How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
5%
408E10000PRIME COAT
6,726 GAL
$4.25
$6.00
$8.00
$7.00
5%
624E10000MOBILIZATION
1 LS
$20,000
$20,000
$20,000
$50,000
3%
203E10000EXCAVATION
300 CY
$60.00
$60.00
$30.00
$30.00
3%
253E01001PAVEMENT REPAIR, AS PER PLAN
40 SY
$325
$80.00
$100
$220
2%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,000
$6,000
$10,000
$10,000
1%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$5,000
$6,000
$1,000
$1,500
1%
832E30000EROSION CONTROL
3,000 EACH
$1.00
$1.00
$1.00
$1.00
0%
407E20000NON-TRACKING TACK COAT
1,010 GAL
$2.50
$5.20
$7.00
$3.25
0%
254E01001PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 2
55 SY
$24.62
$100
$8.00
$4.50
0%
13%
Top items by winning bid
Item
Qty
Unit price
Extended
%
441E70101ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS
700 CY
$240
$168k
28%
441E70200ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1