LAW-SR 141-16.94
LAW County · est $0.9M
Bid dateThursday, February 8—
LAW County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 47 FT | $4,500 | $6,350 | $6,500 | 31% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 150 FT | $400 | $415 | $450 | 9% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 67 CY | $800 | $700 | $750 | 8% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 120 FT | $400 | $470 | $450 | 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 28 CY | $1,450 | $950 | $750 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $20,000 | $20,000 | 6% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $25,000 |
| Item | Quantity | R1Axis Civil Construction LLC | R2D G M INC | R3R C Construction Company And Son |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 574 SY | $9.00 | $12.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 574 FT | $5.00 | $1.00 | $5.00 |
| 202E75000 FENCE REMOVED | 39 FT | $10.00 | $5.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 672 SY | $3.00 | $5.00 | $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $220 | $75.00 | $100 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $45,000 |
| $12,500 |
| 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $23,000 | $18,000 | $7,500 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 67 CY | $320 | $355 | $425 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,379 LB | $2.20 | $1.35 | $3.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $12,000 | $15,000 | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 50 CY | $400 | $410 | $475 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $20,000 | $25,000 | $15,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $25,000 | $35,000 | 3% |
| 203E10000 EXCAVATION | 526 CY | $30.00 | $25.00 | $35.00 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 55 CY | $250 | $290 | $100 | 2% |
| 304E20000 AGGREGATE BASE | 106 CY | $120 | $90.00 | $125 | 2% |
| 203E20000 EMBANKMENT | 307 CY | $30.00 | $25.00 | $25.00 | 1% |
| 832E30000 EROSION CONTROL | 9,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 2 EACH | $4,000 | $7,500 | $9,500 | 1% |
| $1,000 |
| $400 |
| $1,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 10 CY | $125 | $70.00 | $125 |
| 659E10000 SEEDING AND MULCHING | 1,058 SY | $3.10 | $4.00 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 53 SY | $3.10 | $0.05 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $1,400 | $1,500 | $1,200 |
| 659E31000 LIME | 0.22 ACRE | $150 | $300 | $800 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 153 FT | $15.00 | $30.00 | $40.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $18.00 | $6.00 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $18.00 | $6.00 | $10.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $20.00 | $8.00 | $10.00 |
| 407E10000 TACK COAT | 65 GAL | $5.00 | $2.50 | $20.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 39 CY | $80.00 | $130 | $125 |
| 621E00100 RPM | 4 EACH | $1,250 | $1,250 | $1,250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $25.00 | $1.00 | $50.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 15.9 FT | $100 | $20.00 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $225 | $100 | $375 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $11,875 | $13,000 | $13,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $24,000 | $26,000 | $18,000 |
| 304E20000 AGGREGATE BASE | 55 CY | $80.00 | $60.00 | $75.00 |
| 407E10000 TACK COAT | 37 GAL | $5.00 | $2.50 | $20.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 28 CY | $280 | $335 | $100 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $65.00 | $50.00 | $40.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,500 | $7,000 | $35,000 |
| 616E10000 WATER | 2 MGAL | $1.00 | $1.00 | $1.00 |
| 202E23500 WEARING COURSE REMOVED | 38 SY | $18.00 | $12.00 | $30.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $720 | $1,500 | $750 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 89 SY | $35.00 | $35.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 95 SY | $21.00 | $20.00 | $30.00 |
| 512E33010 TYPE 3 WATERPROOFING | 176 SY | $36.00 | $35.00 | $65.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 63 SF | $7.00 | $15.00 | $30.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 6 CY | $300 | $200 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 62 FT | $10.00 | $25.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 11 FT | $20.00 | $25.00 | $20.00 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 57 CY | $120 | $120 | $195 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $28,500 | $30,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $3,200 | $800 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $5,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 47 FT | $4,500 | $212k | 27% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 150 FT | $400 | $60k | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 67 CY | $800 | $54k | 7% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 120 FT | $400 | $48k | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 28 CY | $1,450 | $41k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $25,000 | $25k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $23,000 | $23k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 67 CY | $320 | $21k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,379 LB | $2.2 | $21k | 3% |