| Item | Quantity | R1Adena Corporation | R2Eclipse CO LLC | R3Digioia-suburban Excavating LLC | R4Fabrizi Trucking & Paving CO INC | R5Stanley Miller Construction Company | R6Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.85, 707.02 (0.168 | 100 FT | $701 | $427 | $660 | $640 | $640 | $2,100 | 16% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 155 CY | $276 | $325 | $241 | $351 | $234 | $550 | 10% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 88 CY | $399 | $435 |
| Item | Quantity | R1Adena Corporation | R2Eclipse CO LLC | R3Digioia-suburban Excavating LLC | R4Fabrizi Trucking & Paving CO INC | R5Stanley Miller Construction Company | R6Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 4 EACH | $298 | $1,143 | $600 | $300 | $500 | $5,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 43 FT | $2.20 | $33.00 | $15.00 | $15.00 | $67.18 | $50.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 46 FT | $32.92 | $155 | $85.00 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $600 |
| $470 |
| $568 |
| $825 |
| 8% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (0.168 | 64 FT | $519 | $335 | $730 | $510 | $943 | $2,100 | 8% |
| 602E20000 CONCRETE MASONRY | 26.3 CY | $1,165 | $2,233 | $1,100 | $1,172 | $860 | $500 | 7% |
| 203E20000 EMBANKMENT | 683 CY | $38.49 | $33.00 | $40.00 | $50.00 | $71.00 | $25.00 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,684 | $23,000 | $9,500 | $30,000 | $2,000 | $20,000 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,710 | $1,000 | $21,500 | $14,000 | $7,667 | $15,000 | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $19,750 | $12,000 | $25,000 | $1,500 | $6,556 | $40,000 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $16,110 | $23,000 | $14,800 | $10,000 | $2,000 | $20,000 | 4% |
| 304E20000 AGGREGATE BASE | 166 CY | $95.00 | $86.00 | $80.00 | $64.00 | $186 | $65.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $14,580 | $25,009 | $25,000 | $42,000 | $27,000 | $59,230 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 103 CY | $122 | $148 | $190 | $120 | $205 | $150 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIES 0" TO 3 | 230 SY | $53.27 | $20.00 | $30.80 | $22.00 | $30.00 | $30.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,319 | $18,000 | $24,000 | $24,000 | $25,000 | $35,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,266 | $12,315 | $10,500 | $8,500 | $8,917 | $35,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 138 SY | $70.45 | $20.00 | $41.00 | $22.00 | $40.00 | $35.00 | 2% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 105 SY | $82.09 | $58.00 | $95.00 | $215 | $196 | $50.00 | 2% |
| 601E11000 RIPRAP, TYPE D | 35 SY | $244 | $173 | $185 | $200 | $680 | $300 | 2% |
| 202E23000 PAVEMENT REMOVED | 586 SY | $14.07 | $19.00 | $21.50 | $15.00 | $22.49 | $20.00 | 2% |
| $159 |
| $100 |
| 202E38000 GUARDRAIL REMOVED | 225 FT | $8.41 | $2.00 | $4.00 | $2.25 | $2.23 | $40.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $94.66 | $135 | $144 | $150 | $150 | $1,500 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $94.66 | $95.00 | $101 | $110 | $106 | $1,000 |
| 202E75000 FENCE REMOVED | 21 FT | $4.50 | $5.00 | $16.00 | $10.00 | $15.50 | $20.00 |
| 202E98100 REMOVAL MISC.: LARGE ROCK | 1 EACH | $94.66 | $1,081 | $300 | $100 | $4,000 | $500 |
| 203E10000 EXCAVATION | 161 CY | $21.18 | $27.00 | $35.00 | $35.00 | $89.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 660 SY | $2.29 | $1.00 | $3.00 | $2.00 | $2.00 | $10.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $30.33 | $22.50 | $24.00 | $25.00 | $24.89 | $33.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $3,702 | $2,820 | $3,015 | $3,075 | $3,133 | $1,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,809 | $1,340 | $1,435 | $1,460 | $1,489 | $1,300 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 3 EACH | $2,545 | $1,874 | $1,245 | $750 | $4,482 | $1,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $829 | $685 | $380 | $1,500 | $5,778 | $750 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $5,373 | $3,690 | $1,200 | $1,400 | $1,333 | $5,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $5,373 | $3,690 | $1,200 | $1,400 | $1,333 | $3,000 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $150 | $132 | $150 | $450 | $150 | $500 |
| 659E00300 TOPSOIL | 179 CY | $25.38 | $79.00 | $45.00 | $72.00 | $45.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 1,614 SY | $2.20 | $4.00 | $3.50 | $3.00 | $3.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 81 SY | $1.00 | $1.00 | $1.00 | $3.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 81 SY | $1.00 | $1.00 | $0.50 | $3.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $1,308 | $830 | $940 | $1,225 | $1,000 | $800 |
| 659E31000 LIME | 0.33 ACRE | $407 | $26.00 | $300 | $1,700 | $150 | $800 |
| 659E35000 WATER | 8.94 MGAL | $1.00 | $1.00 | $5.00 | $225 | $1.00 | $10.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 673 SY | $1.60 | $2.65 | $4.00 | $2.00 | $6.00 | $5.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 272 FT | $8.39 | $27.00 | $25.00 | $15.00 | $30.00 | $25.00 |
| 611E03300 10" CONDUIT, TYPE C | 10 FT | $29.93 | $59.00 | $100 | $150 | $100 | $45.00 |
| 611E04600 12" CONDUIT, TYPE C | 55 FT | $52.63 | $101 | $65.00 | $150 | $65.00 | $105 |
| 611E07600 18" CONDUIT, TYPE C | 53 FT | $75.64 | $97.00 | $95.00 | $175 | $82.00 | $95.00 |
| 611E10900 24" CONDUIT, TYPE D | 41 FT | $113 | $109 | $98.00 | $195 | $100 | $375 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $1,975 | $4,165 | $2,800 | $2,460 | $8,111 | $1,000 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,828 | $6,065 | $4,500 | $8,555 | $9,000 | $4,000 |
| 304E20000 AGGREGATE BASE (DRIVEWAYS) | 11 CY | $111 | $94.00 | $80.00 | $64.00 | $300 | $65.00 |
| 407E10000 TACK COAT | 119 GAL | $8.62 | $5.00 | $15.00 | $6.00 | $3.89 | $20.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 83 GAL | $27.86 | $5.00 | $40.00 | $6.00 | $12.50 | $40.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $37.86 | $5.00 | $45.00 | $250 | $500 | $200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $15.99 | $12.50 | $20.00 | $15.00 | $20.00 | $11.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.13 MILE | $12,224 | $11,185 | $12,000 | $10,320 | $10,617 | $20,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $16,292 | $14,970 | $15,200 | $13,750 | $14,150 | $30,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,215 | $1,092 | $1,100 | $1,050 | $1,056 | $4,000 |
| 602E20000 CONCRETE MASONRY | 4.4 CY | $1,735 | $1,621 | $820 | $1,385 | $1,000 | $500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 18 SY | $88.27 | $46.00 | $40.00 | $50.00 | $300 | $35.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,036 | $10,500 | $6,500 | $5,000 | $10,000 | $45,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,137 | $11,500 | $12,500 | $5,000 | $9,000 | $55,000 |
| 619E16020 FIELD OFFICE, TYPE C | 6 MNTH | $500 | $650 | $2,500 | $3,500 | $1,500 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.85, 707.02 (0.168 | 100 FT | $700.7 | $70k | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 155 CY | $276.27 | $43k | 8% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 88 CY | $398.73 | $35k | 6% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (0.168 | 64 FT | $519.43 | $33k | 6% |
| 602E20000 CONCRETE MASONRY | 26.3 CY | $1,165 | $31k | 6% |
| 203E20000 EMBANKMENT | 683 CY | $38.49 | $26k | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,684 | $24k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,710 | $21k | 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $19,750 | $20k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $16,110 | $16k | 3% |