PER-CR 99-00.00 SRTS
PER County · est $0.3M
Bid dateThursday, January 11—
PER County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Brennstuhl Construction INC | R2Axis Civil Construction LLC | R3Alan Stone CO INC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 204E30020 GRANULAR MATERIAL, TYPE C | 641 CY | $55.76 | $85.00 | $80.00 | $63.25 | 13% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (80 CY | $396 | $350 | $350 | $285 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $26,709 | $20,000 | $17,000 | $16,500 | 9% |
| 659E00300 TOPSOIL(4") | 292 CY | $90.58 | $45.00 | $40.00 | $85.00 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 57 CY | $389 | $395 | $480 | $355 | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,740 | $22,500 | $12,000 | $12,500 | 7% |
| Item | Quantity | R1Brennstuhl Construction INC | R2Axis Civil Construction LLC | R3Alan Stone CO INC | R4Shelly Company |
|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 313 FT | $0.88 | $5.00 | $6.00 | $2.50 |
| 202E75250 GATE REMOVED | 1 EACH | $274 | $350 | $460 | $195 |
| 204E10000 SUBGRADE COMPACTION | 1,922 SY | $0.71 | $3.00 | $3.00 | $2.15 |
| 204E45000 PROOF ROLLING | 4 HOUR | $137 | $250 | $620 | $245 |
| 204E51000 GEOGRID | 1,922 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 304E20000 AGGREGATE BASE | 321 CY | $53.18 | $98.00 | $100 | $75.50 | 6% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,700 | $15,000 | $13,000 | $45,000 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 555 CY | $23.93 | $23.00 | $35.00 | $49.00 | 5% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,630 SY | $3.84 | $1.30 | $1.50 | $2.05 | 4% |
| 203E10000 EXCAVATION | 361 CY | $26.37 | $23.00 | $25.00 | $49.00 | 3% |
| 611E04400 12" CONDUIT, TYPE B | 117 FT | $68.87 | $70.00 | $95.00 | $83.00 | 3% |
| 602E20000 CONCRETE MASONRY | 1.11 CY | $5,381 | $3,500 | $1,900 | $3,100 | 2% |
| 203E20000 EMBANKMENT | 256 CY | $21.41 | $23.00 | $25.00 | $34.50 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,328 | $3,500 | $7,000 | $4,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,540 | $6,500 | $16,000 | $7,000 | 2% |
| 608E52000 CURB RAMP | 213 SF | $19.91 | $38.00 | $25.00 | $42.25 | 2% |
| 607E98000 FENCE, MISC.:BIKEWAY RAILING (PER ODOT SCD RM-5.2) | 65 FT | $60.62 | $88.50 | $90.00 | $88.50 | 1% |
| 204E50000 GEOTEXTILE FABRIC | 1,922 SY | $1.96 | $1.65 | $1.50 | $0.95 | 1% |
| $1.96 |
| $3.30 |
| $2.50 |
| $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $600 | $100 | $120 | $125 |
| 659E14000 REPAIR SEEDING AND MULCHING | 132 SY | $2.80 | $1.30 | $2.50 | $0.79 |
| 659E15000 INTER-SEEDING | 132 SY | $2.80 | $1.30 | $0.80 | $0.79 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $1,200 | $1,400 | $810 | $956 |
| 659E31000 LIME | 0.54 ACRE | $1,778 | $100 | $970 | $159 |
| 659E35000 WATER | 14 MGAL | $12.00 | $1.00 | $1.00 | $1.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $397 | $200 | $670 | $555 |
| 611E16400 36" CONDUIT, TYPE B(CONCRETE) | 8 FT | $427 | $550 | $350 | $510 |
| 407E20000 NON-TRACKING TACK COAT | 198 GAL | $6.53 | $6.00 | $10.00 | $3.70 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $33.97 | $32.00 | $30.00 | $32.00 |
| 630E80100 SIGN, FLAT SHEET | 16.5 SF | $52.97 | $36.00 | $40.00 | $36.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $78.29 | $75.00 | $180 | $75.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 5 EACH | $274 | $135 | $360 | $135 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 (WHITE, 12") | 594 FT | $5.34 | $5.05 | $8.50 | $5.05 |
| 616E10000 WATER | 3 MGAL | $12.00 | $1.00 | $0.40 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 204E30020 GRANULAR MATERIAL, TYPE C | 641 CY | $55.76 | $36k | 12% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (80 CY | $396.49 | $32k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $26,709 | $27k | 9% |
| 659E00300 TOPSOIL(4") | 292 CY | $90.58 | $26k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 57 CY | $389.3 | $22k | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,740 | $19k | 6% |
| 304E20000 AGGREGATE BASE | 321 CY | $53.18 | $17k | 6% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1 | $15k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,700 | $14k | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 555 CY | $23.93 | $13k | 4% |