WAR-SR 123-29.40 Community Park
WAR County · est $2.6M
Bid dateThursday, March 21—
WAR County · est $2.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 120 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Sunesis Construction CO | R3Barrett Paving Materials INC | R4Kelchner INC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,205 CY | $170 | $172 | $172 | $180 | 14% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,907 CY | $53.72 | $67.01 | $64.00 | $65.00 | 10% |
| 304E20000 AGGREGATE BASE | 1,669 CY | $71.72 | $79.31 | $92.00 | $75.00 | 8% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (396 CY | $230 | $190 | $239 | $200 | 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,245 CY | $39.79 | $31.65 | $45.00 | $20.00 | 6% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,554 FT | $34.93 | $38.39 | $32.00 | $38.00 |
| Item | Quantity | R1John R Jurgensen Company | R2Sunesis Construction CO | R3Barrett Paving Materials INC | R4Kelchner INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $19,412 | $8,813 | $10,000 | $30,000 |
| 202E30000 WALK REMOVED | 5,282 SF | $2.55 | $1.35 | $4.00 | $3.25 |
| 202E32000 CURB REMOVED | 86 FT | $9.59 | $11.41 | $14.50 | $17.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 141 FT | $49.39 | $17.79 | $24.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $133,925 | $50,000 | $73,000 | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 282 CY | $275 | $244 | $242 | $255 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $68,026 | $34,695 | $110,000 | $20,000 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,487 FT | $26.82 | $17.50 | $23.00 | $19.00 | 4% |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $59,738 | $59,759 | $55,500 | $85,000 | 4% |
| 611E04400 12" CONDUIT, TYPE B | 733 FT | $81.39 | $74.16 | $113 | $115 | 4% |
| 202E23000 PAVEMENT REMOVED | 6,731 SY | $8.59 | $10.35 | $10.00 | $12.00 | 4% |
| 203E10000 EXCAVATION | 4,081 CY | $13.15 | $13.38 | $23.00 | $33.00 | 4% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 339 SY | $130 | $131 | $124 | $130 | 3% |
| 630E97700 SIGNING, MISC.:SOLAR - POWERED RECTANGULAR RAPID F | 8 EACH | $4,950 | $5,247 | $4,950 | $8,000 | 3% |
| 203E20000 EMBANKMENT | 3,658 CY | $10.13 | $15.29 | $20.50 | $5.00 | 2% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 980 CY | $34.74 | $56.25 | $56.25 | $40.00 | 2% |
| 625E25600 CONDUIT, 4", 725.04 | 745 FT | $45.00 | $47.70 | $45.00 | $48.00 | 2% |
| 550 FT |
| $2.20 |
| $6.00 |
| $2.20 |
| $7.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $580 | $532 | $475 | $950 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 169 FT | $9.50 | $15.48 | $10.00 | $13.00 |
| 202E98100 REMOVAL MISC.: BOLLARD | 5 EACH | $195 | $137 | $195 | $250 |
| 204E10000 SUBGRADE COMPACTION | 9,638 SY | $2.44 | $2.72 | $1.75 | $4.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $237 | $296 | $200 | $120 |
| 204E51000 GEOGRID | 6,494 SY | $2.10 | $1.94 | $2.75 | $2.50 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 142 FT | $4.45 | $1.80 | $6.00 | $6.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $54.80 | $30.00 | $54.80 | $31.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE EMASH 2016 | 1 EACH | $4,160 | $2,600 | $4,160 | $2,700 |
| 608E12000 5" CONCRETE WALK | 3,222 SF | $8.20 | $8.80 | $7.00 | $9.00 |
| 608E52000 CURB RAMP | 1,456 SF | $17.69 | $18.38 | $16.00 | $19.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 3 EACH | $1,099 | $1,369 | $1,800 | $1,250 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $30,124 | $15,520 | $25,000 | $6,000 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 13 SY | $314 | $258 | $258 | $78.00 |
| 659E00100 SOIL ANALYSIS TEST | 5 EACH | $150 | $135 | $135 | $150 |
| 659E10000 SEEDING AND MULCHING | 8,829 SY | $0.81 | $3.41 | $1.03 | $1.20 |
| 659E20000 COMMERCIAL FERTILIZER | 1.19 TON | $1,000 | $925 | $925 | $1,000 |
| 659E31000 LIME | 1.8 ACRE | $250 | $100 | $100 | $100 |
| 659E35000 WATER | 48 MGAL | $25.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,965 | $1,965 | $2,000 | $4,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,900 | $9,000 | $6,000 | $11,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,946 | $11,946 | $12,000 | $13,000 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 13 SY | $314 | $168 | $258 | $265 |
| 602E20000 CONCRETE MASONRY | 2 CY | $3,070 | $3,399 | $2,600 | $3,500 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 33 FT | $31.97 | $26.10 | $31.00 | $32.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 70 FT | $58.05 | $45.47 | $44.00 | $33.00 |
| 611E04200 12" CONDUIT, TYPE A, 706.02, 706.08, 707.42, OR 70 | 76 FT | $90.58 | $93.22 | $81.00 | $107 |
| 611E04600 12" CONDUIT, TYPE C | 62 FT | $80.59 | $293 | $102 | $100 |
| 611E05900 15" CONDUIT, TYPE B | 83 FT | $117 | $98.81 | $130 | $111 |
| 611E07200 18" CONDUIT, TYPE A, 706.02, 706.08, 707.42, OR 70 | 104 FT | $128 | $130 | $97.00 | $138 |
| 611E07400 18" CONDUIT, TYPE B | 92 FT | $143 | $127 | $145 | $114 |
| 611E10400 24" CONDUIT, TYPE B | 202 FT | $135 | $122 | $150 | $141 |
| 611E10600 24" CONDUIT, TYPE C | 61 FT | $144 | $127 | $115 | $142 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $3,803 | $4,803 | $5,100 | $4,900 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $2,852 | $3,624 | $4,500 | $2,750 |
| 611E98700 INLET, SIDE DITCH | 1 EACH | $2,107 | $2,188 | $2,600 | $3,000 |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $4,104 | $4,277 | $4,500 | $4,500 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $22,215 | $19,344 | $22,000 | $20,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $743 | $457 | $456 | $250 |
| 407E20000 NON-TRACKING TACK COAT | 890 GAL | $5.00 | $4.00 | $3.75 | $4.25 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $825 | $850 | $450 | $1,500 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (9 CY | $800 | $1,442 | $522 | $900 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 105 SY | $105 | $127 | $97.00 | $105 |
| 452E14011 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 81 SY | $188 | $189 | $181 | $195 |
| 609E26000 CURB, TYPE 6 | 799 FT | $23.93 | $26.11 | $21.00 | $26.00 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 55 FT | $34.17 | $39.27 | $30.00 | $36.00 |
| 609E28001 CURB, TYPE 7, AS PER PLAN | 138 FT | $37.93 | $44.24 | $35.00 | $41.00 |
| 609E33001 CURB, TYPE 10, AS PER PLAN | 308 FT | $34.93 | $41.93 | $32.00 | $38.00 |
| 609E98100 CURB, MISC.:COMBINATION CURB AND GUTTER TURNOUT | 4 EACH | $3,519 | $1,005 | $750 | $820 |
| 690E98400 SPECIAL - MISC.: CONSULTANT FOR CONCRETE QUALITY C | 1 LS | $12,324 | $5,000 | $15,000 | $4,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 17 EACH | $107 | $113 | $107 | $190 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 17 EACH | $107 | $113 | $107 | $185 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 27 EACH | $107 | $113 | $107 | $200 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN (40 FT) | 9 EACH | $3,100 | $3,286 | $3,100 | $3,800 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 9 EACH | $2,500 | $2,650 | $2,500 | $2,500 |
| 625E18001 BRACKET ARM, 10', AS PER PLAN | 4 EACH | $808 | $856 | $808 | $1,300 |
| 625E18401 BRACKET ARM, 20', AS PER PLAN | 5 EACH | $1,175 | $1,246 | $1,175 | $2,100 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 363 FT | $5.40 | $5.72 | $5.40 | $5.50 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 4,869 FT | $2.70 | $2.86 | $2.70 | $3.75 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 3,735 FT | $1.80 | $1.91 | $1.80 | $2.30 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,340 FT | $1.80 | $1.91 | $1.80 | $2.30 |
| 625E25400 CONDUIT, 2", 725.04 | 56 FT | $16.65 | $17.65 | $16.65 | $26.00 |
| 625E25408 CONDUIT, 2", 725.051 | 1,141 FT | $4.50 | $4.77 | $4.50 | $7.50 |
| 625E25504 CONDUIT, 3", 725.051 | 242 FT | $7.60 | $8.06 | $7.60 | $12.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 9 EACH | $535 | $567 | $535 | $450 |
| 625E29000 TRENCH | 1,489 FT | $11.50 | $12.19 | $11.50 | $15.00 |
| 625E29400 TRENCH IN PAVED AREA | 624 FT | $11.50 | $12.19 | $11.50 | $33.00 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 7 EACH | $1,050 | $1,113 | $1,050 | $990 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,050 | $1,113 | $1,050 | $1,200 |
| 625E32000 GROUND ROD | 9 EACH | $425 | $451 | $425 | $300 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $8,850 | $9,381 | $8,850 | $19,000 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $1,150 | $1,219 | $1,150 | $1,000 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $15.00 | $15.00 | $15.00 | $16.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 582 FT | $16.00 | $15.00 | $16.00 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 15 EACH | $45.00 | $45.00 | $45.00 | $48.00 |
| 630E80100 SIGN, FLAT SHEET | 275 SF | $19.60 | $18.25 | $19.60 | $18.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 19 EACH | $10.00 | $15.00 | $10.00 | $16.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $50.00 | $65.00 | $52.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 12 EACH | $19.00 | $35.00 | $19.00 | $38.00 |
| 630E97700 SIGNING, MISC.: REMOVAL OF SIGN AND FLASHING LIGHT | 1 EACH | $250 | $265 | $250 | $850 |
| 630E97700 SIGNING, MISC.:SOLAR - POWERED RECTANGULAR RAPID F | 8 EACH | $1,385 | $1,468 | $1,385 | $1,900 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 28 FT | $54.00 | $73.70 | $87.00 | $58.00 |
| 644E00104 EDGE LINE, 6" | 0.2 MILE | $7,500 | $4,410 | $7,500 | $8,000 |
| 644E00300 CENTER LINE | 0.22 MILE | $9,150 | $6,780 | $9,150 | $9,500 |
| 644E00404 CHANNELIZING LINE, 12" | 827 FT | $2.30 | $2.55 | $2.30 | $2.50 |
| 644E00500 STOP LINE | 18 FT | $10.00 | $8.50 | $10.00 | $10.25 |
| 644E00630 CROSSWALK LINE, 24" | 160 FT | $10.00 | $6.70 | $10.00 | $10.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 83 FT | $8.50 | $8.50 | $8.50 | $9.00 |
| 644E00720 CHEVRON MARKING | 96 FT | $8.50 | $8.50 | $8.50 | $9.00 |
| 644E01300 LANE ARROW | 10 EACH | $300 | $594 | $300 | $320 |
| 644E01520 DOTTED LINE, 12" | 272 FT | $3.00 | $3.40 | $3.00 | $3.25 |
| 644E20800 YIELD LINE | 100 FT | $25.00 | $34.00 | $25.00 | $27.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 5 CY | $328 | $78.70 | $250 | $220 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $99.30 | $75.00 | $95.00 | $88.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,970 | $9,986 | $5,970 | $6,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $171 | $432 | $525 | $775 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 30 SNMT | $825 | $978 | $825 | $1,050 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.22 MILE | $18,975 | $1,565 | $18,975 | $20,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.22 MILE | $18,975 | $1,565 | $18,975 | $20,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.19 MILE | $8,500 | $1,040 | $8,500 | $9,000 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.19 MILE | $8,500 | $1,040 | $8,500 | $9,000 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 827 FT | $0.85 | $1.05 | $0.85 | $0.90 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 827 FT | $0.85 | $1.05 | $0.85 | $0.90 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 272 FT | $0.65 | $1.75 | $0.65 | $0.70 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 272 FT | $0.65 | $1.75 | $0.65 | $0.70 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 160 FT | $6.00 | $2.15 | $6.00 | $6.50 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 160 FT | $6.00 | $2.15 | $6.00 | $6.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 10 EACH | $75.00 | $67.70 | $75.00 | $81.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 10 EACH | $75.00 | $67.70 | $75.00 | $81.00 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: YIELD LINE, TYP | 100 FT | $10.00 | $17.50 | $10.00 | $10.00 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: YIELD LINE, TYP | 100 FT | $10.00 | $17.50 | $10.00 | $10.00 |
| 616E10000 WATER | 20 MGAL | $121 | $17.36 | $80.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,779 | $13,074 | $8,341 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 10 MNTH | $2,047 | $960 | $1,500 | $6,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,963 | $35,800 | $40,000 | $30,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,205 CY | $170 | $205k | 9% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,907 CY | $53.72 | $156k | 7% |
| 304E20000 AGGREGATE BASE | 1,669 CY | $71.72 | $120k | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (396 CY | $230 | $91k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,245 CY | $39.79 | $89k | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,554 FT | $34.93 | $89k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $80,000 | $80k | 3% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 282 CY | $275 | $78k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $68,026 | $68k | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,487 FT | $26.82 | $67k | 3% |