STA-US 62/SR 183-38.97/16.33
STA County · est $2.3M
Bid dateThursday, March 21—
STA County · est $2.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 52 more items below.
| Item | Quantity | R1Shelly Company | R2Northstar Asphalt INC | R3Karvo Companies INC | % of bid |
|---|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1704 CY | $175 | $182 | $175 | 17% |
| 424E13101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A | 449 (991 CY | $215 | $280 | $260 | 12% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (821 CY | $250 | $233 | $240 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $188,150 | $185,000 | $200,000 | 11% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (846 CY | $175 | $190 | $200 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.85 | $2.46 | $2.50 | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 3,500 SY |
| Item | Quantity | R1Shelly Company | R2Northstar Asphalt INC | R3Karvo Companies INC |
|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 60 SY | $50.00 | $36.00 | $5.00 |
| 202E32000 CURB REMOVED | 247 FT | $14.00 | $12.00 | $25.00 |
| 202E32500 CURB AND GUTTER REMOVED | 355 FT | $10.00 | $15.00 | $35.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 84 CY | $50.00 | $80.00 | $15.00 |
| 209E60200 LINEAR GRADING | 35 STA | $85.00 | $125 | $200 |
| 608E10000 4" CONCRETE WALK | 247 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $35.00 |
| $46.00 |
| $50.00 |
| 7% |
| 608E52000 CURB RAMP | 2,784 SF | $25.00 | $22.90 | $22.00 | 4% |
| 253E01000 PAVEMENT REPAIR | 500 SY | $100 | $86.00 | $120 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 42 EACH | $1,000 | $850 | $1,750 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 38 EACH | $1,100 | $1,400 | $1,800 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $65,000 | $175,000 | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 28 EACH | $1,400 | $1,500 | $1,400 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 60 CY | $500 | $860 | $525 | 2% |
| 407E13900 TACK COAT, 702.13 AT 0.09 GAL/SY | 7,162 GAL | $4.00 | $3.25 | $2.75 | 2% |
| 646E10510 CROSSWALK LINE, 12" | 5,421 FT | $4.15 | $4.15 | $4.15 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $90.00 | $100 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 355 FT | $55.00 | $70.00 | $65.00 | 1% |
| 202E30000 WALK REMOVED | 3,103 SF | $6.00 | $4.05 | $8.00 | 1% |
| 646E10200 CENTER LINE | 3.83 MILE | $4,500 | $4,500 | $4,500 | 1% |
| $12.00 |
| $8.50 |
| $12.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,000 | $1,200 | $2,175 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $5,000 | $2,800 | $1,250 |
| 659E10000 SEEDING AND MULCHING | 973 SY | $4.00 | $5.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $2,000 | $4,500 | $2,000 |
| 659E31000 LIME | 0.2 ACRE | $0.10 | $3,000 | $10.00 |
| 659E35000 WATER | 5.25 MGAL | $0.10 | $1.00 | $0.01 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 11 EACH | $900 | $1,600 | $1,225 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,600 | $3,500 | $1,550 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 7 EACH | $1,300 | $2,000 | $2,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 400 LB | $4.00 | $2.50 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,000 FT | $3.25 | $2.00 | $4.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 84 CY | $35.00 | $100 | $50.00 |
| 407E20000 NON-TRACKING TACK COAT AT 0.06 GAL/SY | 4,772 GAL | $2.50 | $3.00 | $2.75 |
| 408E10001 PRIME COAT, AS PER PLAN AT 0.40 GAL/SY | 310 GAL | $5.00 | $6.00 | $6.25 |
| 609E26000 CURB, TYPE 6 | 426 FT | $30.00 | $37.00 | $40.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 44 CY | $100 | $200 | $200 |
| 646E10010 EDGE LINE, 6" | 0.64 MILE | $3,150 | $3,150 | $3,150 |
| 646E10110 LANE LINE, 6" | 2 MILE | $1,500 | $1,500 | $1,500 |
| 646E10300 CHANNELIZING LINE, 8" | 926 FT | $1.75 | $1.50 | $1.50 |
| 646E10310 CHANNELIZING LINE, 12" | 2,121 FT | $1.75 | $1.75 | $1.75 |
| 646E10400 STOP LINE | 677 FT | $13.00 | $13.00 | $13.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,788 FT | $7.00 | $7.00 | $7.00 |
| 646E10800 ISLAND MARKING | 456 SF | $9.00 | $9.00 | $9.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $600 | $600 | $600 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $600 | $600 | $600 |
| 646E20300 LANE ARROW | 68 EACH | $140 | $135 | $135 |
| 646E20370 TWO WAY LEFT TURN ARROW | 4 EACH | $140 | $225 | $225 |
| 646E20504 DOTTED LINE, 6" | 130 FT | $1.50 | $1.50 | $1.50 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $100 | $100 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $120 | $250 | $200 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $900 | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 4 MILE | $675 | $675 | $675 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2 MILE | $675 | $675 | $675 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 7.66 MILE | $1,200 | $1,200 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.83 MILE | $1,200 | $1,200 | $1,200 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.64 MILE | $850 | $850 | $850 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,852 FT | $0.65 | $0.50 | $0.50 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 4,242 FT | $0.65 | $0.65 | $0.65 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 926 FT | $0.65 | $0.50 | $0.50 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 2,121 FT | $0.65 | $0.65 | $0.65 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 1,354 FT | $3.25 | $3.25 | $3.25 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 677 FT | $3.25 | $3.25 | $3.25 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $6,250 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $1,800 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $3,250 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1704 CY | $175 | $298k | 15% |
| 424E13101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A | 449 (991 CY | $215 | $213k | 11% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (821 CY | $250 | $205k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $188,150 | $188k | 10% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (846 CY | $175 | $148k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.85 | $147k | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 3,500 SY | $35 | $123k | 6% |
| 608E52000 CURB RAMP | 2,784 SF | $25 | $70k | 4% |
| 253E01000 PAVEMENT REPAIR | 500 SY | $100 | $50k | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 42 EACH | $1,000 | $42k | 2% |