PUT-SR 65-01.08
PUT County · est $2.4M
Bid dateThursday, May 23—
PUT County · est $2.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 137 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Advanced Excavating & Demolition LLC | % of bid |
|---|---|---|---|---|
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,456 CY | $100 | $74.50 | 13% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,143 CY | $210 | $212 | 13% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 5,567 FT | $26.00 | $14.25 | 8% |
| 442E10081 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 560 CY | $245 | $300 | 7% |
| 304E20000 AGGREGATE BASE | 1,197 CY | $110 | $90.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $150,000 | 7% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 480 CY | $260 | $300 | 7% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,620 FT | $74.00 | $70.00 | 6% |
| 203E10000 EXCAVATION | 3,411 CY | $35.00 | $25.00 | 6% |
| 202E23000 PAVEMENT REMOVED | 4,097 SY | $20.00 | $20.00 | 4% |
| 611E04600 12" CONDUIT, TYPE C | 627 FT | $110 | $135 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $200,000 | 3% |
| 203E20000 EMBANKMENT | 1,581 CY | $30.00 | $35.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $42,000 | $50,000 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,718 | $9,750 | 2% |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 207 TON | $185 | $145 | 2% |
| 608E52000 CURB RAMP | 1,525 SF | $25.00 | $14.00 | 2% |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $12,500 | $4,000 | 2% |
| 442E22301 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 145 CY | $245 | $300 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 234 FT | $150 | $200 | 2% |
| Item | Quantity | R1Vernon Nagel INC | R2Advanced Excavating & Demolition LLC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $40,000 |
| 202E30000 WALK REMOVED | 2,860 SF | $5.00 | $2.00 |
| 202E32000 CURB REMOVED | 440 FT | $5.00 | $6.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 444 FT | $20.00 | $30.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 25 FT | $30.00 | $35.00 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $350 | $1,500 |
| 203E98000 ROADWAY, MISC.:DECORATIVE ROCK | 11 CY | $400 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $450 |
| 204E10000 SUBGRADE COMPACTION | 7,225 SY | $2.00 | $2.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $250 | $2,000 |
| 204E50000 GEOTEXTILE FABRIC | 3,709 SY | $1.30 | $4.00 |
| 204E51000 GEOGRID | 3,657 SY | $2.25 | $3.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 100 FT | $85.00 | $40.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $4,100 | $2,825 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $2,450 | $1,500 |
| 607E98000 FENCE, MISC.: PAINTED RAILING | 56 FT | $125 | $140 |
| 608E10000 4" CONCRETE WALK | 2,892 SF | $12.00 | $12.00 |
| 608E13000 6" CONCRETE WALK | 313 SF | $15.00 | $14.00 |
| 623E38550 MONUMENT ASSEMBLY, TYPE D | 7 EACH | $800 | $1,100 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 11 EACH | $800 | $675 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $2,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $2,500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 6 SY | $150 | $200 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 3 SY | $200 | $300 |
| 659E00300 TOPSOIL | 824 CY | $35.00 | $42.00 |
| 659E10000 SEEDING AND MULCHING | 7,421 SY | $3.50 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 371 SY | $0.88 | $1.00 |
| 659E15000 INTER-SEEDING | 371 SY | $0.50 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1 TON | $850 | $1,000 |
| 659E31000 LIME | 1.53 ACRE | $35.00 | $50.00 |
| 659E35000 WATER | 21 MGAL | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 291 SY | $1.80 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,500 | $9,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,500 | $8,500 |
| 832E30000 EROSION CONTROL | 34,000 EACH | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 740 FT | $24.00 | $16.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 218 FT | $60.00 | $80.00 |
| 611E04900 12" CONDUIT, TYPE D | 86 FT | $160 | $135 |
| 611E16600 36" CONDUIT, TYPE C, 706.01 | 20 FT | $600 | $610 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $10,000 | $4,300 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $6,500 | $3,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 5 EACH | $3,500 | $3,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $2,500 | $1,600 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 10 EACH | $1,500 | $1,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,000 | $1,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $350 | $900 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, "3.0" PAVEMENT | 4,913 SY | $3.90 | $7.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,824 GAL | $2.50 | $3.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $500 | $726 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (2 CY | $500 | $950 |
| 452E09010 4" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 23 SY | $130 | $85.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 8 SY | $175 | $130 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 167 SY | $200 | $120 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 650 FT | $45.00 | $50.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 184 FT | $45.00 | $50.00 |
| 609E26000 CURB, TYPE 6 | 226 FT | $42.00 | $38.00 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 2 EACH | $2,500 | $2,800 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $500 | $800 |
| 625E00450 CONNECTION, FUSED PULL APART | 8 EACH | $230 | $230 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 6 EACH | $201 | $205 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 4 EACH | $575 | $600 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 1,275 FT | $5.46 | $5.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 484 FT | $2.93 | $3.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 4 EACH | $636 | $650 |
| 632E62810 INTERCONNECT CABLE, MISC.: 6 PAIR, NO. 19 AWG, SOL | 203 FT | $4.60 | $5.00 |
| 621E00100 RPM | 35 EACH | $158 | $158 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 20 EACH | $34.82 | $30.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 419 FT | $14.00 | $20.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 13 FT | $14.00 | $22.00 |
| 630E08600 SIGN POST REFLECTOR | 18 EACH | $45.00 | $45.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $125 | $225 |
| 630E80100 SIGN, FLAT SHEET | 151 SF | $25.00 | $23.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 5 EACH | $150 | $195 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 20 EACH | $20.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 9 EACH | $75.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 21 EACH | $20.00 | $15.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 4 EACH | $100 | $115 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 1 EACH | $265 | $1,275 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.62 MILE | $2,000 | $2,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.54 MILE | $3,000 | $3,000 |
| 644E00400 CHANNELIZING LINE, 8" | 936 FT | $2.00 | $2.00 |
| 644E00500 STOP LINE | 183 FT | $7.00 | $7.00 |
| 644E00620 CROSSWALK LINE, 12" | 181 FT | $4.00 | $4.00 |
| 644E00630 CROSSWALK LINE, 24" | 339 FT | $6.00 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 206 FT | $7.00 | $7.00 |
| 644E00900 ISLAND MARKING | 93 SF | $6.00 | $6.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $650 | $650 |
| 644E01300 LANE ARROW | 25 EACH | $100 | $100 |
| 644E01500 DOTTED LINE, 4" | 112 FT | $2.00 | $2.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 375 FT | $10.00 | $10.00 |
| 625E25304 CONDUIT, 1-1/2", 725.051 | 96 FT | $10.35 | $10.50 |
| 625E25504 CONDUIT, 3", 725.051 | 274 FT | $8.05 | $8.25 |
| 625E25604 CONDUIT, 4", 725.051 | 266 FT | $11.50 | $11.50 |
| 625E29002 TRENCH, 24" DEEP | 621 FT | $8.63 | $9.00 |
| 625E30706 PULL BOX, 725.08, 24" | 6 EACH | $1,202 | $1,205 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $1,163 | $1,165 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,984 | $1,985 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $620 | $620 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 9 EACH | $28.75 | $30.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $28.75 | $30.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $374 | $375 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 431 FT | $3.16 | $3.25 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,327 FT | $3.45 | $3.50 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,600 | $5,000 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,265 | $1,275 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 45 FT | $4.36 | $4.50 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 27 FT | $4.36 | $4.50 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,750 | $5,750 |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 4 EACH | $1,495 | $1,500 |
| 632E89700 PEDESTAL, 11' | 1 EACH | $1,088 | $1,100 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $8,050 | $8,100 |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $16,207 | $16,500 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,840 | $1,900 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,035 | $1,100 |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN, 1 | 1 EACH | $7,705 | $7,750 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $10,063 | $10,100 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $7,414 | $7,500 |
| 819E10000 RAILROAD PREEMPTION INTERFACE | — | $6,534 | $6,600 |
| 828E00100 LED BLANKOUT SIGN (NO LEFT TURN, 24"X24"X5.5") | 2 EACH | $3,611 | $3,650 |
| 828E00100 LED BLANKOUT SIGN (NO RIGHT TURN, 24"X24"X5.5") | 1 EACH | $3,637 | $3,650 |
| 828E00100 LED BLANKOUT SIGN (NO TURNS TRAIN, 24"X30"X5.5") | 1 EACH | $5,935 | $6,000 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $20,700 | $25,000 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,500 | $4,500 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $65.00 | $65.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 33 EACH | $10.00 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 33 EACH | $20.00 | $20.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 1.04 MILE | $14,000 | $14,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 2 MILE | $9,000 | $9,000 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 279 FT | $3.00 | $3.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 96 FT | $5.00 | $5.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 6 EACH | $100 | $100 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 88 SY | $225 | $225 |
| 616E10000 WATER | 12 MGAL | $10.00 | $200 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $16,500 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $50,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,456 CY | $100 | $246k | 9% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,143 CY | $210 | $240k | 9% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 5,567 FT | $26 | $145k | 5% |
| 442E10081 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 560 CY | $245 | $137k | 5% |
| 304E20000 AGGREGATE BASE | 1,197 CY | $110 | $132k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $125k | 4% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 480 CY | $260 | $125k | 4% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,620 FT | $74 | $120k | 4% |
| 203E10000 EXCAVATION | 3,411 CY | $35 | $119k | 4% |
| 202E23000 PAVEMENT REMOVED | 4,097 SY | $20 | $82k | 3% |