ATB-SR 531-13.50/15.85
ATB County · est $6.1M
Bid dateThursday, May 11—
ATB County · est $6.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Great Lakes Construction CO | R3Rudzik Excavating INC | R4Beaver Excavating Company | R5Independence Excavating INC | R6S E T INC | R7Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, FUR | 102,744 SF | $27.35 | $33.10 | $32.00 | $34.00 | $35.15 | $34.00 | $36.50 | 59% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, DRI | 98,184 SF | $9.22 | $5.00 | $7.20 | $5.20 | $6.00 | $8.00 | $8.05 | 19% |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Great Lakes Construction CO | R3Rudzik Excavating INC | R4Beaver Excavating Company | R5Independence Excavating INC | R6S E T INC | R7Ruhlin Company |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 87 SY | $10.00 | $23.00 | $9.00 | $30.00 | $50.00 | $56.00 | $37.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 195 FT | $5.00 | $30.00 | $10.00 | $30.00 | $12.00 | $10.00 | $10.91 |
| 202E35700 ASBESTOS PIPE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $200,000 |
| $200,000 |
| $220,000 |
| $200,000 |
| $200,000 |
| $200,000 |
| $200,000 |
| 4% |
| 203E10000 EXCAVATION | 5,983 CY | $15.82 | $15.00 | $20.00 | $12.00 | $23.00 | $26.00 | $40.00 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 743 CY | $122 | $115 | $80.00 | $115 | $88.00 | $115 | $136 | 2% |
| 611E04600 12" CONDUIT, TYPE C | 1,192 FT | $71.00 | $86.00 | $70.00 | $87.00 | $82.00 | $68.00 | $82.93 | 2% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (243 CY | $315 | $315 | $355 | $590 | $460 | $290 | $560 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,550 FT | $23.75 | $19.50 | $26.15 | $23.75 | $20.00 | $20.00 | $23.75 | 1% |
| 611E04400 12" CONDUIT, TYPE B | 571 FT | $91.00 | $110 | $100 | $90.00 | $133 | $112 | $137 | 1% |
| 611E04400 12" CONDUIT, TYPE B, 707.42 | 565 FT | $91.00 | $100 | $100 | $85.00 | $139 | $114 | $137 | 1% |
| 609E26000 CURB, TYPE 6 | 2,188 FT | $21.00 | $29.00 | $30.00 | $25.00 | $24.00 | $26.00 | $20.75 | 1% |
| 832E30000 EROSION CONTROL | 38,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 611E06100 15" CONDUIT, TYPE C | 519 FT | $73.00 | $93.00 | $75.00 | $65.00 | $88.00 | $72.00 | $100 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $37,000 | $10,000 | $66,000 | $80,000 | $25,000 | $30,000 | $25,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $37,000 | $44,200 | $45,815 | $30,000 | $75,000 | $40,000 | $15,000 | 1% |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 1,985 FT | $18.00 | $5.75 | $30.00 | $15.00 | $12.00 | $30.00 | $12.92 | 1% |
| 611E98180 CATCH BASIN, NO. 3A | 9 EACH | $3,550 | $4,000 | $4,000 | $3,400 | $4,400 | $3,200 | $4,398 | 1% |
| 659E00300 TOPSOIL | 836 CY | $30.00 | $39.00 | $24.80 | $40.00 | $40.00 | $50.00 | $39.00 | 1% |
| 611E98450 CATCH BASIN, NO. 2-2A | 9 EACH | $2,700 | $2,200 | $2,200 | $2,100 | $3,900 | $2,000 | $3,271 | 1% |
| 671E15040 EROSION CONTROL MAT, TYPE E | 6,617 SY | $3.00 | $4.00 | $5.00 | $3.20 | $4.00 | $3.00 | $4.00 | 0% |
| 50 FT |
| $78.00 |
| $75.00 |
| $50.00 |
| $60.00 |
| $122 |
| $25.00 |
| $50.00 |
| 202E38000 GUARDRAIL REMOVED | 1,570 FT | $4.00 | $4.00 | $2.00 | $2.00 | $4.00 | $2.00 | $4.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 5 EACH | $250 | $250 | $400 | $250 | $250 | $135 | $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 3 EACH | $250 | $250 | $400 | $250 | $250 | $85.00 | $250 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $200 | $650 | $400 | $600 | $210 | $275 | $681 |
| 202E98100 REMOVAL MISC.:INSPECTION WELL | 1 EACH | $50.00 | $125 | $250 | $300 | $350 | $405 | $675 |
| 202E98200 REMOVAL MISC.:CONDUIT | 10 FT | $5.00 | $50.00 | $5.00 | $30.00 | $30.00 | $40.00 | $33.76 |
| 203E20000 EMBANKMENT | 531 CY | $30.00 | $30.00 | $30.00 | $12.00 | $16.00 | $67.00 | $55.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $30.00 | $50.00 | $60.00 | $35.00 | $17.00 | $26.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 55 SY | $5.00 | $10.00 | $5.00 | $15.00 | $12.00 | $33.00 | $5.75 |
| 606E16000 GUARDRAIL REBUILT | 68.75 FT | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $16.00 | $10.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 4 EACH | $2,100 | $2,100 | $2,310 | $2,100 | $2,150 | $2,400 | $2,100 |
| 690E98400 SPECIAL - AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $5,000 | $800 | $1,200 | $10,000 | $2,000 | $4,900 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $5,000 | $3,000 | $1,000 | $10,000 | $1,500 | $2,000 | $1,000 |
| 690E98400 SPECIAL - WATER LINE, PROTECT IN PLACE | 1 LS | $100 | $300 | $500 | $5,500 | $1.00 | $2,000 | $1,000 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 107 SY | $93.15 | $105 | $250 | $110 | $75.00 | $80.00 | $142 |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 14 CY | $200 | $285 | $191 | $155 | $88.00 | $240 | $278 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 906 SY | $5.00 | $0.85 | $2.65 | $2.10 | $3.00 | $2.00 | $0.85 |
| 659E20000 COMMERCIAL FERTILIZER | 1.05 TON | $400 | $1,200 | $565 | $540 | $300 | $550 | $1,200 |
| 659E31000 LIME | 1.56 ACRE | $20.00 | $1.00 | $100 | $25.00 | $25.00 | $25.00 | $0.01 |
| 659E35000 WATER | 42 MGAL | $0.10 | $30.00 | $5.00 | $1.00 | $1.00 | $1.00 | $0.01 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,800 | $1,600 | $1,735 | $5,000 | $2,000 | $2,000 | $1,575 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,600 | $1,400 | $4,400 | $5,000 | $8,000 | $11,000 | $8,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $9,500 | $11,550 | $15,000 | $12,000 | $15,000 | $11,000 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $4,750 | $4,000 | $7,650 | $10,000 | $2,500 | $3,000 | $7,254 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 215 FT | $20.00 | $35.00 | $42.00 | $65.00 | $54.00 | $27.00 | $34.29 |
| 611E02600 8" CONDUIT, TYPE F | 18 FT | $25.00 | $50.00 | $50.00 | $100 | $71.00 | $31.00 | $76.31 |
| 611E05900 15" CONDUIT, TYPE B | 58 FT | $108 | $99.00 | $140 | $295 | $185 | $130 | $170 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 10 FT | $5.00 | $190 | $35.00 | $100 | $115 | $50.00 | $80.53 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 10 FT | $5.00 | $190 | $35.00 | $40.00 | $115 | $50.00 | $80.53 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 10 FT | $5.00 | $190 | $35.00 | $40.00 | $115 | $50.00 | $80.53 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,500 | $4,500 | $4,500 | $3,700 | $4,740 | $3,600 | $4,652 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $2,500 | $2,200 | $1,800 | $1,500 | $3,600 | $1,800 | $3,222 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $500 | $375 | $350 | $450 | $925 | $500 | $532 |
| 611E99720 INSPECTION WELL | 3 EACH | $50.00 | $1,000 | $535 | $450 | $1,725 | $1,500 | $450 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 172 FT | $5.00 | $2.00 | $5.00 | $3.00 | $5.00 | $10.00 | $3.00 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 12 CY | $500 | $500 | $550 | $322 | $717 | $620 | $670 |
| 304E20000 AGGREGATE BASE | 10 CY | $100 | $200 | $110 | $250 | $100 | $620 | $220 |
| 407E20000 NON-TRACKING TACK COAT | 3 GAL | $25.00 | $25.00 | $27.50 | $3.50 | $5.35 | $410 | $5.00 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 6 CY | $500 | $500 | $550 | $1,577 | $770 | $680 | $720 |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $500 | $500 | $550 | $1,577 | $1,247 | $1,150 | $1,165 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1 WAY) | 28 EACH | $10.00 | $10.00 | $11.00 | $13.00 | $10.00 | $15.00 | $10.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $50.00 | $19.00 | $60.00 | $40.00 | $53.50 | $260 | $40.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $50.00 | $23.00 | $60.00 | $60.00 | $53.50 | $260 | $60.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 25 CY | $35.00 | $125 | $110 | $90.00 | $90.00 | $150 | $50.00 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $4,545 | $4,545 | $5,000 | $10,000 | $5,000 | $5,000 | $4,500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $950 | $1,250 | $1,000 | $950 | $950 | $950 |
| 616E10000 WATER | 37 MGAL | $0.10 | $50.00 | $0.10 | $40.00 | $25.00 | $100 | $135 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, 707.33 | 70 FT | $10.00 | $32.00 | $50.00 | $15.00 | $22.00 | $60.00 | $21.45 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15,000 | $40,000 | $105,000 | $23,000 | $98,237 | $210,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,500 | $2,500 | $1,600 | $2,500 | $1,500 | $2,200 | $3,435 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,120 | $10,000 | $25,000 | $30,000 | $67,000 | $15,000 | $87,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, FUR | 102,744 SF | $27.35 | $2.81M | 57% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, DRI | 98,184 SF | $9.22 | $905k | 18% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 4% |
| 203E10000 EXCAVATION | 5,983 CY | $15.82 | $95k | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 743 CY | $122 | $91k | 2% |
| 611E04600 12" CONDUIT, TYPE C | 1,192 FT | $71 | $85k | 2% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (243 CY | $315 | $77k | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 2,550 FT | $23.75 | $61k | 1% |
| 611E04400 12" CONDUIT, TYPE B | 571 FT | $91 | $52k | 1% |
| 611E04400 12" CONDUIT, TYPE B, 707.42 | 565 FT | $91 | $51k | 1% |