How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$15.00
$4.50
644E00620CROSSWALK LINE, 12"
72 FT
$20.00
$5.50
644E01300LANE ARROW
2 EACH
$275
$150
614E12460WORK ZONE MARKING SIGN
16 EACH
$65.00
$80.00
614E23690WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P
104 FT
$5.00
$1.50
614E30650WORK ZONE ARROW, CLASS III, 642 PAINT
4 EACH
$75.00
$80.00
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$1,470
$2,500
21%
Top items by winning bid
Item
Qty
Unit price
Extended
%
441E10000ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG
1,322 CY
$216
$286k
27%
441E10200ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2
446 (1379 CY
$190
$262k
25%
251E01041PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA