UNI-US 33-08.72
UNI County · est $4.9M
Bid dateThursday, February 22—
UNI County · est $4.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Perk Company INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 11,575 SY | $229 | $275 | $379 | 61% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 15,000 DLR | $28.00 | $28.00 | $28.00 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $402,000 | $192,000 | $474,500 | 9% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, | 1,297 SY | $194 | $169 | $169 | 6% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $121,000 | $113,500 | $120,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $82,125 | $410,000 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST |
| Item | Quantity | R1Shelly & Sands INC | R2Perk Company INC | R3Shelly Company |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 127 EACH | $14.00 | $1.00 | $12.75 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 4 EACH | $2,510 | $2,500 | $1,800 |
| 632E27200 LOOP DETECTOR TIE IN | 4 EACH | $107 | $2,500 | $150 |
| 642E00204 LANE LINE, 6", TYPE 1 | 7.9 MILE | $756 | $700 | $707 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 800 HOUR |
| $96.00 |
| $100 |
| $85.00 |
| 2% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $5,000 | $2,750 | $7,750 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $39,650 | $5,000 | $15,000 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 48 SNMT | $802 | $750 | $750 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 28.36 MILE | $936 | $900 | $875 | 1% |
| 511E52110 CLASS QC MS CONCRETE | 10 CY | $2,500 | $1,240 | $5,750 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $24,100 | $45,000 | $40,000 | 1% |
| 896E00020 PORTABLE CHANGEABLE MESSAGE SIGN | 12 SNMT | $1,980 | $1,850 | $1,850 | 1% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 104 SF | $198 | $45.00 | $185 | 0% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 24 SNMT | $802 | $750 | $750 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $800 | $1,235 | $750 | 0% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 69 SF | $198 | $45.00 | $185 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 36 EACH | $374 | $350 | $350 | 0% |
| 621E00100 RPM | 127 EACH | $83.00 | $250 | $68.50 | 0% |
| 1,206 FT |
| $1.00 |
| $3.00 |
| $0.95 |
| 642E00500 STOP LINE, TYPE 1 | 13 FT | $10.70 | $5.00 | $10.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 18 FT | $8.60 | $3.50 | $8.00 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 6 FT | $16.00 | $5.00 | $15.00 |
| 642E00720 CHEVRON MARKING, TYPE 1 | 115 FT | $8.60 | $5.00 | $8.00 |
| 642E01300 LANE ARROW, TYPE 1 | 1 EACH | $118 | $125 | $110 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 808 FT | $1.05 | $3.00 | $1.00 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.78 MILE | $1,603 | $1,500 | $1,500 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,206 FT | $1.60 | $1.50 | $1.50 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $5.17 | $18.00 | $4.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 50 SY | $37.50 | $145 | $35.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 8 SY | $37.50 | $145 | $35.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 11,575 SY | $229 | $2.65M | 61% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 15,000 DLR | $28 | $420k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $402,000 | $402k | 9% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, | 1,297 SY | $194 | $252k | 6% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $121,000 | $121k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 800 HOUR | $96 | $77k | 2% |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 10 CY | $5,000 | $50k | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $39,650 | $40k | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 48 SNMT | $802 | $38k | 1% |