CUY-SRTS FY2022 Maple Hts
CUY County · est $0.2M
Bid dateThursday, February 9—
CUY County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Barbicas Construction Company INC | % of bid |
|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 4,037 SF | $30.00 | 52% |
| 202E30001 WALK REMOVED, AS PER PLAN | 4,306 SF | $5.00 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | 9% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | 6% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 415 SF | $20.00 | 4% |
| 609E26000 CURB, TYPE 6 | 74 FT | $100 | 3% |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,192 FT | $5.00 | 3% |
| 642E00630 CROSSWALK LINE, 24", TYPE 1 | 880 FT | $5.00 | 2% |
| 203E10000 EXCAVATION | 32 CY | $125 | 2% |
| 202E32001 CURB REMOVED, AS PER PLAN | 305 FT | $12.00 | 2% |
| 659E00300 TOPSOIL | 21 CY | $150 | 1% |
| 203E10001 EXCAVATION, AS PER PLAN | 20 CY | $150 | 1% |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 1,171 FT | $2.50 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $80.00 | 1% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 2,000 EACH | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | 1% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 141 FT | $14.00 | 1% |
| 630E80100 SIGN, FLAT SHEET | 100 SF | $18.00 | 1% |
| 642E00500 STOP LINE, TYPE 1 | 204 FT | $6.00 | 1% |
| 203E20000 EMBANKMENT | 11 CY | $100 | 0% |
| Item | Quantity | R1Barbicas Construction Company INC |
|---|---|---|
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 194 SY | $5.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $30.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $20,000 |
| 642E01100 SCHOOL SYMBOL MARKING, 72", TYPE 1 | 2 EACH | $385 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E52001 CURB RAMP, AS PER PLAN | 4,037 SF | $30 | $121k | 51% |
| 202E30001 WALK REMOVED, AS PER PLAN | 4,306 SF | $5 | $22k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $15,000 | $15k | 6% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 415 SF | $20 | $8k | 4% |
| 609E26000 CURB, TYPE 6 | 74 FT | $100 | $7k | 3% |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,192 FT | $5 | $6k | 3% |
| 642E00630 CROSSWALK LINE, 24", TYPE 1 | 880 FT | $5 | $4k | 2% |
| 203E10000 EXCAVATION | 32 CY | $125 | $4k | 2% |
| 202E32001 CURB REMOVED, AS PER PLAN | 305 FT | $12 | $4k | 2% |