JAC-SR 139-03.17
JAC County · est $0.4M
Bid dateThursday, January 25—
JAC County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Skeens Excavating INC | R2R C Construction Company And Son INC | R3D G M INC | R4Alan Stone CO INC | R5Eclipse CO LLC | R6Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E94728 7' X 5' CONDUIT, TYPE A, 706.05 | 60 FT | $1,500 | $900 | $1,750 | $1,450 | $1,500 | $1,850 | 32% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 26 CY | $1,000 | $475 | $900 | $460 | $875 | $600 | 9% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 27 CY | $800 | $750 | $1,100 | $1,000 |
| Item | Quantity | R1Skeens Excavating INC | R2R C Construction Company And Son INC | R3D G M INC | R4Alan Stone CO INC | R5Eclipse CO LLC | R6Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $3,500 | $11,000 | $7,000 | $7,500 | $20,000 |
| 202E23000 PAVEMENT REMOVED | 184 SY | $10.00 | $5.00 | $12.00 | $10.00 | $10.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 538 FT | $5.00 | $5.00 | $1.00 | $4.50 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,200 |
| $620 |
| 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 32 CY | $550 | $385 | $490 | $390 | $475 | $400 | 6% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $15,000 | $12,500 | $15,000 | $15,000 | $12,000 | $20,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $15,000 | $9,000 | $21,000 | $20,079 | $20,000 | 5% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 86 CY | $120 | $75.00 | $80.00 | $130 | $67.00 | $120 | 4% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $10,000 | $6,500 | $2,000 | $13,000 | $6,000 | $15,000 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 387.5 FT | $25.00 | $25.00 | $24.00 | $25.00 | $23.00 | $24.00 | 3% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $90.00 | $25.00 | $305 | $420 | $355 | $200 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $8,000 | $12,500 | $500 | $1,500 | $18,000 | $15,000 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9 CY | $800 | $750 | $1,350 | $2,900 | $3,500 | $1,800 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,000 | $15,000 | $6,000 | $4,500 | $9,000 | $15,000 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,310 LB | $2.00 | $3.00 | $2.50 | $4.00 | $4.00 | $3.00 | 2% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 38 CY | $150 | $125 | $110 | $130 | $128 | $135 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 43 CY | $120 | $125 | $120 | $110 | $95.00 | $120 | 2% |
| 203E20000 EMBANKMENT | 339 CY | $15.00 | $35.00 | $20.00 | $15.00 | $28.00 | $35.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,500 | $2,500 | $2,350 | $3,000 | $2,300 | $2,500 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $16,000 | $10,000 | $5,500 | $11,000 | $4,500 | 2% |
| $4.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 3 EACH | $100 | $1,000 | $300 | $480 | $300 | $450 |
| 203E10000 EXCAVATION | 157 CY | $15.00 | $25.00 | $30.00 | $20.00 | $18.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 392 SY | $5.00 | $2.00 | $6.00 | $6.50 | $1.00 | $3.00 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 125 FT | $29.00 | $32.00 | $32.00 | $30.00 | $29.00 | $30.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,050 | $1,500 | $1,100 | $1,700 | $1,020 | $1,250 |
| 659E10000 SEEDING AND MULCHING | 1,893 SY | $0.60 | $5.00 | $2.25 | $2.00 | $1.80 | $1.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 95 SY | $1.00 | $0.10 | $0.05 | $5.50 | $1.80 | $1.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $400 | $1,200 | $1,500 | $660 | $1,400 | $1,400 |
| 659E31000 LIME | 0.39 ACRE | $400 | $800 | $300 | $950 | $150 | $150 |
| 659E35000 WATER | 10.2 MGAL | $0.05 | $1.00 | $1.00 | $120 | $1.00 | $1.00 |
| 202E23500 WEARING COURSE REMOVED | 36 SY | $50.00 | $35.00 | $12.00 | $15.00 | $53.00 | $35.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 86 CY | $20.00 | $25.00 | $30.00 | $45.00 | $40.00 | $35.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,000 | $750 | $1,500 | $3,000 | $6,500 | $2,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 44 SY | $50.00 | $50.00 | $35.00 | $40.00 | $30.00 | $65.00 |
| 512E33000 TYPE 2 WATERPROOFING | 88 SY | $40.00 | $40.00 | $20.00 | $45.00 | $27.00 | $23.00 |
| 512E33010 TYPE 3 WATERPROOFING | 69 SY | $45.00 | $50.00 | $35.00 | $55.00 | $54.00 | $60.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $10.00 | $40.00 | $15.00 | $1.50 | $11.00 | $6.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 16 CY | $120 | $95.00 | $120 | $170 | $144 | $250 |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 6 SY | $450 | $275 | $250 | $750 | $667 | $590 |
| 605E31100 AGGREGATE DRAINS | 25 FT | $25.00 | $40.00 | $30.00 | $50.00 | $28.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $5.00 | $10.00 | $8.00 | $10.00 | $41.00 | $20.00 |
| 611E07400 18" CONDUIT, TYPE B | 2 FT | $400 | $950 | $500 | $1,500 | $1,423 | $100 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 44 FT | $20.00 | $50.00 | $12.00 | $40.00 | $36.00 | $12.00 |
| 304E20000 AGGREGATE BASE | 34 CY | $120 | $125 | $90.00 | $130 | $90.00 | $160 |
| 407E10000 TACK COAT | 45 GAL | $5.00 | $20.00 | $3.50 | $35.00 | $3.50 | $6.00 |
| 621E00100 RPM | 6 EACH | $800 | $850 | $325 | $1,100 | $328 | $328 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $20.00 | $50.00 | $1.00 | $15.00 | $11.00 | $45.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 11 EACH | $20.00 | $25.00 | $12.00 | $20.00 | $11.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $15,000 | $12,000 | $21,000 | $27,000 | $19,385 | $19,385 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $15,000 | $25,000 | $31,000 | $56,000 | $29,078 | $29,078 |
| 407E10000 TACK COAT | 50 GAL | $5.00 | $1.00 | $3.50 | $20.00 | $3.50 | $6.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 50 CY | $80.00 | $25.00 | $325 | $350 | $375 | $140 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $60.00 | $25.00 | $50.00 | $90.00 | $68.00 | $75.00 |
| 616E10000 WATER | 1 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $188 | $1.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $25,000 | $12,000 | $16,000 | $12,000 | $32,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $10.00 | $100 | $800 | $250 | $685 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $15,000 | $4,000 | $11,500 | $10,500 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94728 7' X 5' CONDUIT, TYPE A, 706.05 | 60 FT | $1,500 | $90k | 26% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 26 CY | $1,000 | $26k | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 27 CY | $800 | $22k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 32 CY | $550 | $18k | 5% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $15,000 | $15k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $13k | 4% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 86 CY | $120 | $10k | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $10,000 | $10k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 387.5 FT | $25 | $10k | 3% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $90 | $9k | 3% |