FAY-/MAD-SR 41-24.45/00.00
FAY County · est $2.6M
Bid dateThursday, October 26—
FAY County · est $2.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 4,109 CY | $198 | $215 | $214 | 36% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3190 CY | $204 | $205 | $224 | 28% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 6,000 SY | $35.00 | $36.00 | $60.01 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 114,839 SY | $1.80 | $1.80 | $2.11 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $95,000 | $86,578 | $109,349 | 4% |
| 617E10100 COMPACTED AGGREGATE | 554 CY | $88.00 | $70.00 | $157 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 16,147 GAL |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 750 FT | $2.00 | $2.00 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 8 EACH | $295 | $295 | $295 |
| 209E60200 LINEAR GRADING | 17.75 STA | $40.00 | $40.00 | $40.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 325 FT | $20.40 | $20.40 | $20.40 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 87.5 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.00 |
| $2.75 |
| $5.26 |
| 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $100,000 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 11 EACH | $2,485 | $2,485 | $2,485 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.73 MILE | $3,000 | $4,500 | $8,188 | 1% |
| 621E00100 RPM | 570 EACH | $32.85 | $34.00 | $34.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 900 FT | $18.80 | $18.80 | $18.80 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 15.96 MILE | $875 | $750 | $875 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 15.46 MILE | $875 | $1,240 | $875 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 15.46 MILE | $850 | $900 | $1,369 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 15.46 MILE | $830 | $1,216 | $830 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,000 | $8,410 | 0% |
| 203E20001 EMBANKMENT, AS PER PLAN | 158 CY | $62.00 | $62.00 | $62.00 | 0% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,500 | $3,000 | $7,740 | 0% |
| 642E00300 CENTER LINE, TYPE 1 | 7.73 MILE | $870 | $1,860 | $870 | 0% |
| $22.00 |
| $22.00 |
| $22.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,380 | $1,380 | $1,380 |
| 606E98000 GUARDRAIL, MISC.: ALTERNATIVE GUARDRAIL PLACEMENT | 25 FT | $11.00 | $11.00 | $11.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 3 EACH | $450 | $850 | $906 |
| 659E00300 TOPSOIL | 100 CY | $39.00 | $80.00 | $128 |
| 659E10000 SEEDING AND MULCHING | 861 SY | $3.95 | $3.95 | $3.95 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $300 | $300 | $300 |
| 659E31000 LIME | 0.18 ACRE | $10.00 | $10.00 | $10.00 |
| 659E35000 WATER | 5 MGAL | $0.25 | $0.25 | $0.25 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 817 SY | $3.50 | $1.80 | $17.99 |
| 617E25000 WATER | 4 MGAL | $535 | $7.17 | $382 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 570 EACH | $4.50 | $2.00 | $16.56 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIRECTIONAL | 37 EACH | $12.00 | $12.00 | $12.00 |
| 644E00500 STOP LINE | 24 FT | $27.80 | $50.00 | $27.80 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $1,200 | $1,600 | $1,200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $70.00 | $85.00 | $91.93 |
| 614E12460 WORK ZONE MARKING SIGN | 62 EACH | $105 | $95.00 | $95.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 48 FT | $6.50 | $10.00 | $6.50 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $3,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 4,109 CY | $198 | $814k | 35% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3190 CY | $204 | $651k | 28% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 6,000 SY | $35 | $210k | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 114,839 SY | $1.8 | $207k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $95,000 | $95k | 4% |
| 617E10100 COMPACTED AGGREGATE | 554 CY | $88 | $49k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 16,147 GAL | $3 | $48k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 11 EACH | $2,485 | $27k | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.73 MILE | $3,000 | $23k | 1% |