202E35601PIPE REMOVED FOR REUSE, OVER 24", AS PER PLAN, REM
6 FT
$475
202E38001GUARDRAIL REMOVED, AS PER PLAN
2,912.5 FT
$2.00
202E42001ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN
12 EACH
$350
202E42011ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN
13 EACH
$175
209E60200LINEAR GRADING
51.6 STA
$120
606E15150GUARDRAIL, TYPE MGS HALF POST SPACING
50 FT
$30.00
606E25550ANCHOR ASSEMBLY, MGS TYPE A
1 EACH
$1,750
606E26050ANCHOR ASSEMBLY, MGS TYPE B
1 EACH
$2,200
606E26550ANCHOR ASSEMBLY, MGS TYPE T
Project details
Description
UNI-SR 38-00.30
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
2 EACH
$1,150
606E35141BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN