SUM-IR 77-28.75
SUM County · est $60M
Bid dateThursday, August 31—
SUM County · est $60M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 548 more items below.
| Item | Quantity | R1Kenmore Construction CO INC | R2Shelly & Sands INC | R3Shelly Company | R4Anthony Allega Cement Contractor INC | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 46,629 CY | $132 | $148 | $151 | $159 | $223 | 19% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 63,156 SY | $50.00 | $45.00 | $40.00 | $40.35 | $60.00 | 10% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 10,995 CY | $250 | $281 | $295 | $310 | $300 | 8% |
| 304E20000 AGGREGATE BASE | 41,777 CY | $60.00 | $74.00 | $52.00 | $72.00 | $72.00 | 8% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 10,737 CY | $215 | $183 | $215 | $226 | $270 | 7% |
| 203E10000 EXCAVATION |
| Item | Quantity | R1Kenmore Construction CO INC | R2Shelly & Sands INC | R3Shelly Company | R4Anthony Allega Cement Contractor INC | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500,000 | $750,000 | $338,640 | $312,386 | $550,000 |
| 202E20010 HEADWALL REMOVED | 36 EACH | $400 | $176 | $555 | $608 | $650 |
| 202E30700 CONCRETE BARRIER REMOVED | 1,135 FT | $12.00 | $14.00 | $61.60 | $67.58 | $15.00 |
| 202E32000 CURB REMOVED | 85 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 145,967 CY |
| $15.00 |
| $13.00 |
| $10.00 |
| $8.66 |
| $25.00 |
| 7% |
| 452E14122 11.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 18,771 SY | $115 | $110 | $84.10 | $92.30 | $105 | 7% |
| 202E23000 PAVEMENT REMOVED | 129,667 SY | $15.00 | $11.50 | $20.00 | $20.70 | $7.00 | 6% |
| 206E10500 CEMENT | 6,814 TON | $203 | $205 | $203 | $205 | $203 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 86,521 FT | $11.50 | $11.00 | $7.65 | $10.73 | $13.00 | 3% |
| 832E30000 EROSION CONTROL | 935,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $800,000 | $1,200,000 | $1,600,000 | $1,600,000 | $1,600,000 | 2% |
| 203E20000 EMBANKMENT | 65,359 CY | $12.00 | $9.50 | $3.75 | $4.10 | $5.50 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 86,700 FT | $9.00 | $6.00 | $15.00 | $6.25 | $9.00 | 2% |
| 611E96600 CONDUIT, BORED OR JACKED 15'', 748.06 | 986 FT | $770 | $440 | $482 | $469 | $400 | 2% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 257,430 SY | $2.75 | $3.00 | $2.95 | $4.08 | $5.00 | 2% |
| 611E96600 CONDUIT, BORED OR JACKED 30'', 748.06 | 406 FT | $1,600 | $650 | $726 | $698 | $600 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $600,000 | $1,600,000 | $3,065,295 | $2,759,384 | $1,796,000 | 2% |
| 607E15000 FENCE, TYPE 47 | 41,678 FT | $13.50 | $14.50 | $12.20 | $14.18 | $12.20 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 25,924 FT | $20.20 | $21.00 | $20.20 | $21.21 | $20.20 | 2% |
| $5.00 |
| $18.00 |
| $23.30 |
| $24.73 |
| $7.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,203 FT | $24.00 | $27.00 | $26.35 | $28.93 | $23.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 230 FT | $25.00 | $44.00 | $32.60 | $35.76 | $42.00 |
| 202E38000 GUARDRAIL REMOVED | 16,391 FT | $2.00 | $2.00 | $2.00 | $2.10 | $2.00 |
| 202E58000 MANHOLE REMOVED | 3 EACH | $400 | $1,300 | $2,882 | $3,163 | $2,700 |
| 202E58100 CATCH BASIN REMOVED | 67 EACH | $250 | $420 | $1,568 | $1,721 | $100 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 2,176 FT | $17.00 | $29.00 | $24.20 | $26.53 | $19.00 |
| 202E75000 FENCE REMOVED | 40,824 FT | $2.50 | $1.70 | $2.10 | $1.64 | $2.10 |
| 202E98100 REMOVAL MISC.:INSPECTION WELL | 2 EACH | $500 | $300 | $450 | $1,217 | $225 |
| 202E98200 REMOVAL MISC.:CONDUIT | 200 FT | $10.00 | $16.00 | $20.00 | $12.17 | $11.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 25 CY | $30.00 | $25.00 | $171 | $171 | $25.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 3,990 CY | $15.00 | $25.00 | $48.75 | $53.50 | $43.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 3,990 CY | $60.00 | $75.00 | $67.00 | $73.67 | $61.50 |
| 204E50000 GEOTEXTILE FABRIC | 11,970 SY | $3.00 | $0.30 | $1.50 | $1.65 | $1.25 |
| 206E11000 CURING COAT | 261,835 SY | $1.20 | $1.20 | $1.15 | $1.26 | $1.15 |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 4,407 SY | $2.75 | $3.00 | $2.95 | $6.65 | $5.50 |
| 206E20000 TEST ROLLING | 150 HOUR | $125 | $300 | $135 | $313 | $220 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $39,000 | $40,000 | $39,000 | $52,500 | $39,000 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 292 STA | $250 | $152 | $60.00 | $371 | $225 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 300 FT | $35.40 | $37.00 | $35.40 | $37.17 | $35.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH 2016 | 37 EACH | $2,675 | $2,700 | $2,675 | $2,809 | $2,675 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 27 EACH | $1,380 | $1,400 | $1,380 | $1,449 | $1,380 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 21 EACH | $2,450 | $2,500 | $2,450 | $2,573 | $2,450 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 9 EACH | $565 | $600 | $565 | $593 | $565 |
| 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO | 10,214 FT | $35.00 | $34.00 | $37.00 | $41.58 | $41.00 |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 12 EACH | $4,280 | $4,500 | $4,280 | $4,494 | $4,280 |
| 606E55190 SPECIAL - CABLE BARRIER, POST REFLECTOR | 116 EACH | $14.00 | $14.00 | $14.00 | $14.70 | $14.00 |
| 607E40500 GATE, TYPE 47 | 63 EACH | $1,100 | $1,200 | $1,085 | $1,155 | $1,085 |
| 622E24000 CONCRETE BARRIER, TYPE D | 713 FT | $114 | $162 | $138 | $145 | $110 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 20 EACH | $5,700 | $5,600 | $3,400 | $3,570 | $2,500 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 24 EACH | $5,400 | $5,600 | $3,400 | $3,570 | $2,800 |
| 623E11000 PROVIDING ELECTRONIC INSTRUMENTATION | 1 LS | $50,000 | $28,000 | $5,000 | $15,000 | $30,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 4 EACH | $550 | $450 | $875 | $774 | $375 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 6 EACH | $5,000 | $350 | $850 | $1,588 | $1,500 |
| 690E98400 SPECIAL -AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $10,000 | $7,500 | $125,000 | $24,023 | $5,000 |
| 690E98400 SPECIAL -SURVEY CONTROL VERIFICATION | 1 LS | $25,000 | $13,000 | $60,000 | $2,000 | $6,500 |
| 601E11000 RIPRAP, TYPE D | 93 SY | $140 | $430 | $1,795 | $1,970 | $300 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 93 SY | $120 | $190 | $137 | $150 | $110 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 301 SY | $130 | $110 | $90.00 | $98.42 | $75.00 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 778 CY | $145 | $43.00 | $265 | $291 | $180 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 74 CY | $165 | $78.00 | $475 | $522 | $225 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 46 CY | $175 | $150 | $781 | $857 | $250 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $26.00 | $25.00 | $52.50 | $25.00 |
| 659E00300 TOPSOIL | 26,935 CY | $10.00 | $11.00 | $20.50 | $22.46 | $5.00 |
| 659E10000 SEEDING AND MULCHING | 190,487 SY | $0.65 | $0.65 | $0.65 | $0.72 | $0.65 |
| 659E14000 REPAIR SEEDING AND MULCHING | 9,525 SY | $1.00 | $0.65 | $0.65 | $0.16 | $0.65 |
| 659E15000 INTER-SEEDING | 9,525 SY | $0.01 | $0.10 | $0.01 | $0.26 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 51.5 TON | $300 | $300 | $300 | $1,260 | $300 |
| 659E31000 LIME | 39.4 ACRE | $25.00 | $25.00 | $25.00 | $52.50 | $25.00 |
| 659E35000 WATER | 1,543 MGAL | $10.00 | $0.10 | $0.01 | $0.53 | $0.01 |
| 659E40000 MOWING | 429 MSF | $1.00 | $1.00 | $1.00 | $5.25 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 52,110 SY | $1.25 | $1.30 | $1.25 | $1.68 | $1.25 |
| 670E00700 DITCH EROSION PROTECTION | 2,500 SY | $1.35 | $1.40 | $1.35 | $2.10 | $1.35 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 2,614 SY | $1.35 | $1.40 | $1.35 | $2.63 | $1.35 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,850 | $4,000 | $5,000 | $4,043 | $3,850 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $32,000 | $36,000 | $30,000 | $33,007 | $32,400 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $23,325 | $25,000 | $30,000 | $28,923 | $31,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 115 SY | $8.00 | $5.00 | $5.00 | $12.60 | $5.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, ST | 1 LS | $58,000 | $40,000 | $24,115 | $26,462 | $9,700 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, ST | 1 LS | $230,000 | $40,000 | $24,115 | $26,462 | $10,000 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, ST | 1 LS | $33,000 | $120,000 | $24,115 | $26,462 | $8,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 10 CY | $45.00 | $175 | $334 | $367 | $60.00 |
| 602E20000 CONCRETE MASONRY | 23.2 CY | $1,800 | $2,500 | $4,090 | $4,488 | $2,500 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 38,514 FT | $12.00 | $14.00 | $11.30 | $14.62 | $17.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 1,911 FT | $12.00 | $18.00 | $11.50 | $33.81 | $32.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 3,853 FT | $22.00 | $25.00 | $19.00 | $35.38 | $32.00 |
| 611E05900 15" CONDUIT, TYPE B | 303 FT | $97.00 | $132 | $117 | $128 | $120 |
| 611E06100 15" CONDUIT, TYPE C | 2,025 FT | $85.00 | $81.00 | $79.00 | $90.70 | $105 |
| 611E06700 15" CONDUIT, TYPE F TYPE C, 707.05, OR 707.21 | 586 FT | $112 | $105 | $156 | $171 | $155 |
| 611E07200 18" CONDUIT, TYPE A, 706.02 | 16 FT | $1,200 | $150 | $546 | $599 | $340 |
| 611E07400 18" CONDUIT, TYPE B | 164 FT | $205 | $244 | $141 | $158 | $155 |
| 611E07600 18" CONDUIT, TYPE C | 212 FT | $98.00 | $105 | $111 | $126 | $115 |
| 611E07600 18" CONDUIT, TYPE C 706.02 | 785 FT | $105 | $110 | $134 | $152 | $125 |
| 611E08200 18" CONDUIT, TYPE F TYPE C, 707.05, OR 707.21 | 65 FT | $135 | $126 | $161 | $177 | $205 |
| 611E10200 24" CONDUIT, TYPE A 706.02 | 12 FT | $1,850 | $233 | $1,426 | $1,565 | $550 |
| 611E10400 24" CONDUIT, TYPE B | 75 FT | $122 | $198 | $174 | $195 | $200 |
| 611E11200 24" CONDUIT, TYPE F TYPE C, 707.05, OR 707.21 | 50 FT | $178 | $148 | $219 | $240 | $225 |
| 611E13600 30" CONDUIT, TYPE C | 288 FT | $183 | $490 | $356 | $395 | $340 |
| 611E16200 36" CONDUIT, TYPE A 706.02 | 40 FT | $825 | $643 | $601 | $663 | $500 |
| 611E16200 36" CONDUIT, TYPE A 707.01 | 93 FT | $940 | $485 | $369 | $409 | $340 |
| 611E16400 36" CONDUIT, TYPE B 707.01 | 38 FT | $175 | $410 | $472 | $522 | $375 |
| 611E19200 42" CONDUIT, TYPE A 706.02 | 24 FT | $930 | $520 | $787 | $863 | $600 |
| 611E19200 42" CONDUIT, TYPE A 707.01 | 12 FT | $1,010 | $365 | $449 | $493 | $550 |
| 611E20700 48" CONDUIT, TYPE A 706.02 | 24 FT | $1,200 | $635 | $967 | $1,061 | $725 |
| 611E23600 60" CONDUIT, TYPE A 707.02 | 24 FT | $1,500 | $460 | $833 | $914 | $825 |
| 611E96600 CONDUIT, BORED OR JACKED 18'', 748.06 | 312 FT | $870 | $575 | $539 | $521 | $435 |
| 611E96600 CONDUIT, BORED OR JACKED 24'', 748.06 | 349 FT | $1,000 | $575 | $611 | $591 | $475 |
| 611E96600 CONDUIT, BORED OR JACKED 6" , 748.06 | 750 FT | $400 | $140 | $192 | $188 | $60.00 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 100 FT | $25.00 | $35.00 | $148 | $166 | $30.00 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 100 FT | $20.00 | $25.00 | $136 | $153 | $28.00 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 100 FT | $15.00 | $25.00 | $85.00 | $92.81 | $28.00 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 100 FT | $15.00 | $25.00 | $84.00 | $92.31 | $28.00 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $3,800 | $4,600 | $7,339 | $8,046 | $5,500 |
| 611E98230 CATCH BASIN, NO. 4 | 21 EACH | $4,100 | $5,000 | $9,329 | $10,229 | $5,800 |
| 611E98300 CATCH BASIN, NO. 5 | 5 EACH | $3,700 | $4,300 | $5,793 | $6,349 | $5,500 |
| 611E98341 CATCH BASIN, NO. 5A | 2 EACH | $3,800 | $5,500 | $12,610 | $13,830 | $8,500 |
| 611E98434 CATCH BASIN, NO. 8A | 2 EACH | $4,400 | $6,400 | $13,222 | $14,502 | $8,400 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,500 | $3,600 | $5,065 | $5,550 | $5,000 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $600 | $760 | $1,477 | $1,621 | $2,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $2,300 | $1,300 | $1,593 | $1,748 | $3,000 |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $4,400 | $10,000 | $17,137 | $18,797 | $14,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 36 EACH | $300 | $350 | $400 | $808 | $400 |
| 611E99720 INSPECTION WELL | 2 EACH | $700 | $750 | $1,955 | $2,145 | $900 |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 520 FT | $530 | — | $521 | $744 | $600 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 60" DIAMETER | 520 FT | — | $650 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 400 FT | $285 | — | $278 | $465 | $340 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 36" DIAMETER | 400 FT | — | $300 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 378 FT | $335 | — | $281 | $391 | $345 |
| 899E10000 CURED-IN-PLACE PIPE LINERCURED-IN-PLACE PIPE LINER | 378 FT | — | $300 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 280 FT | $500 | — | $374 | $463 | $450 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 48" DIAMETER | 280 FT | — | $480 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 248 FT | $610 | — | $509 | $612 | $650 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 54" DIAMETER | 248 FT | — | $500 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 284 FT | $670 | — | $549 | $848 | $680 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 60" DIAMETER | 284 FT | — | $650 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 216 FT | $430 | — | $354 | $460 | $475 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 42" DIAMETER | 216 FT | — | $380 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 374 FT | $600 | — | $485 | $618 | $580 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 54" DIAMETER | 374 FT | — | $550 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 348 FT | $340 | — | $284 | $591 | $340 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 36" DIAMETER | 348 FT | — | $300 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 477 FT | $302 | — | $289 | $412 | $345 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 36" DIAMETER | 477 FT | — | $320 | — | — | — |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 232 FT | $475 | — | $327 | $793 | $440 |
| 899E10000 CURED-IN-PLACE PIPE LINER, 36" DIAMETER | 232 FT | — | $330 | — | — | — |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 42,917 SY | $2.00 | $3.50 | $2.50 | $2.63 | $1.50 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 4 CY | $350 | $1,000 | $900 | $525 | $780 |
| 407E20000 NON-TRACKING TACK COAT(0.055 GAL/SY) | 24,307 GAL | $5.00 | $3.20 | $3.05 | $3.20 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 5,031 GAL | $3.00 | $3.50 | $5.00 | $5.25 | $6.00 |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 14,890 CY | $32.00 | $2.40 | $6.00 | $6.30 | $0.50 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 10 CY | $600 | $676 | $800 | $840 | $675 |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (12 CY | $500 | $668 | $750 | $788 | $550 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (885 CY | $265 | $312 | $425 | $363 | $337 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 200 FT | $50.00 | $100 | $68.55 | $75.21 | $70.00 |
| 609E24510 CURB, TYPE 4-C | 360 FT | $18.00 | $55.00 | $76.85 | $84.33 | $55.00 |
| 609E56000 6" CONCRETE TRAFFIC ISLAND | 42 CY | $510 | $500 | $389 | $426 | $700 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 703 CY | $40.00 | $105 | $85.00 | $89.25 | $135 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 14 MILE | $993 | $1,000 | $1,650 | $1,447 | $1,200 |
| 625E00450 CONNECTION, FUSED PULL APART | 34 EACH | $120 | $160 | $140 | $137 | $185 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 17 EACH | $120 | $160 | $125 | $137 | $185 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 45 EACH | $100 | $160 | $167 | $126 | $185 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 17 EACH | $3,700 | $3,300 | $3,375 | $3,197 | $3,988 |
| 625E11200 LIGHT TOWER, BB100 | 9 EACH | $25,300 | $24,000 | $9,375 | $26,250 | $27,880 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 17 EACH | $2,150 | $1,300 | $2,395 | $1,967 | $1,708 |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 9 EACH | $3,500 | $8,300 | $7,450 | $17,095 | $10,308 |
| 625E15201 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, AS PER PLA | 14 EACH | $9,500 | $11,000 | $7,945 | $17,095 | $10,720 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 4,815 FT | $4.90 | $4.00 | $3.35 | $4.20 | $5.89 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,805 FT | $1.75 | $1.60 | $0.85 | $1.58 | $1.58 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 19,361 FT | $12.90 | $11.00 | $16.65 | $14.18 | $14.19 |
| 625E25500 CONDUIT, 3", 725.04 | 10 FT | $36.00 | $40.00 | $45.65 | $30.45 | $29.16 |
| 625E25501 CONDUIT, 3", 725.04, AS PER PLAN | 112 FT | $38.00 | $85.00 | $25.35 | $54.60 | $31.56 |
| 625E25601 CONDUIT, 4", 725.04, AS PER PLAN | 60 FT | $41.00 | $150 | $34.15 | $55.65 | $113 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 475 FT | $55.00 | $60.00 | $82.25 | $64.05 | $74.60 |
| 625E25911 CONDUIT CLEANED AND CABLES REMOVED, AS PER PLAN | 110 FT | $2.75 | $1.00 | $2.50 | $0.53 | $6.70 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 17 EACH | $580 | $400 | $360 | $341 | $435 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 46 EACH | $585 | $1,200 | $1,260 | $1,360 | $1,205 |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL | 5 EACH | $720 | $650 | $885 | $687 | $4,380 |
| 625E29002 TRENCH, 24" DEEP | 13,724 FT | $9.00 | $7.00 | $3.95 | $8.19 | $6.05 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $1,000 | $1,000 | $865 | $1,031 | $1,116 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,100 | $1,300 | $920 | $1,176 | $1,382 |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 8 EACH | $1,000 | $2,000 | $1,270 | $1,377 | $2,488 |
| 625E32000 GROUND ROD | 62 EACH | $248 | $200 | $200 | $341 | $296 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $17,500 | $8,000 | $6,415 | $13,456 | $6,604 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 13,724 FT | $0.40 | $0.25 | $0.20 | $2.10 | $2.57 |
| 625E37001 SERVICE TO UNDERPASS LIGHTING, AS PER PLAN | 1 LS | $75,000 | $13,000 | $6,715 | $8,621 | $14,070 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 2 EACH | $135 | $200 | $1,005 | $525 | $7,032 |
| 625E75361 LIGHT TOWER REMOVED FOR STORAGE, AS PER PLAN | 14 EACH | $300 | $1,600 | $2,170 | $750 | $2,060 |
| 625E75505 LUMINAIRE REMOVED FOR STORAGE, AS PER PLAN | 14 EACH | $65.00 | $52.00 | $300 | $52.50 | $688 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $635 | $1,500 | $3,050 | $467 | $464 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 14 EACH | $85.00 | $500 | $625 | $473 | $988 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(EX. LCC "B") | 1 EACH | $1,200 | $500 | $2,145 | $721 | $2,572 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(LCC "A") | 1 EACH | $1,200 | $500 | $2,145 | $721 | $2,572 |
| 625E98000 LIGHTING, MISC.: PULL BOX CLEANED | 1 EACH | $20.00 | $160 | $145 | $210 | $374 |
| 625E98000 LIGHTING, MISC.:LIGHT TOWER, INSTALLATION ONLY | 14 EACH | $2,780 | $1,000 | $1,975 | $788 | $1,760 |
| 625E98200 LIGHTING, MISC.:CIRCUIT REPAIR | 1 LS | $25,000 | $5,000 | $2,770 | $30,272 | $988 |
| 625E98200 LIGHTING, MISC.:REMOVAL OF TEMPORARY LIGHTING | 1 LS | $50,000 | $5,000 | $6,565 | $5,250 | $9,880 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $50,000 | $25,000 | $9,215 | $11,005 | $33,840 |
| 620E00501 DELINEATOR, POST GROUND MOUNTED, AS PER PLAN | 34 EACH | $95.00 | $100 | $95.00 | $99.75 | $95.00 |
| 620E31200 REMOVAL OF DELINEATOR | 21 EACH | $10.00 | $10.00 | $10.00 | $10.50 | $10.00 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 7 EACH | $85.00 | $140 | $135 | $142 | $135 |
| 621E00100 RPM | 1,021 EACH | $34.50 | $45.00 | $34.50 | $36.98 | $34.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 571 EACH | $5.00 | $6.00 | $4.00 | $20.09 | $10.00 |
| 625E32000 GROUND ROD | 20 EACH | $300 | $420 | $72.25 | $341 | $250 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1-WAY | 26 EACH | $10.00 | $12.00 | $11.80 | $14.70 | $11.80 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 320 EACH | $12.00 | $13.00 | $12.50 | $13.65 | $12.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 1,671.5 FT | $13.00 | $13.00 | $13.00 | $13.65 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 929.8 FT | $14.00 | $14.00 | $14.00 | $14.70 | $14.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 272.8 FT | $16.00 | $17.00 | $16.00 | $16.80 | $16.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 186.8 FT | $35.00 | $36.00 | $35.00 | $36.75 | $35.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 143.1 FT | $43.00 | $45.00 | $43.00 | $45.15 | $43.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 41 FT | $55.00 | $56.00 | $55.00 | $57.75 | $55.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 98 FT | $62.00 | $65.00 | $62.00 | $65.10 | $62.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 202.4 FT | $44.00 | $45.00 | $44.00 | $46.20 | $44.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 115.6 FT | $80.00 | $85.00 | $80.00 | $84.00 | $80.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 47 FT | $14.00 | $14.00 | $14.00 | $14.70 | $14.00 |
| 630E08600 SIGN POST REFLECTOR | 30 EACH | $45.00 | $46.00 | $45.00 | $47.25 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 38 EACH | $525 | $530 | $525 | $551 | $525 |
| 630E72330 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10 | 1 EACH | $35,000 | $40,000 | $37,850 | $39,743 | $37,850 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 5 EACH | $38,000 | $45,000 | $42,750 | $44,888 | $42,750 |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 2 EACH | $66,000 | $70,000 | $69,450 | $72,923 | $69,450 |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 5 EACH | $93,000 | $100,000 | $95,500 | $100,275 | $95,500 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 3 EACH | $195 | $205 | $195 | $205 | $195 |
| 630E80100 SIGN, FLAT SHEET | 1,421.9 SF | $14.00 | $14.00 | $14.00 | $14.70 | $14.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 59 SF | $15.00 | $16.00 | $15.00 | $15.75 | $15.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,270.5 SF | $22.00 | $23.00 | $22.00 | $23.10 | $22.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 3,948.5 SF | $22.00 | $23.00 | $22.00 | $23.10 | $22.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 36 EACH | $675 | $700 | $675 | $709 | $675 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 22 EACH | $7,000 | $8,000 | $7,480 | $7,854 | $7,480 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 366 EACH | $10.00 | $10.00 | $10.00 | $10.50 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $65.00 | $70.00 | $65.00 | $68.25 | $65.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 16 EACH | $125 | $130 | $125 | $131 | $125 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 260 EACH | $15.00 | $16.00 | $15.00 | $15.75 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 38 EACH | $350 | $370 | $350 | $368 | $350 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 10 EACH | $250 | $260 | $250 | $263 | $250 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 29 EACH | $200 | $210 | $200 | $210 | $200 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $20.00 | $20.00 | $20.00 | $21.00 | $20.00 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 6 EACH | $1,000 | $1,400 | $1,360 | $1,428 | $1,360 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 5 EACH | $2,000 | $2,200 | $2,120 | $2,226 | $2,120 |
| 646E10010 EDGE LINE, 6" | 0.15 MILE | $5,500 | $14,000 | $5,000 | $5,250 | $5,000 |
| 646E10200 CENTER LINE | 0.06 MILE | $12,500 | $19,000 | $10,000 | $10,500 | $10,000 |
| 646E10400 STOP LINE | 45 FT | $20.00 | $19.00 | $18.00 | $18.90 | $18.00 |
| 646E10620 CHEVRON MARKING | 326 FT | $20.00 | $19.00 | $18.00 | $18.90 | $18.00 |
| 646E20300 LANE ARROW | 6 EACH | $250 | $260 | $250 | $263 | $250 |
| 646E20320 WRONG WAY ARROW | 5 EACH | $325 | $330 | $325 | $341 | $325 |
| 646E20350 LANE REDUCTION ARROW | 2 EACH | $325 | $330 | $325 | $341 | $325 |
| 646E20504 DOTTED LINE, 6" | 83 FT | $2.50 | $2.50 | $2.50 | $2.63 | $2.50 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 20.62 MILE | $5,250 | $5,000 | $4,750 | $4,988 | $4,750 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 16.59 MILE | $2,700 | $2,700 | $2,600 | $2,730 | $2,600 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 9,614 FT | $2.75 | $3.00 | $2.75 | $2.89 | $2.75 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 8,096 FT | $2.00 | $2.30 | $2.25 | $2.36 | $2.25 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,700 | $2,800 | $2,750 | $2,888 | $2,750 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.50 | $1.50 | $1.50 | $1.58 | $1.50 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.75 | $1.80 | $1.75 | $1.84 | $1.75 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $6,000 | $6,200 | $6,000 | $6,300 | $6,000 |
| 850E20110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2.50 | $2.50 | $2.50 | $2.63 | $2.50 |
| 632E90300 SIGNALIZATION, MISC.: TRAFFIC SIGNAL UPDATE | 1 LS | $125,000 | $5,000 | $17,955 | $4,037 | $20,320 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 1,641 SY | $10.00 | $13.00 | $10.00 | $18.29 | $17.00 |
| 407E20000 NON-TRACKING TACK COAT | 132 GAL | $10.00 | $3.20 | $3.05 | $5.38 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 158 CY | $50.00 | $110 | $150 | $64.69 | $135 |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 69 CY | $500 | $620 | $500 | $560 | $520 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 2,400 HOUR | $95.00 | $90.00 | $110 | $74.55 | $72.50 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,249 FT | $2.00 | $0.80 | $3.50 | $3.68 | $0.35 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,200 | $2,350 | $2,121 | $2,020 |
| 614E12420 DETOUR SIGNING | 1 LS | $76,000 | $110,000 | $76,870 | $110,250 | $140,000 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 34 EACH | $185 | $190 | $275 | $194 | $320 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $40,000 | $30,000 | $20,000 | $63,263 | $32,880 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 6,180 EACH | $32.00 | $20.00 | $32.50 | $34.84 | $22.50 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 250 CY | $150 | $255 | $200 | $551 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 1 WAY | 3,277 EACH | $3.75 | $7.00 | $14.00 | $3.94 | $7.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 BIDIRECTIONAL | 334 EACH | $5.00 | $8.00 | $15.00 | $5.25 | $10.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 272 EACH | $17.00 | $8.00 | $15.00 | $18.38 | $21.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 1,826 EACH | $12.00 | $16.00 | $20.00 | $15.75 | $19.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 1,105 EACH | $15.00 | $18.00 | $22.00 | $19.43 | $21.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: BRIDGE DECK AND PAVEME | 300,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: SAFETY REPAIRS | 300,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 144 SNMT | $500 | $900 | $950 | $683 | $625 |
| 614E98000 WORK ZONE PAVEMENT MARKING, MISC.:CENTER LINE, SPR | 0.1 MILE | $10,000 | $10,000 | $10,000 | $10,500 | $10,000 |
| 614E98000 WORK ZONE PAVEMENT MARKING, MISC.:EDGE LINE, 6", S | 88.19 MILE | $3,250 | $2,800 | $2,750 | $2,888 | $2,750 |
| 614E98000 WORK ZONE PAVEMENT MARKING, MISC.:LANE LINE, 6", S | 10.08 MILE | $1,750 | $1,800 | $1,750 | $1,838 | $1,750 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:CHANNELIZING LIN | 50,226 FT | $2.25 | $2.30 | $2.25 | $2.36 | $2.25 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:DOTTED LINE, 6", | 22,948 FT | $1.75 | $1.80 | $1.75 | $1.84 | $1.75 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:GORE MARKING, SP | 197 FT | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:STOP LINE, SPRAY | 16 FT | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 |
| 614E98200 WORK ZONE PAVEMENT MARKING, MISC.:ARROW, SPRAY THE | 2 EACH | $250 | $260 | $250 | $263 | $250 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $400,000 | $1,200,000 | $500,000 | $1,352,242 | $335,000 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 4,622 SY | $50.00 | $54.00 | $25.00 | $70.89 | $75.00 |
| 616E10000 WATER | 895 MGAL | $10.00 | $65.00 | $10.00 | $121 | $75.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1.12 MILE | $9,993 | $9,500 | $9,930 | $1,447 | $750 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 45,980 FT | $9.00 | $13.00 | $16.50 | $20.43 | $13.00 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 4 EACH | $1,500 | $1,200 | $1,000 | $1,767 | $800 |
| 622E80000 GLARE SCREEN | 1,610 FT | $18.00 | $9.00 | $12.50 | $23.49 | $12.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,116 SF | $22.50 | $40.00 | $22.50 | $23.63 | $22.50 |
| 630E87101 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, A | 18 EACH | $1,700 | $720 | $1,820 | $1,911 | $1,820 |
| 630E97700 SIGNING, MISC.:TEMPORARY GROUND MOUNTED SIGN SUPPO | 21 EACH | $875 | $2,600 | $875 | $919 | $875 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 648 SNMT | $325 | $350 | $550 | $420 | $500 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 16.6 MILE | $750 | $800 | $750 | $788 | $750 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 20.5 MILE | $850 | $900 | $850 | $893 | $850 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 9,280 FT | $1.00 | $1.00 | $1.00 | $1.05 | $1.00 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 8,100 FT | $0.75 | $0.80 | $0.75 | $0.79 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 45 FT | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 16.6 MILE | $750 | $800 | $750 | $788 | $750 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.5 MILE | $850 | $900 | $850 | $893 | $850 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 9,280 FT | $1.00 | $1.00 | $1.00 | $1.05 | $1.00 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 8,100 FT | $0.75 | $0.80 | $0.75 | $0.79 | $0.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 45 FT | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $150,000 | $160,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $35.00 | $32.00 | $75.00 | $78.75 | $125 |
| 503E21100 UNCLASSIFIED EXCAVATION | 185 CY | $75.00 | $135 | $125 | $425 | $355 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $10,000 | $40,000 | $15,750 | $40,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,030 FT | $36.00 | $35.00 | $46.00 | $47.25 | $44.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 930 FT | $20.00 | $37.00 | $26.00 | $26.25 | $18.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 32,875 LB | $2.48 | $2.75 | $2.40 | $2.94 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $1.50 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 2,913 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $21.00 | $52.50 | $40.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 61 CY | $1,400 | $1,750 | $1,225 | $1,470 | $2,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 30 CY | $790 | $1,230 | $1,650 | $1,208 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 19 CY | $960 | $5,000 | $1,700 | $1,523 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 21 CY | $920 | $2,700 | $1,000 | $1,260 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 39 CY | $650 | $1,235 | $675 | $761 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 15 SY | $30.00 | $75.00 | $23.00 | $47.25 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 290 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 43,635 LB | $2.70 | $3.00 | $2.85 | $2.63 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 498 EACH | $6.75 | $7.00 | $6.50 | $6.30 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 629 SF | $50.00 | $50.00 | $50.00 | $55.14 | $50.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 629 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,312 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,312 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $100 | $100 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 107 FT | $45.00 | $65.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $12.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 92 SF | $10.00 | $13.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 30 FT | $50.00 | $41.00 | $40.00 | $18.90 | $48.00 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $2,200 | $2,400 | $2,000 | $3,570 | $3,000 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,700 | $2,000 | $1,650 | $2,730 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $95.00 | $80.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 60 FT | $35.00 | $6.00 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 30 FT | $50.00 | $8.00 | $55.00 | $27.30 | $21.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 302 SY | $440 | $400 | $400 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 107 FT | $250 | $400 | $140 | $247 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 142 SY | $38.00 | $40.00 | $55.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $5,300 | $9,000 | $4,976 | $6,332 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $150,000 | $160,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $35.00 | $24.00 | $75.00 | $78.75 | $125 |
| 503E21100 UNCLASSIFIED EXCAVATION | 187 CY | $75.00 | $130 | $135 | $404 | $355 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $10,000 | $30,000 | $15,750 | $35,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,010 FT | $36.00 | $35.00 | $46.00 | $47.25 | $44.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 910 FT | $20.00 | $37.00 | $26.00 | $26.25 | $18.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 33,459 LB | $2.48 | $2.60 | $2.40 | $2.89 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $3.00 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 2,913 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $22.00 | $52.50 | $40.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 62 CY | $1,400 | $1,750 | $1,225 | $1,470 | $2,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 30 CY | $790 | $1,230 | $1,650 | $1,208 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 20 CY | $960 | $5,000 | $1,700 | $1,523 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 21 CY | $920 | $2,500 | $1,000 | $1,260 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 39 CY | $650 | $1,200 | $675 | $761 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 15 SY | $30.00 | $76.00 | $23.00 | $47.25 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 293 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 43,750 LB | $2.65 | $3.00 | $2.85 | $2.89 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 498 EACH | $6.75 | $7.00 | $6.50 | $6.30 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 629 SF | $50.00 | $50.00 | $50.00 | $55.14 | $50.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 629 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,324 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,324 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $100 | $110 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 107 FT | $45.00 | $65.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $13.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 93 SF | $10.00 | $14.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 30 FT | $50.00 | $40.00 | $40.00 | $18.90 | $48.00 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $2,200 | $2,400 | $2,000 | $3,570 | $3,000 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,700 | $2,000 | $1,650 | $2,730 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 23 CY | $95.00 | $80.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 60 FT | $35.00 | $6.00 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 30 FT | $50.00 | $8.00 | $50.00 | $27.30 | $21.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 302 SY | $440 | $375 | $440 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 107 FT | $250 | $325 | $150 | $247 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 148 SY | $38.00 | $35.00 | $55.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $2,500 | $9,000 | $4,976 | $6,332 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $150,000 | $155,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 246 SY | $35.00 | $32.00 | $75.00 | $78.75 | $125 |
| 503E21100 UNCLASSIFIED EXCAVATION | 189 CY | $75.00 | $125 | $125 | $394 | $355 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $10,000 | $30,000 | $15,750 | $30,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 570 FT | $24.00 | $35.00 | $30.00 | $36.75 | $16.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 630 FT | $33.00 | $37.00 | $46.00 | $47.25 | $45.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 420 FT | $26.00 | $48.00 | $35.00 | $36.75 | $40.00 |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 460 FT | $68.00 | $67.00 | $70.00 | $89.25 | $88.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 32,668 LB | $2.45 | $2.75 | $2.40 | $2.84 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $3.00 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 2,821 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $22.00 | $52.50 | $40.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 59 CY | $1,400 | $1,750 | $1,300 | $1,470 | $2,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 29 CY | $790 | $1,300 | $1,650 | $1,208 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 19 CY | $960 | $5,000 | $1,850 | $1,523 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 21 CY | $920 | $2,700 | $1,000 | $1,260 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 41 CY | $650 | $1,200 | $675 | $830 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 15 SY | $30.00 | $75.00 | $23.00 | $47.25 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 282 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 41,755 LB | $2.70 | $3.00 | $2.85 | $3.13 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 480 EACH | $6.75 | $7.00 | $6.50 | $6.56 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 547 SF | $50.00 | $50.00 | $50.00 | $55.14 | $50.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 547 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 2,911 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 2,911 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $100 | $100 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 110 FT | $45.00 | $65.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $13.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 96 SF | $10.00 | $14.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 30 FT | $50.00 | $40.00 | $40.00 | $18.90 | $48.00 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $2,200 | $2,400 | $2,000 | $3,570 | $3,000 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,700 | $1,900 | $1,600 | $2,730 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 23 CY | $95.00 | $80.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 60 FT | $35.00 | $6.00 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $50.00 | $8.00 | $50.00 | $27.30 | $21.00 |
| 523E20001 DYNAMIC LOAD TESTING, AS PER PLAN | 4 EACH | $4,000 | $5,500 | $4,000 | $8,925 | $4,000 |
| 523E20501 RESTRIKE, AS PER PLAN | 4 EACH | $2,000 | $1,500 | $4,000 | $683 | $1,600 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 303 SY | $480 | $400 | $425 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 110 FT | $250 | $400 | $150 | $247 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 155 SY | $38.00 | $37.00 | $55.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $2,600 | $9,000 | $4,976 | $6,332 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $150,000 | $155,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 245 SY | $35.00 | $24.00 | $75.00 | $78.75 | $125 |
| 503E21100 UNCLASSIFIED EXCAVATION | 174 CY | $75.00 | $135 | $125 | $420 | $365 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $10,000 | $30,000 | $15,750 | $30,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 570 FT | $24.00 | $35.00 | $30.00 | $36.75 | $16.00 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 630 FT | $33.00 | $37.00 | $46.00 | $47.25 | $45.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 420 FT | $26.00 | $45.00 | $35.00 | $36.75 | $40.00 |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 460 FT | $68.00 | $67.00 | $70.00 | $89.25 | $88.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 33,156 LB | $2.45 | $2.65 | $2.40 | $2.84 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $3.00 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 2,821 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $22.00 | $52.50 | $40.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 60 CY | $1,400 | $1,750 | $1,225 | $1,470 | $2,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 29 CY | $790 | $1,300 | $1,650 | $1,208 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 20 CY | $960 | $5,000 | $1,750 | $1,523 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 21 CY | $920 | $2,700 | $1,000 | $1,145 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 41 CY | $625 | $1,200 | $675 | $830 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 15 SY | $30.00 | $80.00 | $23.00 | $47.25 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 285 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 41,911 LB | $2.70 | $3.00 | $2.85 | $2.89 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 480 EACH | $6.75 | $7.00 | $6.50 | $6.56 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 547 SF | $50.00 | $50.00 | $50.00 | $55.14 | $50.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 547 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 2,926 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 2,926 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 2 MNHR | $100 | $100 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 110 FT | $45.00 | $65.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $13.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 96 SF | $10.00 | $14.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 30 FT | $50.00 | $50.00 | $40.00 | $18.90 | $48.00 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $2,200 | $2,400 | $2,000 | $3,570 | $3,000 |
| 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,700 | $1,800 | $1,600 | $2,730 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $95.00 | $90.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 60 FT | $35.00 | $7.70 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $50.00 | $8.00 | $55.00 | $27.30 | $21.00 |
| 523E20001 DYNAMIC LOAD TESTING, AS PER PLAN | 4 EACH | $4,000 | $5,000 | $4,000 | $8,925 | $4,000 |
| 523E20501 RESTRIKE, AS PER PLAN | 4 EACH | $2,000 | $1,500 | $4,000 | $683 | $1,600 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 302 SY | $480 | $375 | $440 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 110 FT | $250 | $300 | $150 | $247 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 160 SY | $38.00 | $36.00 | $55.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $2,500 | $9,000 | $4,976 | $6,332 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $100,000 | $150,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 230 SY | $35.00 | $32.00 | $75.00 | $78.75 | $125 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $80,000 | $45,000 | $35,000 | $21,000 | $50,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 140 CY | $75.00 | $150 | $160 | $630 | $215 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $10,000 | $30,000 | $15,750 | $30,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 780 FT | $24.00 | $39.00 | $35.00 | $36.75 | $16.00 |
| 507E00551 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 840 FT | $33.00 | $35.00 | $46.00 | $47.25 | $45.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 33,438 LB | $2.60 | $2.75 | $2.40 | $2.99 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $3.00 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 3,238 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $22.00 | $52.50 | $40.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 72 CY | $1,400 | $1,750 | $1,225 | $1,523 | $2,000 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 33 CY | $790 | $1,200 | $1,650 | $1,050 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 22 CY | $960 | $4,500 | $1,700 | $1,208 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 30 CY | $920 | $1,750 | $1,000 | $1,145 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 31 CY | $625 | $1,500 | $675 | $809 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $50.00 | $100 | $23.00 | $94.50 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 317 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 47,770 LB | $2.74 | $3.00 | $3.15 | $3.29 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 762 EACH | $6.75 | $7.00 | $6.50 | $6.30 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 769 SF | $65.00 | $65.00 | $65.00 | $71.68 | $65.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 769 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,223 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,223 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 1 MNHR | $100 | $100 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 122 FT | $45.00 | $62.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $13.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 47 SF | $10.00 | $14.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 34 FT | $50.00 | $40.00 | $40.00 | $18.90 | $48.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,500 | $1,700 | $1,800 | $2,730 | $3,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,900 | $2,000 | $1,500 | $3,570 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 4 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 25 CY | $95.00 | $90.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 58 FT | $35.00 | $6.00 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 58 FT | $50.00 | $8.00 | $50.00 | $27.30 | $21.00 |
| 523E20001 DYNAMIC LOAD TESTING, AS PER PLAN | 2 EACH | $4,000 | $5,000 | $4,000 | $1,260 | $4,000 |
| 523E20501 RESTRIKE, AS PER PLAN | 4 EACH | $2,000 | $1,500 | $4,000 | $1,260 | $1,600 |
| 524E94946 DRILLED SHAFTS, 72" DIAMETER, ABOVE BEDROCK | 114 FT | $1,100 | $975 | $1,075 | $1,575 | $1,600 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 307 SY | $440 | $400 | $450 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 122 FT | $250 | $350 | $150 | $278 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 478 SY | $38.00 | $25.00 | $60.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $2,500 | $9,000 | $4,976 | $6,332 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 2 EACH | $4,250 | $4,300 | $5,800 | $5,775 | $9,200 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 120 FT | $65.00 | $50.00 | $25.00 | $55.00 | $70.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $100,000 | $150,000 | $57,750 | $75,000 |
| 202E22900 APPROACH SLAB REMOVED | 274 SY | $35.00 | $23.00 | $75.00 | $78.75 | $125 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $60,000 | $40,000 | $35,000 | $525 | $50,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 142 CY | $75.00 | $150 | $150 | $840 | $215 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $7,500 | $30,000 | $15,750 | $30,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 810 FT | $24.00 | $37.00 | $35.00 | $36.75 | $16.00 |
| 507E00551 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 870 FT | $33.00 | $35.00 | $46.00 | $47.25 | $45.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 37,285 LB | $2.46 | $2.75 | $2.40 | $2.99 | $2.65 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $3.00 | $2.00 | $2.00 | $2.63 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 3,407 FT | $2.00 | $2.00 | $1.90 | $2.00 | $1.90 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 22 EACH | $30.00 | $32.00 | $22.00 | $52.50 | $40.00 |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 81 CY | $1,400 | $1,550 | $1,225 | $1,470 | $2,100 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 36 CY | $790 | $1,100 | $1,650 | $1,050 | $1,100 |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 25 CY | $960 | $4,500 | $1,700 | $1,208 | $1,700 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 37 CY | $920 | $1,650 | $1,000 | $1,145 | $1,400 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 32 CY | $625 | $1,450 | $675 | $809 | $575 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $30.00 | $100 | $23.00 | $94.50 | $34.00 |
| 512E75500 SPECIAL - SEALING, SEALING OF CONCRETE SURFACES | 353 SY | $24.00 | $25.00 | $30.00 | $27.10 | $24.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 51,445 LB | $2.75 | $3.00 | $3.05 | $3.23 | $3.10 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 906 EACH | $6.75 | $7.00 | $6.50 | $6.30 | $7.60 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 834 SF | $65.00 | $65.00 | $65.00 | $71.68 | $65.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 834 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 3,500 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 3,500 SF | $4.00 | $4.00 | $4.00 | $4.41 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 1 MNHR | $100 | $100 | $100 | $110 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 3 EACH | $300 | $300 | $300 | $331 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 141 FT | $45.00 | $57.00 | $50.00 | $47.25 | $48.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $13.00 | $6.00 | $7.88 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 47 SF | $10.00 | $14.00 | $9.00 | $10.50 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 38 FT | $50.00 | $49.00 | $40.00 | $18.90 | $48.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,500 | $1,750 | $1,800 | $2,730 | $3,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $1,900 | $2,000 | $1,500 | $3,570 | $3,000 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 3 EACH | $5,000 | $1,800 | $5,600 | $7,875 | $6,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 24 CY | $95.00 | $92.00 | $125 | $131 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 55 FT | $35.00 | $7.00 | $20.00 | $21.00 | $21.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 59 FT | $50.00 | $8.00 | $55.00 | $27.30 | $21.00 |
| 523E20001 DYNAMIC LOAD TESTING, AS PER PLAN | 2 EACH | $4,000 | $5,000 | $4,000 | $1,260 | $4,000 |
| 523E20501 RESTRIKE, AS PER PLAN | 4 EACH | $2,000 | $1,500 | $4,000 | $1,260 | $1,600 |
| 524E94946 DRILLED SHAFTS, 72" DIAMETER, ABOVE BEDROCK | 114 FT | $1,100 | $900 | $1,075 | $1,575 | $1,600 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 351 SY | $440 | $450 | $425 | $420 | $400 |
| 526E90030 TYPE C INSTALLATION | 140 FT | $250 | $275 | $150 | $247 | $245 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 587 SY | $38.00 | $22.00 | $60.00 | $89.25 | $45.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $9,000 | $10,000 | $9,000 | $5,040 | $6,332 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 2 EACH | $4,250 | $4,000 | $5,800 | $5,775 | $9,200 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 60 FT | $65.00 | $75.00 | $25.00 | $55.00 | $105 |
| 518E63300 STRUCTURE DRAINAGE, MISC.:BRIDGE DRAINAGE SYSTEM | 1 LS | $42,000 | $17,500 | $36,000 | $37,800 | $30,000 |
| 100E51200 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION ADVIS | 38,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $400,000 | $400,000 | $500,000 | $247,382 | $365,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $40,000 | $15,000 | $100,000 | $86,719 | $5,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 42 MNTH | $3,200 | $4,500 | $5,800 | $7,619 | $5,300 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $210,000 | $800,000 | $1,500,000 | $582,710 | $575,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 46,629 CY | $132 | $6.16M | 11% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 63,156 SY | $50 | $3.16M | 6% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 10,995 CY | $250 | $2.75M | 5% |
| 304E20000 AGGREGATE BASE | 41,777 CY | $60 | $2.51M | 5% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 10,737 CY | $215 | $2.31M | 4% |
| 203E10000 EXCAVATION | 145,967 CY | $15 | $2.19M | 4% |
| 452E14122 11.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 18,771 SY | $115 | $2.16M | 4% |
| 202E23000 PAVEMENT REMOVED | 129,667 SY | $15 | $1.95M | 4% |
| 206E10500 CEMENT | 6,814 TON | $203 | $1.38M | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 86,521 FT | $11.5 | $995k | 2% |