COS-SR 60-01.34
COS County · est $0.2M
Bid dateThursday, December 14—
COS County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3J & J Bridge Company INC | % of bid |
|---|---|---|---|---|---|
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 9 CY | $3,809 | $3,500 | $3,500 | 17% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUPERS | 9 CY | $2,674 | $3,000 | $3,000 | 12% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 768 FT | $26.46 | $30.00 | $55.00 | 10% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 1,879 LB | $7.38 | $5.00 | $5.00 | 7% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | 6% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 60 FT | $196 | $200 | $165 | 6% |
| 632E90400 |
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3J & J Bridge Company INC |
|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 193 FT | $8.40 | $2.00 | $2.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 10 CY | $106 | $150 | $150 |
| 606E13000 GUARDRAIL, TYPE 5 | 95 FT | $20.48 | $28.00 | $18.00 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $1,365 | $1,120 | $1,200 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $2,217 | $560 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2 EACH |
| $5,324 |
| $6,000 |
| $750 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $9,237 | $10,000 | $23,500 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,147 | $32,000 | $20,000 | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $831 | $325 | $300 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,062 | $1,500 | $1,600 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $2,104 | $3,000 | $1,000 | 3% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 1 CY | $5,964 | $8,000 | $10,000 | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1 CY | $5,820 | $5,800 | $6,500 | 3% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 0.44 MILE | $11,524 | $5,000 | $5,000 | 2% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,520 | $2,785 | $2,300 | 2% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 96 FT | $48.87 | $42.00 | $85.00 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,330 | $2,840 | $2,500 | 2% |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 660 SY | $6.17 | $4.25 | $2.00 | 2% |
| 646E10200 CENTER LINE | 0.21 MILE | $17,850 | $15,000 | $17,000 | 2% |
| 0.14 ACRE |
| $900 |
| $20.00 |
| $2,500 |
| 659E35000 WATER | 1.8 MGAL | $10.50 | $1.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 5 EACH | $151 | $11.80 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $162 | $195 | $100 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $17,850 | $35,000 | $17,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 19 EACH | $29.08 | $25.00 | $36.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 19 EACH | $29.08 | $13.95 | $46.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.19 MILE | $11,119 | $17,000 | $14,050 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.21 MILE | $5,560 | $18,000 | $7,005 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 22 FT | $3.15 | $23.00 | $14.00 |
| 202E38500 BRIDGE RAILING REMOVED | 60 FT | $46.20 | $15.00 | $25.00 |
| 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN | 4 SF | $51.38 | $40.00 | $400 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 65 FT | $24.62 | $25.00 | $25.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 75 FT | $29.12 | $40.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,864 | $4,000 | $25,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,045 | $7,000 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 9 CY | $3,809 | $34k | 15% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUPERS | 9 CY | $2,674 | $24k | 10% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 768 FT | $26.46 | $20k | 9% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 1,879 LB | $7.38 | $14k | 6% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1 | $12k | 5% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 60 FT | $196.35 | $12k | 5% |
| 632E90400 SIGNALIZATION, MISC.: MICROWAVE DETECTOR | 2 EACH | $5,324 | $11k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $9,237 | $9k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,147 | $9k | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $831 | $8k | 4% |