COS-CR 12-09.26 Buggy Lane
COS County · est $0.2M
Bid dateThursday, July 25—
COS County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Protect-a-cote | R2Rietschlin Construction INC | R3Madex Construction CO | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 74 CY | $400 | $238 | $250 | $300 | 17% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 342 FT | $48.00 | $42.00 | $48.31 | $60.75 | 9% |
| 611E04400 12" CONDUIT, TYPE B | 320 FT | $50.00 | $65.00 | $121 | $79.50 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 16 CY | $800 | $728 | $765 | $465 | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (22 CY | $500 | $509 | $535 | $450 | 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 218 CY | $50.00 | $40.00 | $33.88 | $43.75 |
| Item | Quantity | R1Protect-a-cote | R2Rietschlin Construction INC | R3Madex Construction CO | R4Shelly Company |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 122 SY | $7.00 | $26.00 | $69.11 | $33.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 314 FT | $5.00 | $18.00 | $12.93 | $33.00 |
| 203E20000 EMBANKMENT | 15 CY | $14.00 | $94.00 | $53.71 | $97.50 |
| 204E10000 SUBGRADE COMPACTION | 442 SY | $3.00 | $3.00 | $4.66 | $2.25 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 218 CY | $40.00 | $85.00 | $106 | $81.50 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,000 | $1,800 | $1,647 | $6,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,000 | $26,000 | $6,716 | $65,000 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $4,100 | $12,158 | $5,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $16,000 | $19,669 | $13,250 | 4% |
| 203E10000 EXCAVATION | 129 CY | $50.00 | $48.00 | $37.44 | $53.75 | 4% |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $2,000 | $660 | $1,354 | $690 | 3% |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,000 | $4,200 | $3,185 | $2,900 | 3% |
| 304E20000 AGGREGATE BASE | 80 CY | $55.00 | $145 | $113 | $120 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,000 | $1,400 | $824 | $2,650 | 2% |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,000 | $4,600 | $3,301 | $2,675 | 2% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,000 | $4,600 | $4,759 | $2,975 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $500 | $238 | $218 | $600 | 1% |
| 659E00300 TOPSOIL | 24 CY | $100 | $79.00 | $78.53 | $275 | 1% |
| $165 |
| $151 |
| $125 |
| 659E10000 SEEDING AND MULCHING | 219 SY | $5.00 | $13.25 | $9.27 | $18.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11 SY | $30.00 | $13.25 | $6.84 | $3.80 |
| 659E15000 INTER-SEEDING | 11 SY | $100 | $13.25 | $6.84 | $3.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $2,000 | $1,400 | $4,471 | $949 |
| 659E31000 LIME | 0.05 ACRE | $2,000 | $220 | $1,878 | $153 |
| 659E35000 WATER | 1 MGAL | $25.00 | $1.00 | $32.45 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS | 50 FT | $25.00 | $26.00 | $19.49 | $58.00 |
| 407E10000 TACK COAT | 53 GAL | $5.00 | $4.00 | $3.47 | $2.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 43 FT | $18.00 | $20.00 | $15.39 | $17.80 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $105 | $116 | $126 | $105 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $67.00 | $74.00 | $78.65 | $66.75 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $267 | $294 | $134 | $267 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.14 MILE | $7,385 | $8,200 | $2,895 | $7,385 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $14,765 | $16,300 | $4,053 | $14,765 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 5 CY | $300 | $125 | $115 | $500 |
| 616E10000 WATER | 1 MGAL | $25.00 | $11.00 | $37.63 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $4,500 | $5,789 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 74 CY | $400 | $30k | 15% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 342 FT | $48 | $16k | 9% |
| 611E04400 12" CONDUIT, TYPE B | 320 FT | $50 | $16k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 16 CY | $800 | $13k | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (22 CY | $500 | $11k | 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 218 CY | $50 | $11k | 6% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 218 CY | $40 | $9k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,000 | $8k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,000 | $8k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $7k | 4% |