441E70000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG
2,571 CY
$210
$208
$305
$258
70%
251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN
3,086 SY
$30.00
$27.50
$13.00
$30.89
12%
254E01000PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"
61,712 SY
$1.50
$2.10
$0.63
$2.21
12%
407E20000NON-TRACKING TACK COAT
4,937 GAL
$3.00
$3.70
$7.00
$8.00
2%
614E11000MAINTAINING TRAFFIC
1 LS
$10,000
$27,250
$5,000
$15,000
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,500
$4,000
$15,000
Project details
Description
SCI-Shawnee SF HQ
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$12,000
1%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$5,500
$2,000
$6,500
$2,500
1%
624E10000MOBILIZATION
1 LS
$3,180
$20,000
$20,000
$2,500
0%
642E01200PARKING LOT STALL MARKING, TYPE 1
324 FT
$8.80
$7.00
$10.00
$4.50
0%
614E12460WORK ZONE MARKING SIGN
4 EACH
$150
$125
$400
$2,800
0%
642E01702HANDICAP SYMBOL MARKING, TYPE 1
1 EACH
$186
$500
$500
$250
0%
Qty
Unit price
Extended
%
441E70000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG
2,571 CY
$210
$540k
70%
251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN
3,086 SY
$30
$93k
12%
254E01000PAVEMENT PLANING, ASPHALT CONCRETE, 1.5"
61,712 SY
$1.5
$93k
12%
407E20000NON-TRACKING TACK COAT
4,937 GAL
$3
$15k
2%
614E11000MAINTAINING TRAFFIC
1 LS
$10,000
$10k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM