CLE-SR 133-20.30 Shared Use Path
CLE County · est $0.7M
Bid dateThursday, April 4—
CLE County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3Sunesis Construction CO | R4Prus Construction Company | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,426 CY | $50.00 | $27.50 | $32.00 | $28.75 | $30.69 | 21% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 547 SY | $90.00 | $86.00 | $133 | $125 | $94.07 | 8% |
| 203E10000 EXCAVATION | 1,595 CY | $30.00 | $24.00 | $23.25 | $33.00 | $25.13 | 8% |
| 304E20000 AGGREGATE BASE | 516 CY | $80.00 | $115 | $129 | $105 | $171 | 7% |
| 608E52000 CURB RAMP | 681 SF | $50.00 | $18.00 | $22.35 | $21.00 | $19.77 | 6% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS |
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3Sunesis Construction CO | R4Prus Construction Company | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 253 SY | $20.00 | $30.75 | $84.25 | $23.00 | $45.43 |
| 202E30000 WALK REMOVED | 40 SF | $20.00 | $5.50 | $13.25 | $9.00 | $12.26 |
| 202E32000 CURB REMOVED | 17 FT | $10.00 | $16.50 | $22.25 | $28.00 | $30.02 |
| 202E32500 CURB AND GUTTER REMOVED | 461 FT | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $25,000 |
| $22,000 |
| $8,160 |
| $20,500 |
| $18,216 |
| 4% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (62 CY | $400 | $425 | $387 | $425 | $550 | 4% |
| 659E00300 TOPSOIL | 495 CY | $50.00 | $86.00 | $116 | $85.00 | $4.13 | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 483 FT | $50.00 | $34.00 | $49.25 | $50.00 | $37.37 | 4% |
| 832E30000 EROSION CONTROL | 22,957 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 45 CY | $500 | $600 | $387 | $510 | $650 | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 283 FT | $75.00 | $34.00 | $49.50 | $50.00 | $37.76 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,500 | $75,000 | $18,950 | $100,000 | $113,630 | 3% |
| 609E14000 CURB, TYPE 2-A | 328 FT | $52.00 | $11.00 | $24.50 | $20.75 | $15.02 | 3% |
| 607E98000 FENCE, MISC.: WOOD FENCE | 534 FT | $30.00 | $57.50 | $57.50 | $63.25 | $57.50 | 3% |
| 611E97010 SLOTTED DRAIN, TYPE 2, 12" | 100 FT | $150 | $192 | $255 | $175 | $234 | 3% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $300 | $115 | $94.00 | $215 | $219 | 3% |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 50 CY | $300 | $110 | $96.00 | $220 | $219 | 3% |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $15,000 | $10,000 | $6,970 | $18,500 | $6,286 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $13,000 | $8,500 | $13,000 | $15,000 | $28,367 | 2% |
| $7.25 |
| $20.50 |
| $15.25 |
| $8.85 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 94 FT | $50.00 | $12.25 | $45.25 | $30.00 | $71.09 |
| 202E38000 GUARDRAIL REMOVED | 739 FT | $10.00 | $6.00 | $6.00 | $6.60 | $6.00 |
| 202E58300 CATCH BASIN OR INLET REMOVED | 1 EACH | $500 | $250 | $1,550 | $1,015 | $660 |
| 202E75600 METER VAULT REMOVED | 1 EACH | $500 | $325 | $2,725 | $1,000 | $553 |
| 202E98100 REMOVAL MISC.: COMMERCIAL SIGN REMOVED | 1 EACH | $500 | $250 | $140 | $825 | $1,457 |
| 202E98100 REMOVAL MISC.: FENCE POST REMOVED | 4 EACH | $100 | $25.00 | $25.00 | $27.50 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 3,045 SY | $3.00 | $5.50 | $5.25 | $2.25 | $4.09 |
| 204E45000 PROOF ROLLING | 2 HOUR | $150 | $1,500 | $400 | $125 | $262 |
| 608E12000 5" CONCRETE WALK | 613 SF | $15.00 | $8.00 | $12.75 | $12.30 | $9.93 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 45 CY | $200 | $145 | $167 | $107 | $322 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $145 | $150 | $160 | $150 |
| 659E10000 SEEDING AND MULCHING | 4,458 SY | $1.25 | $1.40 | $5.00 | $1.54 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 223 SY | $2.00 | $1.40 | $2.00 | $1.54 | $1.00 |
| 659E15000 INTER-SEEDING | 223 SY | $2.00 | $0.75 | $2.00 | $0.83 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.63 TON | $1,400 | $900 | $1,400 | $990 | $1,100 |
| 659E31000 LIME | 0.93 ACRE | $450 | $75.00 | $450 | $82.51 | $250 |
| 659E35000 WATER | 25 MGAL | $1.00 | $1.00 | $1.00 | $1.10 | $20.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $7,500 | $2,500 | $1,745 | $1,925 | $1,745 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,500 | $5,000 | $4,410 | $1,100 | $2,370 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $2,500 | $10,000 | $8,275 | $10,250 | $8,270 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 89 SY | $3.25 | $7.10 | $3.25 | $7.80 | $5.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $2,000 | $3,000 | $5,850 | $5,500 | $4,742 |
| 605E31100 AGGREGATE DRAINS | 100 FT | $30.00 | $15.00 | $13.50 | $23.00 | $61.19 |
| 611E04900 12" CONDUIT, TYPE D, 12" | 151 FT | $50.00 | $110 | $106 | $70.25 | $102 |
| 611E98504 CATCH BASIN, NO. 2-2C | 1 EACH | $5,000 | $1,500 | $2,650 | $3,650 | $4,058 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $350 | $325 | $500 | $1,000 | $803 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 10 CY | $500 | $950 | $540 | $455 | $750 |
| 407E20000 NON-TRACKING TACK COAT | 171 GAL | $3.00 | $4.00 | $3.50 | $8.00 | $10.00 |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $500 | $800 | $660 | $480 | $950 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (13 CY | $400 | $1,050 | $519 | $595 | $750 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 55 SY | $70.00 | $72.00 | $72.00 | $101 | $80.07 |
| 609E26000 CURB, TYPE 6 | 170 FT | $60.00 | $30.00 | $43.00 | $39.50 | $34.60 |
| 638E11102 METER AND VAULT REMOVED AND RESET | 1 EACH | $1,000 | $375 | $2,140 | $1,800 | $829 |
| 638E20778 SPECIAL - 2" COPPER WATER SERVICE LINEVILLAGE OF W | 20 FT | $100 | $125 | $375 | $190 | $261 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $500 | $1,200 | $500 | $750 | $1,110 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 154 FT | $15.00 | $17.00 | $17.00 | $18.70 | $17.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $55.00 | $45.00 | $45.00 | $49.50 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 60 SF | $16.00 | $19.00 | $19.00 | $20.90 | $19.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $15.00 | $15.00 | $15.00 | $16.50 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 12 EACH | $45.00 | $30.00 | $30.00 | $33.00 | $30.00 |
| 644E00500 STOP LINE | 13 FT | $33.00 | $9.00 | $22.25 | $36.30 | $9.00 |
| 644E00630 CROSSWALK LINE, 24" | 154 FT | $23.00 | $9.00 | $22.25 | $25.30 | $9.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $300 | $350 | $570 | $435 | $232 |
| 616E10000 WATER | 13 MGAL | $10.00 | $25.00 | $27.25 | $10.00 | $205 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $7,342 | $5,210 | $7,000 | $5,197 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $15,000 | $10,550 | $16,500 | $6,049 |
| 624E10000 MOBILIZATION | 1 LS | $3,500 | $20,000 | $46,775 | $20,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,426 CY | $50 | $121k | 16% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 547 SY | $90 | $49k | 7% |
| 203E10000 EXCAVATION | 1,595 CY | $30 | $48k | 6% |
| 304E20000 AGGREGATE BASE | 516 CY | $80 | $41k | 6% |
| 608E52000 CURB RAMP | 681 SF | $50 | $34k | 5% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $25,000 | $25k | 3% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (62 CY | $400 | $25k | 3% |
| 659E00300 TOPSOIL | 495 CY | $50 | $25k | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 483 FT | $50 | $24k | 3% |
| 832E30000 EROSION CONTROL | 22,957 EACH | $1 | $23k | 3% |