ROS-SR 28/SR 207/SR 372/SR 772/SR 104-06.00/01.00
ROS County · est $4.3M
Bid dateThursday, January 25—
ROS County · est $4.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 13,154 CY | $197 | $210 | 54% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 305,474 SY | $2.35 | $1.80 | 15% |
| 254E01600 PATCHING PLANED SURFACE | 61,095 SY | $4.75 | $4.05 | 6% |
| 644E00104 EDGE LINE, 6" | 41.06 MILE | $4,375 | $4,095 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $366,000 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,800 SY | $49.00 | $55.00 | 3% |
| 644E00300 CENTER LINE | 21.18 MILE | $5,750 | $5,370 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 26,836 GAL | $3.25 | $3.70 | 2% |
| 621E00100 RPM | 1,943 EACH | $42.00 | $39.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 841 CY | $95.00 | $119 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $70,000 | $200,000 | 1% |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 6,640 SY | $9.00 | $8.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 83.56 MILE | $675 | $620 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 43.08 MILE | $1,000 | $925 | 1% |
| 620E70000 DELINEATOR, MISC.: PEXCO FG300 | 75 EACH | $450 | $472 | 1% |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 2,243 SY | $9.00 | $8.00 | 0% |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 2,076 SY | $9.00 | $8.00 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,943 EACH | $9.50 | $16.25 | 0% |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 3 EACH | $6,000 | $3,025 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $25,000 | 0% |
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company |
|---|---|---|---|
| 202E98400 REMOVAL MISC.: TRENCH DRAIN REMOVED | 21 SF | $200 | $155 |
| 209E60500 LINEAR GRADING | 4.37 MILE | $2,350 | $1,875 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 30 SY | $100 | $151 |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (50 CY | $225 | $227 |
| 602E20000 CONCRETE MASONRY | 0.75 CY | $215 | $5,175 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 3.2 MILE | $1,650 | $1,425 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 1.6 MILE | $1,650 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,425 |
| 620E31200 REMOVAL OF DELINEATOR | 75 EACH | $75.00 | $12.00 |
| 632E26500 DETECTOR LOOP | 1 EACH | $4,150 | $2,200 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 1.6 MILE | $10,000 | $6,500 |
| 644E00204 LANE LINE, 6" | 0.66 MILE | $2,600 | $2,396 |
| 644E00404 CHANNELIZING LINE, 12" | 4,270 FT | $2.75 | $2.30 |
| 644E00500 STOP LINE | 108 FT | $12.00 | $10.70 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 832 FT | $10.00 | $9.10 |
| 644E00900 ISLAND MARKING | 242 SF | $4.00 | $3.50 |
| 644E01200 PARKING LOT STALL MARKING | 1,261 FT | $3.00 | $2.60 |
| 644E01300 LANE ARROW | 40 EACH | $125 | $110 |
| 646E10010 EDGE LINE, 6" | 0.72 MILE | $11,250 | $9,965 |
| 646E10110 LANE LINE, 6" | 0.08 MILE | $7,500 | $5,680 |
| 646E10200 CENTER LINE | 0.36 MILE | $18,000 | $16,500 |
| 646E10310 CHANNELIZING LINE, 12" | 79 FT | $6.50 | $4.00 |
| 614E12460 WORK ZONE MARKING SIGN | 61 EACH | $95.00 | $90.00 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.48 MILE | $650 | $600 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 8,698 FT | $1.00 | $0.85 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 1,664 FT | $2.20 | $2.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 216 FT | $4.00 | $3.60 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 80 EACH | $65.00 | $55.00 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT | 484 SF | $2.75 | $2.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 210 SY | $22.50 | $18.20 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,200 SY | $9.00 | $8.50 |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, 1.5" | 134 SY | $9.00 | $8.50 |
| 407E10000 TACK COAT | 216 GAL | $3.25 | $3.70 |
| 407E13900 TACK COAT, 702.13 | 12 GAL | $3.25 | $5.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 56 CY | $275 | $210 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 56 CY | $275 | $275 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 665 SY | $22.50 | $18.20 |
| 516E31001 JOINT SEALER, AS PER PLAN | 47 FT | $32.00 | $27.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 225 SY | $22.50 | $18.20 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,932 | $6,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 13,154 CY | $197 | $2.59M | 51% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 305,474 SY | $2.35 | $718k | 14% |
| 254E01600 PATCHING PLANED SURFACE | 61,095 SY | $4.75 | $290k | 6% |
| 644E00104 EDGE LINE, 6" | 41.06 MILE | $4,375 | $180k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $175k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,800 SY | $49 | $137k | 3% |
| 644E00300 CENTER LINE | 21.18 MILE | $5,750 | $122k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 26,836 GAL | $3.25 | $87k | 2% |
| 621E00100 RPM | 1,943 EACH | $42 | $82k | 2% |
| 617E10100 COMPACTED AGGREGATE | 841 CY | $95 | $80k | 2% |