ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 172 more items below.
| Item | Quantity | R1John R Jurgensen Company | R2Prus Construction Company | R3Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), PG64-22 | 5,813 CY | $167 | $187 | $195 | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $846,918 | $500,000 | $375,000 | 14% |
| 661E99940 PLANTING, MISC.:MEDIAN LANDSCAPING | 1 LS | $452,700 | $515,000 | $452,700 | 7% |
| 304E20000 AGGREGATE BASE | 5,479 CY | $72.26 | $86.00 | $100 | 7% |
| 202E23000 PAVEMENT REMOVED | 29,055 SY | $11.38 | $20.00 | $22.00 | 5% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 3,595 SY | $87.16 | $135 | $150 | 5% |
| 609E26000 CURB, TYPE 6 | 14,610 FT | $20.26 |
| Item | Quantity | R1John R Jurgensen Company | R2Prus Construction Company | R3Barrett Paving Materials INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $41,193 | $30,000 | $22,500 |
| 202E30000 WALK REMOVED | 10,825 SF | $1.98 | $2.00 | $4.50 |
| 202E32000 CURB REMOVED | 15,800 FT | $5.31 | $7.50 | $8.50 |
| 202E58000 MANHOLE REMOVED | 13 EACH | $692 | $1,800 | $1,250 |
| 202E58300 CATCH BASIN OR INLET REMOVED | 44 EACH | $561 | $850 | $1,000 |
| 202E98100 REMOVAL MISC.:BOULDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $24.00 |
| $18.00 |
| 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1291 CY | $216 | $241 | $240 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 994 CY | $236 | $265 | $255 | 4% |
| 611E04400 12" CONDUIT, TYPE B | 2,107 FT | $102 | $165 | $185 | 4% |
| 452E13040 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 1,921 SY | $109 | $138 | $103 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $400,000 | $400,000 | 3% |
| 608E12000 5" CONCRETE WALK | 24,859 SF | $7.82 | $10.00 | $6.75 | 3% |
| 611E99500 INLET, MISC.:CURB INLET | 65 EACH | $2,734 | $2,900 | $4,250 | 3% |
| 203E10000 EXCAVATION | 21,652 CY | $8.06 | $37.25 | $58.50 | 3% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:11" THICK, | 1,289 SY | $129 | $180 | $123 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 9,064 FT | $16.75 | $15.75 | $21.00 | 3% |
| 206E10500 CEMENT | 738 TON | $194 | $218 | $195 | 2% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 27,190 SY | $5.26 | $6.50 | $4.25 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,334 FT | $42.48 | $40.00 | $80.00 | 2% |
| 13 EACH |
| $524 |
| $300 |
| $100 |
| 202E98100 REMOVAL MISC.:CONCRETE FOUNDATION | 1 EACH | $655 | $1,500 | $125 |
| 202E98200 REMOVAL MISC.:ROCK EXCAVATION FOR CONDUIT INSTALLA | 750 FT | $74.01 | $31.00 | $35.00 |
| 202E98200 REMOVAL MISC.:TRENCH DRAIN | 142 FT | $18.44 | $23.00 | $9.50 |
| 202E98400 REMOVAL MISC.:REMOVE AND REINSTALL BRICK PAVERS | 476 SF | $19.20 | $50.00 | $18.25 |
| 202E98400 REMOVAL MISC.:REMOVE BRICK PAVERS | 91 SF | $15.70 | $6.25 | $1.25 |
| 203E20000 EMBANKMENT | 253 CY | $12.13 | $40.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 17,014 SY | $2.23 | $2.25 | $5.50 |
| 204E45000 PROOF ROLLING | 16 HOUR | $231 | $140 | $1,500 |
| 608E15000 8" CONCRETE WALK | 82 SF | $12.81 | $22.50 | $10.00 |
| 608E52000 CURB RAMP | 1,342 SF | $17.80 | $15.00 | $16.00 |
| 608E53020 DETECTABLE WARNING | 121 SF | $50.00 | $63.00 | $50.00 |
| 609E96000 MEDIAN, MISC.:DECORATIVE COLORED CONCRETE (5") | 30 SY | $151 | $264 | $135 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 105 TON | $95.70 | $125 | $100 |
| 206E11000 CURING COAT | 28,513 SY | $1.20 | $1.50 | $1.25 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $20,000 | $20,000 | $18,000 |
| 204E13000 EXCAVATION OF SUBGRADE (T=12") | 441 CY | $48.55 | $45.00 | $55.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C (T=12") | 441 CY | $69.09 | $92.00 | $80.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $168 | $150 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 14,890 SY | $1.08 | $1.20 | $1.08 |
| 659E20000 COMMERCIAL FERTILIZER | 1.34 TON | $900 | $1,000 | $900 |
| 659E31000 LIME | 3.08 ACRE | $75.00 | $84.00 | $75.00 |
| 659E35000 WATER | 0.08 MGAL | $100 | $100 | $100 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,925 | $3,500 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $18,960 | $25,000 | $45,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $18,957 | $22,000 | $20,000 |
| 832E30000 EROSION CONTROL | 135,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 500 FT | $39.05 | $57.00 | $45.00 |
| 611E04600 12" CONDUIT, TYPE C | 1,022 FT | $96.10 | $142 | $150 |
| 611E05900 15" CONDUIT, TYPE B | 233 FT | $108 | $200 | $190 |
| 611E06100 15" CONDUIT, TYPE C | 720 FT | $111 | $148 | $140 |
| 611E07400 18" CONDUIT, TYPE B | 410 FT | $126 | $243 | $240 |
| 611E07600 18" CONDUIT, TYPE C | 522 FT | $122 | $142 | $155 |
| 611E08900 21" CONDUIT, TYPE B | 45 FT | $185 | $341 | $330 |
| 611E97010 SLOTTED DRAIN, TYPE 2 (12") | 770 FT | $158 | $148 | $195 |
| 611E98150 CATCH BASIN, NO. 3 | 15 EACH | $3,576 | $5,950 | $6,000 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 9 EACH | $6,057 | $8,750 | $10,500 |
| 611E98180 CATCH BASIN, NO. 3A | 35 EACH | $2,785 | $4,725 | $4,750 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 19 EACH | $5,137 | $6,900 | $8,250 |
| 611E98370 CATCH BASIN, NO. 6 | 6 EACH | $3,638 | $5,250 | $5,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 7 EACH | $1,511 | $3,750 | $2,500 |
| 611E99574 MANHOLE, NO. 3 | 18 EACH | $3,787 | $6,500 | $6,500 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $14,814 | $21,000 | $21,000 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $20,472 | $25,000 | $36,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $980 | $935 | $1,200 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $1,175 | $4,000 | $2,750 |
| 839E30100 TRENCH DRAIN, TYPE B WITH PEDESTRIAN GRATE | 181 FT | $198 | $245 | $160 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $40,255 | $55,750 | $35,000 |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $53,884 | $73,450 | $65,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,850 FT | $1.65 | $3.75 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 3,374 GAL | $5.00 | $5.50 | $4.25 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $735 | $770 | $900 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (66 CY | $645 | $835 | $650 |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.:9" THICK, | 261 SY | $111 | $205 | $103 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 370 FT | $58.66 | $63.50 | $55.00 |
| 609E14001 CURB, TYPE 2-A, AS PER PLAN | 980 FT | $13.47 | $21.00 | $10.00 |
| 609E33000 CURB, TYPE 10 | 961 FT | $33.52 | $46.50 | $28.00 |
| 900E17000 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $67,298 | $24,000 | $100,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, CINCINNATI S | 20 CY | $33.15 | $50.00 | $5.00 |
| 511E71100 CONCRETE, MISC.:CONCRETE, CLASS C, CINCINNATI SPEC | 18 CY | $506 | $250 | $150 |
| 513E90000 STRUCTURAL STEEL, MISC.:REINFORCING STEEL, CINCINN | 2,680 LB | $1.92 | $1.00 | $1.50 |
| 602E10000 BRICK MASONRY, CINCINNATI SPEC 602 | 1 CY | $1,237 | $350 | $1.00 |
| 638E98000 WATER WORK, MISC.:ADJUST EXISTING VAVLE CHAMBER TO | 4 EACH | $804 | $900 | $350 |
| 638E98000 WATER WORK, MISC.:FURNISHING AND INSTALLING CURB A | 5 EACH | $644 | $300 | $270 |
| 638E98000 WATER WORK, MISC.:FURNISHING AND INSTALLING FIRE H | 1 EACH | $1,532 | $600 | $1,148 |
| 638E98000 WATER WORK, MISC.:HAULING AND INSTALLING FIRE HYDR | 1 EACH | $1,490 | $2,500 | $920 |
| 638E98000 WATER WORK, MISC.:REMOVING FIRE HYDRANT, CINCINNAT | 1 EACH | $495 | $850 | $75.00 |
| 638E98000 WATER WORK, MISC.:RESETTING EXISTING CURB AND ROAD | 8 EACH | $651 | $345 | $75.00 |
| 638E98000 WATER WORK, MISC.:RESETTING EXISTING VALVE BOXES C | 10 EACH | $813 | $535 | $75.00 |
| 638E98000 WATER WORK, MISC.:SHEETING AND BRACING ORDERED LEF | 1 EACH | $1,114 | $0.02 | $1.00 |
| 638E98600 WATER WORK, MISC.:CHANGING 10" AND UNDER PIPE SEWE | 50 FT | $70.38 | $50.00 | $25.00 |
| 638E98600 WATER WORK, MISC.:CHANGING 8" AND UNDER PIPE SEWER | 50 FT | $69.67 | $50.00 | $25.00 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND INSTALLING 1" COP | 96 FT | $83.54 | $190 | $135 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND INSTALLING 2" COP | 296 FT | $111 | $250 | $172 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND INSTALLING 3/4" C | 100 FT | $78.69 | $187 | $130 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND LAYING 12" DUCTIL | 44 FT | $524 | $800 | $555 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND LAYING 6" DUCTILE | 188 FT | $254 | $370 | $422 |
| 638E98600 WATER WORK, MISC.:FURNISHING AND LAYING 8" DUCTILE | 175 FT | $365 | $480 | $435 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 20 EACH | $1,072 | $1,150 | $1,200 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $155 | $173 | $155 |
| 625E31600 PULL BOX, MISC.:PULLBOX ADJUSTED TO GRADE | 3 EACH | $250 | $280 | $250 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 3 EACH | $594 | $1,220 | $750 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 699 FT | $12.00 | $19.00 | $12.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 40 FT | $15.00 | $17.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $41.00 | $45.00 | $41.00 |
| 630E80100 SIGN, FLAT SHEET | 200 SF | $17.35 | $19.50 | $17.35 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 11 EACH | $75.00 | $84.00 | $75.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 21 EACH | $15.00 | $17.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 15 EACH | $60.00 | $68.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 28 EACH | $30.00 | $33.50 | $30.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 7 EACH | $35.00 | $39.00 | $35.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 14 EACH | $15.00 | $17.00 | $15.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 4 EACH | $135 | $150 | $135 |
| 630E89704 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $1,050 | $2,750 | $1,050 |
| 644E00200 LANE LINE, 4" | 1.66 MILE | $3,950 | $3,000 | $2,668 |
| 644E00300 CENTER LINE | 0.01 MILE | $23,995 | $33,000 | $30,008 |
| 644E00400 CHANNELIZING LINE, 8" | 1,865 FT | $1.55 | $2.80 | $2.50 |
| 644E00500 STOP LINE | 361 FT | $5.60 | $9.00 | $8.00 |
| 644E00620 CROSSWALK LINE, 12" | 1,460 FT | $5.00 | $4.50 | $4.00 |
| 644E01300 LANE ARROW | 31 EACH | $125 | $150 | $135 |
| 644E01500 DOTTED LINE, 4" | 110 FT | $1.45 | $4.50 | $4.00 |
| 644E01514 DOTTED LINE, 8" | 257 FT | $1.50 | $4.50 | $4.00 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 2 EACH | $1,110 | $1,250 | $1,110 |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 803 FT | $2.00 | $2.25 | $2.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 360 FT | $1.85 | $2.00 | $1.85 |
| 625E25408 CONDUIT, 2", 725.051 | 79 FT | $4.40 | $5.00 | $4.40 |
| 625E25604 CONDUIT, 4", 725.051 | 86 FT | $10.00 | $11.00 | $10.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 212 FT | $80.00 | $90.00 | $80.00 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I | 2 EACH | $560 | $627 | $560 |
| 625E29002 TRENCH, 24" DEEP | 159 FT | $12.50 | $14.00 | $12.50 |
| 625E30706 PULL BOX, 725.08, 24" | 7 EACH | $1,220 | $1,365 | $1,220 |
| 625E32000 GROUND ROD | 6 EACH | $465 | $520 | $465 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 8 EACH | $317 | $355 | $317 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $116 | $130 | $116 |
| 630E80100 SIGN, FLAT SHEET | 77 SF | $21.99 | $25.00 | $21.99 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $1,160 | $1,300 | $1,160 |
| 632E05065 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 2 EACH | $1,400 | $1,575 | $1,400 |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 4 EACH | $675 | $755 | $675 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 10 EACH | $75.00 | $84.00 | $75.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 4 EACH | $75.00 | $84.00 | $75.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $280 | $312 | $280 |
| 632E30980 SIGNAL CABLE, 3 CONDUCTOR, NO. 10 AWG | 511 FT | $1.95 | $2.20 | $1.95 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 531 FT | $2.20 | $2.50 | $2.20 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,896 FT | $2.50 | $2.80 | $2.50 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 3 EACH | $6,980 | $7,800 | $6,980 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 2 EACH | $1,750 | $1,960 | $1,750 |
| 632E66102 POWER CABLE, 2 CONDUCTOR, NO. 10 AWG | 152 FT | $3.65 | $4.00 | $3.65 |
| 632E70000 POWER SERVICE | 1 EACH | $5,685 | $6,400 | $5,685 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $1,265 | $1,500 | $1,265 |
| 632E78493 COMBINATION SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 1 | 1 EACH | $31,425 | $35,000 | $31,425 |
| 632E72141 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13, AS PER P | 1 EACH | $19,195 | $21,500 | $19,195 |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $25,385 | $28,500 | $25,385 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 2 EACH | $1,160 | $1,300 | $1,160 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, SIGN | 1 EACH | $2,500 | $2,800 | $2,500 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $5,000 | $5,600 | $5,000 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $17,400 | $19,500 | $17,400 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,750 | $1,960 | $1,750 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $950 | $1,064 | $950 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $9,660 | $10,900 | $9,660 |
| 804E32011 DROP CABLE, 12 FIBER, AS PER PLAN | 211 EACH | $16.60 | $18.50 | $16.60 |
| 804E34012 FIBER TERMINATION PANEL, 12 FIBER | 1 EACH | $1,800 | $2,000 | $1,800 |
| 809E65990 ITS DEVICE, MISC.:INTERGRATION INTO EXISTING CENTR | 1 EACH | $7,500 | $8,400 | $7,500 |
| 809E65990 ITS DEVICE, MISC.:MANAGED ETHERNET SWITCH WITH GIG | 1 EACH | $3,500 | $3,920 | $3,500 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $10,200 | $11,425 | $10,200 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $6,670 | $7,500 | $6,670 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $773 | $1,125 | $600 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $92.93 | $105 | $85.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $172 | $350 | $449 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $950 | $1,065 | $950 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.32 MILE | $290 | $3,105 | $2,773 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.66 MILE | $1,746 | $6,950 | $6,200 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 5.1 MILE | $1,280 | $3,500 | $3,100 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 3,613 FT | $1.05 | $1.40 | $1.25 |
| 614E24208 WORK ZONE DOTTED LINE, CLASS I, 12", 642 PAINT | 1,494 FT | $1.00 | $1.15 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 471 FT | $4.25 | $5.50 | $5.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 80 FT | $4.00 | $2.80 | $2.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 23 EACH | $100 | $56.00 | $50.00 |
| 616E10000 WATER | 160 MGAL | $100 | $30.00 | $50.00 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.66 MILE | $275 | $1,760 | $3,860 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.01 MILE | $1,725 | $28,000 | $25,000 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,865 FT | $0.90 | $1.40 | $1.25 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 110 FT | $0.80 | $1.15 | $1.00 |
| 614E24614 WORK ZONE DOTTED LINE, CLASS III, 8", 642 PAINT | 257 FT | $0.85 | $1.15 | $1.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 31 EACH | $75.00 | $39.00 | $35.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,732 | $125,000 | $35,149 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 24 MNTH | $2,652 | $4,000 | $2,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $24,909 | $215,000 | $115,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), PG64-22 | 5,813 CY | $167 | $971k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $846,918 | $847k | 10% |
| 661E99940 PLANTING, MISC.:MEDIAN LANDSCAPING | 1 LS | $452,700 | $453k | 5% |
| 304E20000 AGGREGATE BASE | 5,479 CY | $72.26 | $396k | 5% |
| 202E23000 PAVEMENT REMOVED | 29,055 SY | $11.38 | $331k | 4% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 3,595 SY | $87.16 | $313k | 4% |
| 609E26000 CURB, TYPE 6 | 14,610 FT | $20.26 | $296k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1291 CY | $216 | $279k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 994 CY | $236 | $235k | 3% |
| 611E04400 12" CONDUIT, TYPE B | 2,107 FT | $102.49 | $216k | 2% |