Figure 0.1 · BRIEFING BID #240457 · ODOT RESULT · awarded Oct 17 ALL-IR 75/SR 117/SR 309-VAR. ALL County · est $2.6M
Bid date Thursday, October 17 —
Project scope Bid form · ODOT
57 ITEMS Asphalt Paving 23% Pavement Marking 18% Maintaining Traffic 14% Structures / Bridge 9% Erosion & Landscaping 7% Curb, Walk & Ramp 5% Item Quantity R1 Shelly Company % of bid 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( 2,665 CY $260 27% 856E10000 BRIDGE DECK WATERPROOFING ASPHALT CONCRETE 688 CY $500 13% 856E10000 BRIDGE DECK WATERPROOFING ASPHALT CONCRETE 427 CY $550 9% 856E10000 BRIDGE DECK WATERPROOFING ASPHALT CONCRETE 359 CY $600 8% 614E11000 MAINTAINING TRAFFIC 1 LS $200,000 8% 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( 305 CY $360 4% 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 449 (300 CY $350 4% 624E10000 MOBILIZATION 1 LS $100,000 4% 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 449 (222 CY $375 3% 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 449 (196 CY $400 3% 253E02000 PAVEMENT REPAIR 150 CY $500 3% 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" THICKNESS 35,690 SY $2.00 3% 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" THICKNES 24,701 SY $2.50 2% 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V 5,398 SY $8.00 2% 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V 4,008 SY $9.00 1% 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V 3,520 SY $10.00 1% 202E23500 WEARING COURSE REMOVED 6,310 SY $5.25 1% 608E52000 CURB RAMP 1,052 SF $29.00 1% 621E00100 RPM 469 EACH $48.50 1% 617E10101 COMPACTED AGGREGATE, AS PER PLAN 160 CY $130 1%
Show all 57 line items Item Quantity R1 Shelly Company 202E30000 WALK REMOVED 1,009 SF $5.00 202E32500 CURB AND GUTTER REMOVED 25 FT $14.00 659E00300 TOPSOIL 2 CY $150 659E10000 SEEDING AND MULCHING 30 SY $10.00 659E20000 COMMERCIAL FERTILIZER 0.16 TON $1,500 659E35000 WATER 0.2 MGAL $50.00 832E30000 EROSION CONTROL 1,000 EACH $1.00 254E01600 PATCHING PLANED SURFACE 1,198 SY $9.00 304E20000 AGGREGATE BASE 20 CY $130
Project details
Description ALL-IR 75/SR 117/SR 309-VAR.
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →