STA-SR 43/SR 172-14.40/VAR
STA County · est $4.0M
Bid dateThursday, June 13—
STA County · est $4.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (4745 CY | $180 | $170 | 25% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (3294 CY | $225 | $240 | 21% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 151,462 SY | $3.00 | $2.50 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $248,442 | $349,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $217,000 | $100,000 | 6% |
| 608E52000 CURB RAMP | 12,651 SF | $12.00 | $17.00 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 378 CY | $300 | $450 | 3% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 39 EACH | $2,500 | $2,850 | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 52 EACH | $1,750 | $1,750 | 3% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 950 SY | $75.00 | $300 | 2% |
| 202E30000 WALK REMOVED | 17,601 SF | $4.00 | $5.00 | 2% |
| AA2 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN (ALTERNATE | 8 EACH | $8,550 | $8,550 | 2% |
| 407E13900 TACK COAT, 702.13 | 21,703 GAL | $2.75 | $4.50 | 2% |
| 608E10000 4" CONCRETE WALK | 4,760 SF | $8.00 | $12.00 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 24 EACH | $1,500 | $1,500 | 1% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $35.00 | $75.00 | 1% |
| AB2 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN (ALTERNATE | 4 EACH | $8,550 | $8,550 | 1% |
| 202E32000 CURB REMOVED | 1,092 FT | $30.00 | $15.00 | 1% |
| 609E26000 CURB, TYPE 6 | 562 FT | $50.00 | $36.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 14 MNTH | $2,000 | $3,000 | 1% |
| Item | Quantity | R1Karvo Companies INC | R2Shelly Company |
|---|---|---|---|
| 202E32500 CURB AND GUTTER REMOVED | 510 FT | $25.00 | $16.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 159 CY | $10.00 | $36.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 15 EACH | $1,600 | $1,600 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $575 | $9,000 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 5 EACH | $3,500 | $3,500 |
| 611E99154 INLET RECONSTRUCTED TO GRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5 EACH |
| $3,500 |
| $3,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 5 EACH | $2,200 | $2,200 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 24,300 LB | $0.50 | $2.60 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 5,700 FT | $4.00 | $4.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1") | 1 SY | $5.00 | $2.50 |
| 254E01600 PATCHING PLANED SURFACE | 5,000 SY | $0.10 | $4.50 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 159 CY | $20.00 | $60.00 |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (5 CY | $180 | $170 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 22 SY | $75.00 | $100 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 255 FT | $45.00 | $67.00 |
| 646E10010 EDGE LINE, 6" | 0.93 MILE | $3,750 | $3,750 |
| 646E10110 LANE LINE, 6" | 8.76 MILE | $2,350 | $2,350 |
| 646E10200 CENTER LINE | 5.27 MILE | $4,200 | $4,200 |
| 646E10310 CHANNELIZING LINE, 12" | 4,936 FT | $2.65 | $2.65 |
| 646E10400 STOP LINE | 1,000 FT | $13.00 | $13.00 |
| 646E10520 CROSSWALK LINE, 24" | 1,966 FT | $12.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,491 FT | $9.00 | $9.00 |
| 646E10800 ISLAND MARKING | 341 SF | $6.00 | $6.00 |
| 646E20300 LANE ARROW | 79 EACH | $160 | $160 |
| 646E20370 TWO WAY LEFT TURN ARROW | 10 EACH | $150 | $150 |
| 646E20400 WORD ON PAVEMENT, 72" | 1 EACH | $222 | $222 |
| 646E20504 DOTTED LINE, 6" | 243 FT | $4.75 | $4.75 |
| 646E20600 BIKE LANE SYMBOL MARKING | 17 EACH | $150 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 1 EACH | $55.00 | $55.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 17.52 MILE | $640 | $640 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 8.76 MILE | $620 | $620 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 10.54 MILE | $1,375 | $1,375 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.27 MILE | $1,175 | $1,175 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.93 MILE | $800 | $800 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 9,872 FT | $0.69 | $0.70 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 4,936 FT | $0.67 | $0.70 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 2,000 FT | $3.10 | $3.10 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,000 FT | $3.00 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (4745 CY | $180 | $854k | 22% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (3294 CY | $225 | $741k | 19% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 151,462 SY | $3 | $454k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $248,442 | $248k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $217,000 | $217k | 6% |
| 608E52000 CURB RAMP | 12,651 SF | $12 | $152k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 378 CY | $300 | $113k | 3% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 39 EACH | $2,500 | $98k | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 52 EACH | $1,750 | $91k | 2% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 950 SY | $75 | $71k | 2% |