC.: ITS DEVICE MISC. HIGH-SPEED ETH | 24 EACH | $342 | $225 | $500 |
| 809E65990 ITS DEVICE, MISC.:CELLUAR MODEM | 5 EACH | $1,245 | $425 | $2,350 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 1 EACH | $1,040 | $650 | $700 |
| AA3 630E95000 SIGNING, MISC.: WRONG WAY DETECTION SYSTEM, FURNIS | 1 LS | $29,485 | $38,850 | $46,700 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $50.00 | $95.00 | $96.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,840 | $4,200 | $36,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,760 | $8,500 | $77,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| AA3 809E69130 WRONG WAY DETECTION SYSTEM (TRAFFICALM) (ALTERNAT | 24 EACH | $38,280 | $919k | 29% |
| 625E25400 CONDUIT, 2", 725.04 | 15,006 FT | $13.51 | $203k | 6% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 3,616 FT | $53.2 | $192k | 6% |
| 809E65011 ITS CABINET - POLE MOUNTED, AS PER PLAN | 21 EACH | $9,040 | $190k | 6% |
| 625E29000 TRENCH | 15,006 FT | $12.41 | $186k | 6% |
| 625E30700 PULL BOX, 725.08, 18" | 153 EACH | $1,145 | $175k | 5% |
| 632E70001 POWER SERVICE, AS PER PLAN | 26 EACH | $6,640 | $173k | 5% |
| 632E64020 PEDESTAL FOUNDATION | 100 EACH | $1,290 | $129k | 4% |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15' TRANSFORMER BASE | 96 EACH | $1,103 | $106k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |