POR-/TRU-SR 305/VAR-00.72/VAR
POR County · est $2.0M
Bid dateThursday, January 25—
POR County · est $2.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 132 more items below.
| Item | Quantity | R1Matt Winters Excavation LLC | R2Marucci & Gaffney Excavating CO | R3Eclipse CO LLC | R4Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|
| 611E96455 16' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN (I-S | 61 FT | $8,000 | $7,035 | $7,950 | $8,510 | 34% |
| 611E96451 16' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN, < 2 | 41 FT | $2,500 | $2,162 | $2,700 | $3,335 | 7% |
| 514E27700 FIELD PAINTING, MISC.: REPAIR PAINTING | 690 SF | $145 | $140 | $190 | $110 | 7% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 144 CY | $650 | $645 | $365 | $523 | 6% |
| 611E95201 10' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, < 2 | 57 FT | $1,600 | $1,050 | $1,850 | $1,800 | 6% |
| 514E00100 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1 LS | $75,000 | $45,000 |
| Item | Quantity | R1Matt Winters Excavation LLC | R2Marucci & Gaffney Excavating CO | R3Eclipse CO LLC | R4Rudzik Excavating INC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $1,500 | $1,200 | $2,350 | $15,000 |
| 202E34900 PIPE REMOVED | 137 FT | $20.00 | $14.00 | $19.00 | $5.00 |
| 202E38000 GUARDRAIL REMOVED | 1,319 FT | $4.00 | $1.80 | $1.80 | $3.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 200 FT | $5.00 | $2.80 | $2.80 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $80,000 |
| $154,000 |
| 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 268 CY | $200 | $193 | $300 | $440 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 126 CY | $400 | $559 | $650 | $900 | 3% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 10 FT | $5,000 | $6,444 | $5,000 | $9,935 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 96 CY | $450 | $485 | $725 | $700 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $43,000 | $23,400 | $26,000 | $30,500 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $68,215 | $100,000 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 43 CY | $800 | $987 | $1,460 | $1,520 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $31,000 | $29,000 | $45,000 | $21,500 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $30,000 | $37,000 | $23,000 | $26,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $29,250 | $35,000 | $28,000 | $32,442 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5") | 937 SY | $30.00 | $28.00 | $15.00 | $40.50 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $25,000 | $25,000 | $35,650 | $24,948 | 2% |
| 202E23000 PAVEMENT REMOVED | 971 SY | $25.00 | $10.00 | $18.00 | $12.00 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 30 SNMT | $750 | $750 | $725 | $938 | 2% |
| 5 EACH |
| $350 |
| $10.00 |
| $167 |
| $50.00 |
| 202E98200 REMOVAL MISC.: CONDUIT | 50 FT | $20.00 | $15.00 | $17.00 | $8.00 |
| 203E10000 EXCAVATION | 283 CY | $25.00 | $40.00 | $42.00 | $40.00 |
| 203E20000 EMBANKMENT | 147 CY | $50.00 | $40.00 | $36.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 836 SY | $9.00 | $10.00 | $1.00 | $4.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $610 | $50.00 | $910 | $200 |
| 606E15050 GUARDRAIL, TYPE MGS | 500 FT | $20.00 | $18.80 | $18.80 | $20.70 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 738 FT | $22.00 | $21.20 | $21.20 | $23.35 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 38 FT | $105 | $104 | $104 | $115 |
| 606E16000 GUARDRAIL REBUILT | 200 FT | $14.00 | $13.20 | $13.20 | $14.60 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 88 FT | $24.00 | $23.40 | $23.40 | $25.75 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 4 EACH | $2,400 | $2,375 | $2,375 | $2,615 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,600 | $2,580 | $2,580 | $2,840 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,350 | $1,330 | $1,330 | $1,465 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $5,500 | $7,500 | $15,250 | $14,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $1,400 | $7,500 | $15,250 | $14,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $375 | $250 | $354 | $300 |
| 659E00300 TOPSOIL | 110 CY | $60.00 | $50.00 | $80.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 994 SY | $6.00 | $5.00 | $5.95 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 50 SY | $3.00 | $0.27 | $2.75 | $9.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $950 | $500 | $935 | $400 |
| 659E31000 LIME | 0.2 ACRE | $55.00 | $10.00 | $50.00 | $50.00 |
| 659E35000 WATER | 6 MGAL | $1.00 | $0.01 | $1.00 | $0.01 |
| 832E30000 EROSION CONTROL | 13,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 28 FT | $45.00 | $50.00 | $30.00 | $75.00 |
| 611E00900 6" CONDUIT, TYPE B | 30 FT | $8.00 | $6.00 | $41.00 | $30.00 |
| 611E01400 6" CONDUIT, TYPE E | 30 FT | $8.00 | $6.00 | $30.00 | $30.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $8.00 | $6.00 | $30.00 | $30.00 |
| 611E04600 12" CONDUIT, TYPE C | 188 FT | $75.00 | $65.00 | $85.00 | $80.00 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 50 FT | $30.00 | $5.00 | $57.50 | $30.00 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 50 FT | $32.00 | $5.00 | $53.00 | $20.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 50 FT | $34.00 | $5.00 | $42.00 | $22.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 50 FT | $36.00 | $5.00 | $42.00 | $20.00 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $3,500 | $5,040 | $7,600 | $5,850 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $3,400 | $2,500 | $4,100 | $2,504 |
| 611E99720 INSPECTION WELL | 5 EACH | $900 | $500 | $812 | $250 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 234 FT | $12.00 | $5.00 | $4.00 | $9.00 |
| 304E20000 AGGREGATE BASE | 138 CY | $105 | $125 | $92.00 | $106 |
| 407E13900 TACK COAT, 702.13 | 34 GAL | $5.00 | $3.50 | $20.00 | $27.50 |
| 407E20000 NON-TRACKING TACK COAT | 367 GAL | $5.00 | $3.50 | $15.00 | $4.40 |
| 408E10001 PRIME COAT, AS PER PLAN | 79 GAL | $12.00 | $11.50 | $30.00 | $20.00 |
| 609E10000 ASPHALT CONCRETE CURB, TYPE 1 | 40 FT | $35.00 | $42.00 | $75.00 | $38.50 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 12 CY | $135 | $250 | $225 | $225 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.2 MILE | $23,000 | $20,000 | $21,000 | $30,000 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.1 MILE | $23,000 | $20,000 | $25,000 | $30,000 |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 502 FT | $25.00 | $20.00 | $6.00 | $6.60 |
| 621E00100 RPM | 13 EACH | $350 | $395 | $250 | $650 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 102 FT | $12.00 | $19.00 | $8.65 | $21.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 26 FT | $15.00 | $22.00 | $9.85 | $24.20 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $75.00 | $45.00 | $25.60 | $49.50 |
| 630E80100 SIGN, FLAT SHEET | 24 SF | $35.00 | $25.00 | $18.65 | $27.50 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 10 SF | $60.00 | $29.50 | $20.00 | $32.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $40.00 | $10.00 | $23.00 | $11.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $50.00 | $15.00 | $30.00 | $16.50 |
| 646E10010 EDGE LINE, 6" | 0.3 MILE | $24,000 | $25,000 | $39,000 | $25,856 |
| 646E10200 CENTER LINE | 0.15 MILE | $32,000 | $35,000 | $39,500 | $34,474 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $250 | $100 | $360 | $250 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 30 EACH | $15.00 | $12.00 | $12.00 | $13.20 |
| 616E10000 WATER | 4 MGAL | $10.00 | $0.01 | $45.00 | $0.25 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $2,500 | $500 | $2,000 | $9,500 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT | 1 LS | $10,000 | $5,500 | $85,000 | $9,375 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 12 FT | $1,200 | $1,325 | $2,275 | $3,210 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 130 SY | $60.00 | $55.00 | $23.00 | $55.00 |
| 514E00200 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $12,000 | $20,000 | $30,000 | $22,000 |
| 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $12,000 | $20,000 | $10,000 | $22,000 |
| 514E00400 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1 LS | $12,000 | $20,000 | $5,000 | $11,000 |
| 530E00500 SPECIAL - STRUCTURES MISC.: SALT REMEDIATION FOR S | 6 HOUR | $250 | $100 | $1,500 | $550 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGE/ | 1 LS | $5,000 | $500 | $2,000 | $5,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $8,500 | $15,000 | $24,000 | $29,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $14,620 | $20,000 | $18,000 | $6,500 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 250 LB | $2.50 | $10.00 | $28.00 | $13.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 40 EACH | $25.00 | $100 | $140 | $190 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 3 CY | $1,500 | $5,500 | $4,300 | $4,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 56 SY | $90.00 | $50.00 | $24.00 | $155 |
| 512E33000 TYPE 2 WATERPROOFING | 64 SY | $28.00 | $35.00 | $24.00 | $42.00 |
| 512E33010 TYPE 3 WATERPROOFING | 95 SY | $60.00 | $50.00 | $45.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 38 SF | $15.00 | $10.00 | $7.00 | $6.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 40 FT | $25.00 | $25.00 | $75.00 | $43.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $5,000 | $2,500 | $2,000 | $25,000 |
| 202E22900 APPROACH SLAB REMOVED | 149 SY | $45.00 | $10.00 | $32.00 | $30.00 |
| 203E10000 EXCAVATION | 50 CY | $42.00 | $35.00 | $49.00 | $50.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 50 CY | $100 | $90.00 | $65.00 | $72.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 100 SY | $6.25 | $5.00 | $1.00 | $10.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $18,000 | $48,905 | $23,000 | $13,500 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 5,107 LB | $2.25 | $2.25 | $6.00 | $1.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 121 SY | $90.00 | $35.00 | $23.00 | $70.00 |
| 512E33000 TYPE 2 WATERPROOFING | 92 SY | $35.00 | $35.00 | $25.00 | $40.00 |
| 512E33010 TYPE 3 WATERPROOFING | 128 SY | $55.00 | $47.00 | $45.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 68 SF | $15.00 | $10.00 | $7.00 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $8,500 | $6,000 | $2,225 | $4,750 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 94 FT | $25.00 | $20.00 | $80.00 | $43.00 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 15 CY | $225 | $150 | $120 | $155 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 40 CY | $125 | $150 | $124 | $135 |
| 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS | 88 FT | $190 | $188 | $188 | $207 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $5,000 | $500 | $2,000 | $5,000 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $20,590 | $15,500 | $13,500 |
| 203E10000 EXCAVATION | 50 CY | $42.00 | $35.00 | $48.00 | $50.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C (703.16) | 50 CY | $100 | $90.00 | $72.00 | $72.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 100 SY | $6.25 | $5.00 | $1.00 | $10.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $20,000 | $21,500 | $7,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,000 | $20,500 | $15,000 | $10,660 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,880 LB | $2.00 | $2.50 | $3.00 | $1.00 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 12 CY | $850 | $2,300 | $2,475 | $2,740 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 34 CY | $400 | $800 | $1,050 | $825 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,800 | $1,500 | $4,900 | $1,560 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 46 SY | $90.00 | $35.00 | $23.00 | $70.00 |
| 512E33000 TYPE 2 WATERPROOFING | 98 SY | $30.00 | $50.00 | $25.00 | $37.00 |
| 512E33010 TYPE 3 WATERPROOFING | 84 SY | $55.00 | $50.00 | $45.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $15.00 | $10.00 | $7.00 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $5,000 | $12,000 | $2,225 | $2,800 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 56 CY | $175 | $100 | $130 | $135 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $5,000 | $1,500 | $2,000 | $5,500 |
| 203E10000 EXCAVATION | 50 CY | $42.00 | $15.00 | $51.00 | $50.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C, (703.16) | 50 CY | $100 | $90.00 | $72.00 | $72.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 100 SY | $6.25 | $5.00 | $1.00 | $10.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $20,000 | $20,000 | $45,000 | $7,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,500 | $28,540 | $15,000 | $19,915 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 10,684 LB | $2.00 | $2.25 | $3.00 | $1.35 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $1,300 | $1,000 | $2,000 | $840 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 100 SY | $90.00 | $50.00 | $22.00 | $70.00 |
| 512E33000 TYPE 2 WATERPROOFING | 90 SY | $35.00 | $50.00 | $24.00 | $40.00 |
| 512E33010 TYPE 3 WATERPROOFING | 86 SY | $55.00 | $75.00 | $45.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 58 SF | $12.00 | $10.00 | $6.00 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $8,500 | $7,500 | $2,225 | $5,300 |
| 530E00200 SPECIAL - STRUCTURES, REMOVAL OF ASBESTOS CONTAINI | 1 LS | $8,000 | $5,000 | $7,800 | $4,000 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 70 CY | $175 | $120 | $130 | $165 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $700 | $500 | $685 | $1,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10,000 | $30,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96455 16' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN (I-S | 61 FT | $8,000 | $488k | 23% |
| 611E96451 16' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN, < 2 | 41 FT | $2,500 | $103k | 5% |
| 514E27700 FIELD PAINTING, MISC.: REPAIR PAINTING | 690 SF | $145 | $100k | 5% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 144 CY | $650 | $94k | 4% |
| 611E95201 10' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, < 2 | 57 FT | $1,600 | $91k | 4% |
| 514E00100 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1 LS | $75,000 | $75k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 268 CY | $200 | $54k | 2% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 126 CY | $400 | $50k | 2% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 10 FT | $5,000 | $50k | 2% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 96 CY | $450 | $43k | 2% |