LIC-SR 16/SR 79-20.26/12.46
LIC County · est $6.0M
Bid dateThursday, September 14—
LIC County · est $6.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 89 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 13,022 CY | $238 | $305 | 56% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 267,722 SY | $3.15 | $2.60 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $325,000 | $680,184 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | 4% |
| 253E02000 PAVEMENT REPAIR | 300 CY | $520 | $760 | 3% |
| 858E10000 THIN POLYMER EPOXY OVERLAY | 1,361 SY | $73.50 | $73.50 | 2% |
| 644E00104 EDGE LINE, 6" | 21.91 MILE | $3,935 | $3,935 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,263 CY | $9.00 | $1.00 | 2% |
| 858E10000 THIN POLYMER EPOXY OVERLAY | 1,094 SY | $73.50 | $73.50 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 21,427 GAL | $3.70 | $2.65 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 389 CY | $185 | $40.00 | 1% |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (A) | 2,336 FT | $22.50 | $22.50 | 1% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 3,527 SY | $14.00 | $14.00 | 1% |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 3.64 MILE | $12,835 | $6,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 600 HOUR | $75.00 | $100 | 1% |
| 858E10000 THIN POLYMER EPOXY OVERLAY | 609 SY | $73.50 | $73.50 | 1% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 2,852 SY | $13.50 | $13.50 | 1% |
| 621E00100 RPM | 1,162 EACH | $32.50 | $32.50 | 1% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 2,609 SY | $14.00 | $14.00 | 1% |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 2,393 SY | $14.00 | $14.00 | 1% |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC |
|---|---|---|---|
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 18 EACH | $1,025 | $1,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 4 EACH | $2,150 | $2,800 |
| 408E10001 PRIME COAT, AS PER PLAN | 3,262 GAL | $5.00 | $4.75 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 17.19 MILE | $1,200 | $980 |
| 690E98400 SPECIAL - PAVER MOUNTED THERMAL PROFILING (PMTP) | 1 LS | $12,500 | $20,000 |
| 621E00300 RPM REFLECTOR | 130 EACH | $14.50 | $14.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,162 EACH |
| $7.25 |
| $1.00 |
| 644E00204 LANE LINE, 6" | 9.72 MILE | $2,164 | $2,164 |
| 644E00404 CHANNELIZING LINE, 12" | 14,853 FT | $1.90 | $1.90 |
| 644E00500 STOP LINE | 230 FT | $10.65 | $10.65 |
| 644E00620 CROSSWALK LINE, 12" | 1,378 FT | $4.60 | $4.60 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 191 FT | $10.80 | $10.80 |
| 644E01300 LANE ARROW, 96" | 12 EACH | $160 | $160 |
| 644E01360 WRONG WAY ARROW | 15 EACH | $195 | $195 |
| 644E01410 WORD ON PAVEMENT, 96" | 2 EACH | $160 | $160 |
| 644E01510 DOTTED LINE, 6" | 10,381 FT | $0.90 | $0.90 |
| 646E10010 EDGE LINE, 6" | 2.73 MILE | $10,825 | $10,825 |
| 646E10110 LANE LINE, 6" | 1.38 MILE | $6,950 | $6,950 |
| 646E10200 CENTER LINE | 0.08 MILE | $40,000 | $40,000 |
| 646E10300 CHANNELIZING LINE, 8" | 1,645 FT | $3.50 | $3.50 |
| 646E10310 CHANNELIZING LINE, 12" | 619 FT | $3.50 | $3.50 |
| 646E10400 STOP LINE | 144 FT | $15.25 | $15.25 |
| 646E10510 CROSSWALK LINE, 12" | 863 FT | $6.50 | $6.50 |
| 646E20300 LANE ARROW, 72" | 24 EACH | $195 | $195 |
| 646E20400 WORD ON PAVEMENT, 72" | 14 EACH | $255 | $255 |
| 646E20504 DOTTED LINE, 6" | 1,786 FT | $2.15 | $2.15 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 940 FT | $2.55 | $4.50 |
| 614E12600 REPLACEMENT DRUM | 25 EACH | $55.00 | $60.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 36 SNMT | $900 | $850 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 11.06 MILE | $550 | $550 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 22.12 MILE | $650 | $700 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.08 MILE | $2,500 | $2,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.08 MILE | $2,500 | $3,500 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 24.64 MILE | $600 | $600 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 24.64 MILE | $675 | $780 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 16,200 FT | $0.80 | $0.80 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 16,200 FT | $1.00 | $1.10 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 2,924 FT | $0.80 | $0.80 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 2,924 FT | $1.00 | $1.10 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 230 FT | $3.15 | $3.15 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 230 FT | $3.50 | $3.50 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 30 SNMT | $650 | $750 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,402 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 74 FT | $25.50 | $25.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (C) | 4 FT | $85.00 | $85.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,577 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 156 FT | $23.50 | $23.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,300 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 72 FT | $25.00 | $25.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 165 SY | $18.00 | $18.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,533 SY | $14.00 | $14.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 2,155 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 202 FT | $23.50 | $23.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (C) | 49 FT | $25.00 | $25.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 160 FT | $23.50 | $23.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 5 SY | $1,800 | $1,800 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,628 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 148 FT | $23.50 | $23.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 10 SY | $1,550 | $1,550 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 2,376 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 148 FT | $23.50 | $23.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 5 SY | $1,700 | $1,700 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,493 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 148 FT | $23.00 | $23.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 5 SY | $1,262 | $1,262 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 177 FT | $23.50 | $23.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 148 FT | $23.50 | $23.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,588 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 161 FT | $23.50 | $23.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 5 SY | $1,700 | $1,700 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,493 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 148 FT | $23.50 | $23.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,221 SY | $14.50 | $14.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 229 FT | $23.50 | $23.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (C) | 52 FT | $25.00 | $25.00 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 25 SY | $725 | $725 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,100 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 107 FT | $25.00 | $25.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (C) | 5 FT | $30.00 | $30.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 100 FT | $85.50 | $85.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (C) | 4 FT | $30.00 | $30.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 100 FT | $85.50 | $85.50 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 25 SY | $725 | $725 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 772 SY | $14.00 | $14.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (B) | 74 FT | $25.00 | $25.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 100 FT | $85.50 | $85.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $30,000 |
| 619E16020 FIELD OFFICE, TYPE C | 16 MNTH | $2,000 | $2,700 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 13,022 CY | $237.7 | $3.10M | 48% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 267,722 SY | $3.15 | $843k | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $325,000 | $325k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 3% |
| 253E02000 PAVEMENT REPAIR | 300 CY | $520 | $156k | 2% |
| 858E10000 THIN POLYMER EPOXY OVERLAY | 1,361 SY | $73.5 | $100k | 2% |
| 644E00104 EDGE LINE, 6" | 21.91 MILE | $3,935 | $86k | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,263 CY | $9 | $83k | 1% |
| 858E10000 THIN POLYMER EPOXY OVERLAY | 1,094 SY | $73.5 | $80k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 21,427 GAL | $3.7 | $79k | 1% |