| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC | % of bid |
|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,307 CY | $195 | $180 | 33% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,650 CY | $220 | $208 | 26% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,300 | $110,555 | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 503 CY | $230 | $250 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,156.25 FT | $18.40 | $19.25 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 45,399 SY | $0.70 | $1.60 | 2% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 89 CY | $255 | $500 | 2% |
| 617E10100 COMPACTED AGGREGATE | 740 CY | $30.00 | $50.00 | 2% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 187.5 FT | $112 | $119 | 2% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 93 CY | $220 | $208 | 1% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 8 EACH | $2,460 | $2,400 | 1% |
| 203E20001 EMBANKMENT, AS PER PLAN | 294 CY | $63.00 | $60.00 | 1% |
| 407E10000 TACK COAT | 6,204 GAL | $2.75 | $2.20 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 3,058 GAL | $4.75 | $4.50 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.14 MILE | $1,200 | $900 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 6.54 MILE | $1,800 | $3,523 | 1% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 50 CY | $235 | $500 | 1% |
| 621E00100 RPM | 241 EACH | $44.50 | $44.50 | 1% |
| 606E13000 GUARDRAIL, TYPE 5 | 581.25 FT | $17.60 | $19.25 | 1% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC |
|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 2,737.5 FT | $1.60 | $3.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 11 EACH | $145 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $95.00 | $150 |
| 202E42810 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE E | 4 EACH | $165 | $250 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 8 EACH | $50.00 | $175 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 48.5 STA | $42.00 | $45.00 |
| 209E80000 GRADING MAILBOX APPROACHES |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 30 EACH |
| $20.00 |
| $295 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 1,337.5 FT | $4.80 | $6.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,520 | $2,400 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $985 | $1,300 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,340 | $1,300 |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 4 EACH | $1,260 | $750 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,170 | $2,350 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 3 EACH | $1,025 | $1,200 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 1 EACH | $1,370 | $1,200 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $850 | $1,800 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $1,000 | $3,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,100 | $4,500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $215 | $250 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,100 | $1,800 |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 9 CY | $260 | $1,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (TAPER 1.5" TO | 1,799 SY | $0.70 | $3.00 |
| 254E01600 PATCHING PLANED SURFACE | 240 SY | $1.25 | $5.00 |
| 407E13900 TACK COAT, 702.13 | 30 GAL | $20.00 | $5.00 |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 36 CY | $220 | $208 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 241 EACH | $3.00 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 66 EACH | $11.00 | $11.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 6.6 MILE | $875 | $800 |
| 642E00300 CENTER LINE, TYPE 1 | 3.3 MILE | $1,075 | $900 |
| 644E00500 STOP LINE | 174 FT | $12.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $10,000 | $17,250 |
| 646E10200 CENTER LINE | 0.08 MILE | $20,000 | $17,250 |
| 614E12460 WORK ZONE MARKING SIGN | 41 EACH | $55.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $100 | $300 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 522 FT | $2.00 | $5.00 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 187.5 FT | $20.40 | $32.50 |
| 409E30001 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 56 FT | $24.71 | $25.95 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 70 FT | $24.71 | $25.95 |
| 202E98200 REMOVAL MISC.: JOINT SEAL | 93 FT | $9.24 | $9.70 |
| 409E30001 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 93 FT | $29.33 | $30.80 |
| 511E60000 SPECIAL - BRIDGE DECK GROOVING | 811 SY | $5.57 | $5.85 |
| 516E31000 JOINT SEALER | 93 FT | $29.33 | $30.80 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $7,000 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,000 | $4,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,307 CY | $195 | $450k | 30% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,650 CY | $220 | $363k | 24% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,300 | $120k | 8% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 503 CY | $230 | $116k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,156.25 FT | $18.4 | $40k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 45,399 SY | $0.7 | $32k | 2% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 89 CY | $255 | $23k | 2% |
| 617E10100 COMPACTED AGGREGATE | 740 CY | $30 | $22k | 1% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 187.5 FT | $112 | $21k | 1% |