614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
300 HOUR
$100
$100
2%
614E18600PORTABLE CHANGEABLE MESSAGE SIGN
20 SNMT
$1,000
$1,000
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$18,000
$5,000
1%
614E12420DETOUR SIGNING
1 LS
$15,000
$6,500
1%
619E16010FIELD OFFICE, TYPE B
6 MNTH
$2,000
$2,000
1%
642E00104EDGE LINE, 6", TYPE 1
5 MILE
$895
$895
0%
832E30000EROSION CONTROL
3,000 EACH
$1.00
$1.00
0%
642E00204LANE LINE, 6", TYPE 1
3 MILE
$860
$860
0%
614E12460WORK ZONE MARKING SIGN
10 EACH
$100
$100
0%
690E91000SPECIAL - AS-BUILT CONSTRUCTION PLANS
1 LS
$1,000
$8,000
0%
614E13000ASPHALT CONCRETE FOR MAINTAINING TRAFFIC
10 CY
$75.00
$110
0%
642E00300CENTER LINE, TYPE 1
0.5 MILE
$990
$990
0%
642E00404CHANNELIZING LINE, 12", TYPE 1
200 FT
$2.00
$2.00
0%
621E54000RAISED PAVEMENT MARKER REMOVED
50 EACH
$1.00
$10.00
0%
Project details
Description
D04-SP FY2023 (West)
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$68
$697k
38%
251E01020PARTIAL DEPTH PAVEMENT REPAIR (442)
6,500 SY
$73
$475k
26%
614E11001MAINTAINING TRAFFIC, AS PER PLAN
1 LS
$262,750
$263k
14%
624E15001MOBILIZATION, AS PER PLAN
10 EACH
$14,000
$140k
8%
253E01000PAVEMENT REPAIR (T=9" +/-)
250 SY
$400
$100k
5%
253E01000PAVEMENT REPAIR (T=10" +/-)
250 SY
$300
$75k
4%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
300 HOUR
$100
$30k
2%
614E18600PORTABLE CHANGEABLE MESSAGE SIGN
20 SNMT
$1,000
$20k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM