LOR-SR 2-06.49
LOR County · est $0.2M
Bid dateThursday, August 10—
LOR County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 17items by winning bid’s extended amount.
| Item | Quantity | R1Ruhlin Company | R2Evers Steel Construction LLC | R3Armstrong Steel Erectors INC | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,000 | $56,000 | $17,356 | 24% |
| 849E10700 STRAIGHTENING DAMAGED MEMBERS | 1 LS | $35,500 | $55,000 | $53,000 | 18% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 283 LB | $71.00 | $12.00 | $38.00 | 10% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 4 SNMT | $4,525 | $640 | $1,315 | 9% |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 78 FT | $215 | $195 | $224 | 9% |
| 514E20001 FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER | 211 SF | $65.00 | $120 | $152 | 7% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100 |
| $30.00 |
| $145 |
| 6% |
| 202E98200 REMOVAL MISC.: SOUNDING AND REMOVAL OF DELAMINATED | 78 FT | $125 | $36.00 | $131 | 5% |
| 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 237 LB | $20.00 | $10.00 | $85.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $38,000 | $28,000 | 2% |
| 849E10000 DAMAGE ASSESSMENT | 1 LS | $3,650 | $1,800 | $5,800 | 2% |
| 849E10500 SURFACE PREPARATION | 1 LS | $3,650 | $1,650 | $27,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,590 | $100 | $6,500 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $863 | $1,300 | $2,556 | 1% |
| 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING | 3 HOUR | $490 | $85.00 | $1,200 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,425 | $6,000 | $26,057 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $47,000 | $47k | 24% |
| 849E10700 STRAIGHTENING DAMAGED MEMBERS | 1 LS | $35,500 | $36k | 18% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 283 LB | $71 | $20k | 10% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 4 SNMT | $4,525 | $18k | 9% |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 78 FT | $215 | $17k | 9% |
| 514E20001 FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER | 211 SF | $65 | $14k | 7% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $100 | $12k | 6% |
| 202E98200 REMOVAL MISC.: SOUNDING AND REMOVAL OF DELAMINATED | 78 FT | $125 | $10k | 5% |
| 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 237 LB | $20 | $5k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 2% |