LAK-SR 44-04.14
LAK County · est $2.8M
Bid dateThursday, June 27—
LAK County · est $2.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC | % of bid |
|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,932 CY | $235 | $279 | $258 | 46% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $445,000 | $193,400 | $239,035 | 15% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 159,893 SY | $2.10 | $1.75 | $1.75 | 11% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 768 CY | $275 | $330 | $300 | 7% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 276 SY | $365 | $365 | $350 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $160,250 | $238,891 | 3% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 15.39 MILE |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 25 CY | $40.00 | $40.00 | $20.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 4,952 FT | $2.50 | $2.00 | $5.00 |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 14 SY | $340 | $340 | $350 |
| 304E20000 AGGREGATE BASE | 25 CY | $65.00 | $65.00 | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4,250 |
| $4,250 |
| $5,200 |
| 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,098 CY | $9.00 | $0.50 | $10.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,827 GAL | $3.00 | $2.75 | $2.75 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,000 | $2,000 | $2,350 | 1% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 118 CY | $300 | $425 | $375 | 1% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 548 STA | $60.00 | $75.00 | $45.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 30 SNMT | $1,081 | $875 | $900 | 1% |
| 621E00100 RPM | 528 EACH | $53.80 | $53.80 | $48.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $13,000 | $25,000 | 1% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 5,524 FT | $3.10 | $3.10 | $3.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $100 | $110 | $100 | 0% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $2,500 | $2,750 | $2,000 | 0% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 2,757 SY | $5.25 | $6.50 | $6.00 | 0% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 15.37 MILE | $900 | $900 | $790 | 0% |
| 171 CY |
| $75.00 |
| $75.00 |
| $174 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 10.38 MILE | $1,315 | $1,315 | $1,315 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.10 | $1.00 | $1.08 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.70 | $1.50 | $1.66 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,000 | $5,000 | $4,444 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 396 EACH | $5.00 | $4.00 | $1.00 |
| 646E10400 STOP LINE | 342 FT | $12.50 | $12.50 | $12.25 |
| 646E10510 CROSSWALK LINE, 12" | 324 FT | $12.50 | $12.50 | $6.00 |
| 646E10620 CHEVRON MARKING | 195 FT | $12.50 | $12.50 | $12.00 |
| 646E20300 LANE ARROW | 40 EACH | $175 | $175 | $159 |
| 646E20320 WRONG WAY ARROW | 6 EACH | $225 | $225 | $245 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 6.11 MILE | $2,250 | $2,250 | $3,000 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 3,908 FT | $2.50 | $2.50 | $2.70 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 1,199 FT | $1.70 | $2.00 | $1.68 |
| 646E10300 CHANNELIZING LINE, 8" | 514 FT | $3.00 | $3.00 | $1.55 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 6 EACH | $250 | $175 | $175 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 50 CY | $145 | $125 | $100 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 6.12 MILE | $700 | $700 | $525 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 6.12 MILE | $650 | $650 | $524 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 15.37 MILE | $900 | $900 | $750 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 4,422 FT | $0.70 | $0.75 | $0.69 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 4,422 FT | $0.70 | $0.75 | $0.68 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,199 FT | $0.60 | $0.50 | $0.58 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,199 FT | $0.60 | $0.50 | $0.57 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 342 FT | $3.40 | $3.00 | $3.33 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 342 FT | $3.10 | $3.00 | $3.11 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 324 FT | $1.35 | $3.00 | $1.33 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 324 FT | $1.20 | $3.00 | $1.22 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 40 EACH | $75.00 | $75.00 | $48.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 40 EACH | $75.00 | $75.00 | $45.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $23.91 | $27.50 | $27.50 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 18 SNMT | $664 | $650 | $650 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $5,000 | $1,000 | $2,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,000 | $6,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,932 CY | $235 | $1.39M | 44% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $445,000 | $445k | 14% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 159,893 SY | $2.1 | $336k | 11% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 768 CY | $275 | $211k | 7% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 276 SY | $365 | $101k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 15.39 MILE | $4,250 | $65k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,098 CY | $9 | $46k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 13,827 GAL | $3 | $41k | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,000 | $41k | 1% |