MOT-Webster St Resurfacing
MOT County · est $0.9M
Bid dateThursday, April 4—
MOT County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 5 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company | % of bid |
|---|---|---|---|---|
| 253E01000 PAVEMENT REPAIR | 2,796 SY | $170 | $167 | 48% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,280 CY | $205 | $207 | 26% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 30,600 SY | $2.00 | $1.76 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $76,523 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $40,000 | 4% |
| 644E00300 CENTER LINE | 2.82 MILE | $4,800 | $4,800 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.64 MILE | $2,300 | $2,088 | 1% |
| 644E00104 EDGE LINE, 6" | 2.76 MILE | $4,100 | $4,100 | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 100 CY | $100 | $114 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,295 GAL | $3.75 | $4.00 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 6 EACH | $1,375 | $1,375 | 1% |
| 204E13000 EXCAVATION OF SUBGRADE | 100 CY | $73.00 | $77.68 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $1,150 | $1,035 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,313 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $950 | $517 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,425 | $2,897 | 0% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $95.00 | $87.44 | 0% |
| 644E01300 LANE ARROW | 16 EACH | $100 | $100 | 0% |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 254 FT | $6.00 | $5.00 | 0% |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $695 | $695 | 0% |
| Item | Quantity | R1Barrett Paving Materials INC | R2John R Jurgensen Company |
|---|---|---|---|
| 632E27200 LOOP DETECTOR TIE IN | 6 EACH | $115 | $115 |
| 644E00400 CHANNELIZING LINE, 8" | 484 FT | $1.50 | $1.50 |
| 644E00500 STOP LINE | 95 FT | $6.50 | $6.50 |
| 614E12460 WORK ZONE MARKING SIGN | 4 EACH | $125 | $125 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 652 FT | $2.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E01000 PAVEMENT REPAIR | 2,796 SY | $170 | $475k | 48% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,280 CY | $205 | $262k | 26% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 30,600 SY | $2 | $61k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $60k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $35,000 | $35k | 4% |
| 644E00300 CENTER LINE | 2.82 MILE | $4,800 | $14k | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.64 MILE | $2,300 | $13k | 1% |
| 644E00104 EDGE LINE, 6" | 2.76 MILE | $4,100 | $11k | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 100 CY | $100 | $10k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,295 GAL | $3.75 | $9k | 1% |