ATH-SR 682-06.07 Roundabout
ATH County
Bid dateThursday, October 31—
ATH County
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 159 more items below.
| Item | Quantity | R1D G M INC | R2Miller Bros Const INC | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Allard Excavation LLC | R6Alan Stone CO INC | R7Axis Civil Construction LLC | R8Complete General Construction Company | R9Trucco Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,535 CY | $220 | $214 | $220 | $215 | $214 | $300 | $230 | $220 | $214 | 16% |
| 203E20000 EMBANKMENT | 31,570 CY | $16.80 |
| Item | Quantity | R1D G M INC | R2Miller Bros Const INC | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Allard Excavation LLC | R6Alan Stone CO INC | R7Axis Civil Construction LLC | R8Complete General Construction Company | R9Trucco Construction CO INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $75,000 | $119,000 | $30,000 | $39,942 | $45,000 | $30,000 | $100,000 | $75,490 |
| 202E30000 WALK REMOVED | 211 SF | $8.00 | $2.50 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $20.00 |
| $23.50 |
| $25.00 |
| $24.00 |
| $24.00 |
| $31.00 |
| $36.00 |
| $40.75 |
| 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $358,000 | $169,400 | $228,000 | $186,028 | $209,386 | $157,000 | $140,000 | $200,000 | $250,000 | 10% |
| 304E20000 AGGREGATE BASE | 2,371 CY | $110 | $95.00 | $90.00 | $79.00 | $113 | $110 | $120 | $110 | $105 | 8% |
| 609E26000 CURB, TYPE 6 | 6,387 FT | $30.00 | $27.50 | $22.00 | $25.25 | $22.00 | $30.00 | $42.00 | $30.00 | $24.00 | 6% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 654 CY | $275 | $257 | $238 | $258 | $257 | $340 | $238 | $238 | $257 | 5% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,433 SY | $125 | $106 | $112 | $121 | $117 | $130 | $120 | $112 | $100 | 5% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 539 CY | $280 | $274 | $265 | $275 | $274 | $330 | $265 | $265 | $274 | 4% |
| 203E10000 EXCAVATION | 8,783 CY | $15.00 | $20.00 | $18.00 | $21.00 | $23.00 | $12.50 | $33.00 | $20.00 | $28.80 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $110,000 | $30,000 | $32,446 | $55,000 | $34,382 | $50,000 | $40,000 | $32,000 | $31,030 | 3% |
| 202E23000 PAVEMENT REMOVED | 10,554 SY | $10.00 | $16.00 | $17.00 | $16.00 | $11.00 | $10.00 | $10.00 | $21.00 | $20.00 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,148 SY | $90.00 | $60.00 | $95.00 | $63.00 | $89.00 | $90.00 | $80.00 | $60.00 | $98.75 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $243,000 | $200,000 | $127,690 | $239,477 | $128,000 | $200,000 | $275,000 | $200,000 | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B30 | 24 EACH | $3,600 | $3,550 | $3,550 | $3,600 | $3,550 | $4,000 | $3,550 | $2,900 | $3,238 | 3% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 29 EACH | $2,600 | $2,200 | $2,200 | $2,300 | $2,200 | $2,500 | $2,200 | $2,650 | $1,900 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 6,133 FT | $11.00 | $12.50 | $18.00 | $30.00 | $14.00 | $15.00 | $22.00 | $18.50 | $14.60 | 2% |
| 611E10400 24" CONDUIT, TYPE B | 301 FT | $203 | $265 | $175 | $142 | $387 | $90.00 | $310 | $225 | $149 | 2% |
| 832E30000 EROSION CONTROL | 60,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E96600 CONDUIT, BORED OR JACKED; 24" TYPE B | 147 FT | $400 | $650 | $900 | $1,005 | $570 | $680 | $860 | $900 | $1,312 | 2% |
| 659E00300 TOPSOIL | 3,907 CY | $15.00 | $17.00 | $20.00 | $82.00 | $32.00 | $20.00 | $38.00 | $28.00 | $50.29 | 2% |
| $2.00 |
| $6.00 |
| $20.00 |
| $4.40 |
| $2.50 |
| $4.80 |
| 202E32000 CURB REMOVED | 325 FT | $4.00 | $5.00 | $3.00 | $4.00 | $22.00 | $10.00 | $8.00 | $7.50 | $4.30 |
| 202E32500 CURB AND GUTTER REMOVED | 237 FT | $4.00 | $5.00 | $4.00 | $5.00 | $30.00 | $15.00 | $8.00 | $12.00 | $10.11 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 170 FT | $15.00 | $27.00 | $30.00 | $18.00 | $21.00 | $20.00 | $25.00 | $25.00 | $45.26 |
| 202E38000 GUARDRAIL REMOVED | 3,717 FT | $2.00 | $2.00 | $2.00 | $3.00 | $5.00 | $4.00 | $8.50 | $2.00 | $2.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $200 | $100 | $100 | $152 | $33.00 | $260 | $100 | $150 | $120 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $800 | $800 | $550 | $586 | $658 | $1,300 | $1,200 | $900 | $694 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $400 | $550 | $350 | $586 | $658 | $470 | $800 | $450 | $569 |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $300 | $550 | $1,100 | $757 | $1,012 | $880 | $1,000 | $950 | $1,463 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 18" | 187 FT | $90.00 | $35.00 | $25.00 | $36.00 | $38.00 | $35.00 | $39.00 | $38.00 | $17.95 |
| 202E75000 FENCE REMOVED | 88 FT | $10.00 | $10.00 | $5.00 | $5.00 | $4.00 | $5.50 | $6.00 | $8.00 | $9.95 |
| 202E98100 REMOVAL MISC.:CONCRETE PAD | 5 EACH | $750 | $300 | $225 | $471 | $206 | $470 | $400 | $250 | $570 |
| 202E98100 REMOVAL MISC.:POST | 5 EACH | $50.00 | $150 | $300 | $67.00 | $47.00 | $540 | $85.00 | $140 | $83.00 |
| 204E10000 SUBGRADE COMPACTION | 14,100 SY | $2.50 | $2.30 | $5.00 | $1.00 | $3.00 | $4.00 | $2.50 | $4.00 | $4.30 |
| 204E13000 EXCAVATION OF SUBGRADE | 157 CY | $30.00 | $20.00 | $40.00 | $30.00 | $35.00 | $60.00 | $22.00 | $50.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 157 CY | $100 | $95.00 | $90.00 | $87.00 | $104 | $130 | $115 | $95.00 | $87.00 |
| 204E45000 PROOF ROLLING | 8 HOUR | $75.00 | $250 | $250 | $309 | $145 | $1,100 | $250 | $325 | $291 |
| 204E50000 GEOTEXTILE FABRIC | 1,407 SY | $2.00 | $3.50 | $0.70 | $2.00 | $2.00 | $2.00 | $2.00 | $2.50 | $2.25 |
| 606E15050 GUARDRAIL, TYPE MGS | 975 FT | $21.00 | $20.00 | $20.00 | $24.00 | $39.00 | $25.00 | $20.00 | $20.20 | $20.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 5 EACH | $2,500 | $2,500 | $2,500 | $2,250 | $2,900 | $2,800 | $2,500 | $2,550 | $2,500 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 5 EACH | $1,200 | $1,150 | $1,150 | $1,050 | $1,650 | $1,300 | $1,150 | $1,340 | $1,150 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,000 | $1,900 | $1,900 | $2,100 | $2,300 | $2,200 | $1,900 | $2,460 | $1,900 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $550 | $525 | $525 | $315 | $650 | $600 | $525 | $650 | $525 |
| 608E10000 4" CONCRETE WALK | 2,375 SF | $10.00 | $9.30 | $8.90 | $8.00 | $9.00 | $15.00 | $9.50 | $7.50 | $9.00 |
| 608E52000 CURB RAMP | 82 SF | $40.00 | $35.75 | $70.00 | $34.50 | $67.00 | $25.00 | $25.00 | $31.00 | $30.00 |
| 609E33000 CURB, TYPE 10 | 1,088 FT | $27.00 | $27.50 | $37.00 | $25.25 | $29.00 | $35.00 | $48.00 | $52.00 | $27.16 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $210 | $300 | $300 | $315 | $300 | $340 | $300 | $250 | $898 |
| 632E90102 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE | 1 EACH | $3,300 | $3,200 | $3,200 | $3,200 | $3,200 | $3,600 | $3,200 | $3,000 | $4,520 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $250 | $225 | $250 | $276 | $250 | $110 | $400 | $250 | $416 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $250 | $225 | $250 | $276 | $250 | $220 | $400 | $450 | $416 |
| 203E20001 EMBANKMENT, AS PER PLAN | 16 CY | $50.00 | $42.50 | $77.00 | $184 | $35.00 | $85.00 | $55.00 | $85.62 | $73.00 |
| 203E35000 GRANULAR EMBANKMENT | 36 CY | $60.00 | $90.00 | $125 | $94.00 | $110 | $100 | $100 | $111 | $87.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 64 CY | $110 | $118 | $120 | $107 | $117 | $95.00 | $140 | $95.40 | $87.00 |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC | 264 SY | $2.00 | $2.50 | $4.00 | $2.00 | $3.00 | $2.00 | $2.50 | $5.70 | $2.25 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 28.8 SY | $175 | $130 | $100 | $118 | $108 | $160 | $92.00 | $150 | $190 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 72 SY | $225 | $32.00 | $95.00 | $82.00 | $112 | $130 | $80.00 | $150 | $141 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 62 CY | $130 | $150 | $110 | $119 | $138 | $120 | $128 | $120 | $190 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 18 CY | $250 | $175 | $270 | $127 | $318 | $250 | $138 | $280 | $185 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $125 | $125 | $131 | $125 | $160 | $150 | $150 | $125 |
| 659E10000 SEEDING AND MULCHING | 31,346 SY | $1.00 | $0.67 | $0.70 | $0.75 | $2.45 | $0.80 | $0.75 | $0.75 | $0.67 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,567 SY | $0.05 | $0.80 | $0.80 | $0.85 | $5.00 | $1.00 | $0.75 | $0.75 | $0.80 |
| 659E15000 INTER-SEEDING | 1,567 SY | $0.05 | $0.80 | $0.70 | $0.85 | $2.00 | $1.00 | $0.75 | $0.75 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 4.37 TON | $1,300 | $787 | $790 | $900 | $1,260 | $980 | $1,250 | $1,250 | $787 |
| 659E31000 LIME | 6.48 ACRE | $200 | $156 | $156 | $166 | $111 | $190 | $150 | $150 | $156 |
| 659E35000 WATER | 173 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $2.50 | $1.50 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 0.28 MSF | $500 | $220 | $220 | $3,153 | $1,923 | $270 | $5,000 | $5,000 | $220 |
| 670E00500 SLOPE EROSION PROTECTION | 3,851 SY | $3.50 | $0.15 | $1.50 | $1.75 | $2.60 | $2.00 | $2.50 | $2.50 | $1.45 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 466 SY | $3.50 | $1.49 | $1.50 | $2.00 | $2.10 | $2.00 | $2.50 | $2.50 | $1.49 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 303 SY | $9.00 | $4.08 | $4.10 | $3.00 | $5.25 | $5.00 | $6.00 | $6.00 | $4.08 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 226 CY | $90.00 | $35.00 | $92.00 | $122 | $106 | $80.00 | $130 | $110 | $121 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $3,250 | $3,500 | $3,250 | $3,250 | $3,500 | $3,000 | $3,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $13,500 | $10,700 | $13,500 | $6,748 | $10,700 | $18,000 | $10,800 | $10,800 | $12,800 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,000 | $11,850 | $13,000 | $12,422 | $11,900 | $15,000 | $15,000 | $11,800 | $16,712 |
| 602E20000 CONCRETE MASONRY | 5 CY | $2,500 | $1,500 | $2,800 | $2,285 | $8,057 | $3,100 | $3,500 | $2,750 | $4,344 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 180 FT | $15.00 | $21.00 | $18.00 | $27.00 | $49.00 | $45.00 | $22.00 | $20.00 | $28.80 |
| 605E31100 AGGREGATE DRAINS | 80 FT | $25.00 | $18.00 | $18.00 | $26.00 | $35.00 | $60.00 | $25.00 | $10.00 | $28.80 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 876 FT | $20.00 | $27.00 | $25.00 | $29.00 | $25.00 | $20.00 | $25.00 | $24.00 | $29.25 |
| 611E04400 12" CONDUIT, TYPE B | 191 FT | $82.50 | $105 | $95.00 | $84.00 | $139 | $120 | $110 | $120 | $129 |
| 611E04600 12" CONDUIT, TYPE C | 405 FT | $75.50 | $92.00 | $90.00 | $76.00 | $129 | $130 | $110 | $110 | $105 |
| 611E05200 12" CONDUIT, TYPE F | 56 FT | $100 | $130 | $110 | $158 | $90.00 | $170 | $110 | $110 | $46.75 |
| 611E05900 15" CONDUIT, TYPE B | 227 FT | $85.50 | $115 | $100 | $90.00 | $141 | $120 | $120 | $130 | $135 |
| 611E06100 15" CONDUIT, TYPE C | 100 FT | $108 | $120 | $110 | $82.00 | $186 | $210 | $120 | $100 | $143 |
| 611E10600 24" CONDUIT, TYPE C | 111 FT | $103 | $160 | $145 | $125 | $226 | $200 | $180 | $130 | $161 |
| 611E98150 CATCH BASIN, NO. 3 | 15 EACH | $3,600 | $5,250 | $4,800 | $5,250 | $7,204 | $6,000 | $6,500 | $4,500 | $5,798 |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $2,600 | $4,000 | $4,000 | $4,500 | $5,849 | $4,500 | $5,800 | $3,600 | $4,856 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $7,000 | $3,900 | $8,100 | $7,500 | $6,682 | $5,500 | $6,800 | $4,400 | $4,236 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,550 | $2,250 | $3,000 | $3,900 | $3,700 | $4,000 | $4,200 | $2,000 | $2,516 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $1,750 | $2,500 | $3,100 | $4,100 | $4,879 | $5,400 | $4,900 | $2,750 | $4,026 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $400 | $500 | $850 | $764 | $1,257 | $3,200 | $750 | $800 | $712 |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $3,600 | $4,200 | $4,600 | $6,000 | $6,429 | $5,900 | $5,500 | $4,300 | $8,528 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 1 EACH | $18,000 | $5,300 | $13,000 | $13,750 | $12,962 | $15,000 | $12,000 | $4,300 | $7,956 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 17 EACH | $250 | $340 | $350 | $531 | $650 | $480 | $350 | $350 | $336 |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (Perforated) | 30 FT | $25.00 | $29.00 | $20.00 | $45.00 | $6.00 | $20.00 | $35.00 | $30.00 | $20.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 2,306 SY | $12.50 | $11.50 | $17.80 | $11.75 | $11.50 | $20.00 | $12.00 | $12.00 | $11.50 |
| 407E20000 NON-TRACKING TACK COAT | 1,069 GAL | $3.90 | $3.90 | $3.50 | $4.00 | $3.90 | $6.50 | $3.50 | $3.50 | $3.90 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 52 SY | $100 | $98.00 | $130 | $184 | $120 | $110 | $100 | $125 | $129 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 70 SY | $110 | $95.00 | $165 | $205 | $128 | $120 | $170 | $120 | $126 |
| 609E72100 CONCRETE MEDIAN | 53 CY | $825 | $645 | $525 | $368 | $921 | $910 | $590 | $450 | $770 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 1 EACH | $300 | $500 | $400 | $764 | $365 | $370 | $450 | $250 | $560 |
| 638E08790 2" CUTTING-IN SLEEVE, VALVE AND VALVE BOX | 2 EACH | $1,500 | $2,600 | $2,000 | $1,470 | $2,911 | $5,700 | $2,750 | $2,500 | $2,972 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $200 | $425 | $350 | $764 | $451 | $810 | $500 | $250 | $560 |
| 638E20414 SPECIAL - 2" WATER MAIN POLYVINYL CHLORIDE PIPE AN | 551 FT | $40.00 | $45.00 | $60.00 | $42.00 | $75.00 | $65.00 | $7.00 | $35.00 | $63.40 |
| 638E98000 WATER WORK, MISC.:WATER VALVE RECONSTRUCT TO GRADE | 2 EACH | $400 | $550 | $750 | $764 | $899 | $1,200 | $1,500 | $400 | $1,943 |
| 625E00450 CONNECTION, FUSED PULL APART | 58 EACH | $120 | $115 | $115 | $116 | $115 | $130 | $115 | $145 | $151 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 72 EACH | $120 | $115 | $115 | $116 | $115 | $130 | $115 | $135 | $138 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B30 | 5 EACH | $3,600 | $3,580 | $3,580 | $3,600 | $3,580 | $4,100 | $3,580 | $2,900 | $3,296 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 2,528 FT | $5.00 | $4.70 | $4.70 | $5.00 | $4.70 | $5.50 | $4.70 | $5.00 | $4.63 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,746 FT | $2.00 | $1.80 | $1.80 | $2.00 | $1.80 | $2.00 | $1.80 | $2.25 | $2.89 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 2,863 FT | $10.25 | $10.20 | $10.20 | $11.00 | $10.20 | $10.00 | $10.20 | $15.00 | $8.68 |
| 625E25500 CONDUIT, 3", 725.04 | 796 FT | $36.00 | $35.00 | $35.00 | $36.00 | $35.00 | $40.00 | $35.00 | $36.00 | $39.75 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 29 EACH | $450 | $440 | $440 | $450 | $440 | $500 | $440 | $550 | $592 |
| 625E29002 TRENCH, 24" DEEP | 3,316 FT | $11.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $10.00 | $12.00 | $9.95 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $875 | $857 | $857 | $875 | $857 | $970 | $857 | $1,700 | $1,102 |
| 625E30706 PULL BOX, 725.08, 24" | 9 EACH | $1,175 | $1,150 | $1,150 | $1,200 | $1,150 | $1,300 | $1,150 | $1,900 | $1,332 |
| 625E32000 GROUND ROD | 29 EACH | $290 | $280 | $280 | $290 | $280 | $320 | $280 | $350 | $381 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $9,750 | $9,700 | $9,700 | $9,800 | $9,700 | $11,000 | $9,700 | $9,000 | $17,416 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 3,316 FT | $1.60 | $1.50 | $1.50 | $1.75 | $1.50 | $1.50 | $1.50 | $1.85 | $0.07 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, PS-A | 1 EACH | $3,600 | $3,500 | $3,500 | $3,600 | $3,500 | $3,500 | $3,500 | $2,500 | $4,420 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, PS-B | 1 EACH | $3,600 | $3,500 | $3,500 | $3,600 | $3,500 | $3,500 | $3,500 | $2,500 | $4,420 |
| 621E00100 RPM (TWO-WAY YELLOW/RED) | 28 EACH | $90.00 | $90.00 | $90.00 | $95.00 | $90.00 | $100 | $90.00 | $90.00 | $90.00 |
| 621E00100 RPM (TWO-WAY YELLOW/YELLOW) | 11 EACH | $90.00 | $90.00 | $90.00 | $95.00 | $90.00 | $100 | $90.00 | $90.00 | $90.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 79 EACH | $8.00 | $6.50 | $8.00 | $11.00 | $5.00 | $15.00 | $30.00 | $20.00 | $23.03 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 34 EACH | $13.00 | $12.00 | $12.00 | $11.00 | $11.00 | $15.00 | $25.00 | $11.50 | $35.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 231.3 FT | $15.00 | $14.00 | $14.00 | $16.00 | $15.93 | $15.00 | $14.00 | $14.00 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 154.8 FT | $16.00 | $15.00 | $15.00 | $19.00 | $17.94 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 360.6 FT | $27.00 | $25.00 | $25.00 | $27.00 | $26.00 | $30.00 | $25.00 | $16.00 | $25.00 |
| 630E06100 GROUND MOUNTED SUPPORT, NO. 6 POST | 34.4 FT | $27.00 | $25.00 | $25.00 | $31.00 | $30.02 | $30.00 | $25.00 | $20.00 | $25.00 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 127.2 FT | $55.00 | $52.50 | $52.50 | $81.00 | $80.24 | $60.00 | $52.50 | $70.00 | $52.50 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 66.7 FT | $17.00 | $16.50 | $16.50 | $19.00 | $17.94 | $20.00 | $16.50 | $16.00 | $16.50 |
| 630E08600 SIGN POST REFLECTOR | 13 EACH | $42.00 | $40.00 | $40.00 | $67.00 | $63.45 | $45.00 | $40.00 | $45.00 | $40.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $1,000 | $950 | $950 | $640 | $623 | $1,100 | $950 | $960 | $950 |
| 630E80100 SIGN, FLAT SHEET | 554 SF | $20.00 | $19.50 | $19.50 | $21.50 | $20.93 | $20.00 | $19.50 | $16.50 | $19.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 499 SF | $25.00 | $24.00 | $24.00 | $27.00 | $26.47 | $25.00 | $24.00 | $25.00 | $24.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,550 | $1,500 | $1,500 | $1,150 | $1,135 | $1,700 | $1,500 | $1,580 | $1,500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 54 EACH | $26.00 | $25.00 | $25.00 | $17.00 | $16.10 | $30.00 | $25.00 | $15.00 | $25.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 33 EACH | $26.00 | $25.00 | $25.00 | $23.00 | $21.61 | $30.00 | $25.00 | $30.00 | $25.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 7 EACH | $160 | $150 | $150 | $208 | $198 | $170 | $150 | $185 | $150 |
| 630E85500 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND STORAGE | 1 EACH | $260 | $250 | $250 | $208 | $198 | $280 | $250 | $300 | $250 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $30.00 | $25.00 | $25.00 | $23.00 | $21.46 | $30.00 | $25.00 | $15.00 | $25.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 3 EACH | $55.00 | $50.00 | $50.00 | $30.00 | $28.81 | $55.00 | $50.00 | $45.00 | $50.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 6 EACH | $210 | $200 | $200 | $120 | $114 | $230 | $200 | $95.00 | $200 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 14 EACH | $400 | $375 | $375 | $299 | $284 | $430 | $375 | $215 | $375 |
| 630E86204 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $400 | $375 | $375 | $299 | $284 | $430 | $375 | $320 | $375 |
| 644E00104 EDGE LINE, 6" (WHITE) | 1.02 MILE | $7,000 | $7,915 | $6,700 | $7,042 | $6,700 | $9,000 | $6,700 | $7,915 | $7,915 |
| 644E00104 EDGE LINE, 6" (YELLOW) | 0.73 MILE | $7,000 | $7,915 | $6,700 | $7,042 | $6,700 | $9,000 | $6,700 | $7,915 | $7,915 |
| 644E00300 CENTER LINE, 4", DOUBLE SOLID YELLOW | 0.8 MILE | $9,000 | $11,290 | $8,700 | $9,144 | $8,700 | $13,000 | $8,700 | $11,290 | $11,290 |
| 644E00300 CENTER LINE, BROKEN AND SOLID, 4" DOUBLE | 0.02 MILE | $6,200 | $11,290 | $5,835 | $6,135 | $5,834 | $13,000 | $5,835 | $11,290 | $11,290 |
| 644E00700 TRANSVERSE/DIAGONAL LINE (YELLOW) | 423 FT | $15.00 | $9.50 | $13.10 | $14.00 | $13.10 | $10.00 | $13.10 | $9.50 | $9.50 |
| 644E01300 LANE ARROW | 2 EACH | $200 | $125 | $190 | $200 | $190 | $140 | $190 | $125 | $125 |
| 644E01360 WRONG WAY ARROW | 4 EACH | $400 | $160 | $350 | $368 | $350 | $180 | $350 | $160 | $160 |
| 644E01520 DOTTED LINE, 12" | 298 FT | $2.50 | $4.60 | $2.25 | $2.00 | $2.25 | $5.00 | $2.25 | $4.60 | $4.60 |
| 644E20800 YIELD LINE | 119 FT | $12.00 | $17.00 | $10.10 | $11.00 | $10.10 | $20.00 | $10.10 | $17.00 | $17.00 |
| 410E11000 TRAFFIC COMPACTED SURFACE, TYPE B | 80 CY | $75.00 | $100 | $105 | $89.00 | $117 | $130 | $89.62 | $141 | $125 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E, FOR MAINTAINING TRAFFIC | 1 EACH | $2,300 | $2,000 | $2,000 | $2,344 | $3,500 | $2,300 | $2,000 | $2,020 | $2,000 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T, FOR MAINTAINING TRAFFIC | 2 EACH | $1,100 | $1,000 | $1,000 | $1,083 | $2,475 | $1,100 | $1,000 | $1,050 | $1,000 |
| 611E96600 CONDUIT, BORED OR JACKED; 12" TYPE B | 41 FT | $300 | $600 | $1,000 | $1,200 | $488 | $540 | $900 | $1,050 | $1,419 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 320 HOUR | $80.00 | $90.00 | $95.00 | $79.00 | $85.00 | $130 | $65.00 | $125 | $140 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,000 FT | $2.00 | $1.60 | $0.70 | $2.00 | $1.60 | $2.00 | $3.00 | $2.75 | $1.60 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 325 FT | $22.00 | $20.00 | $20.00 | $26.00 | $42.00 | $21.00 | $20.00 | $16.00 | $20.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,000 | $2,200 | $2,360 | $1,786 | $2,000 | $2,900 | $3,894 | $2,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $5,500 | $5,500 | $5,772 | $5,500 | $6,200 | $5,500 | $5,500 | $5,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $170 | $300 | $550 | $289 | $557 | $400 | $350 | $500 | $399 |
| 614E13310 BARRIER REFLECTOR, TYPE 1(BI-DIRECTIONAL) | 20 EACH | $35.00 | $15.00 | $15.00 | $13.00 | $35.00 | $35.00 | $20.00 | $35.00 | $35.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, ONE-WAY | 53 EACH | $30.00 | $15.00 | $10.00 | $13.00 | $30.00 | $30.00 | $20.00 | $30.00 | $30.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 36 EACH | $32.00 | $15.00 | $12.00 | $21.00 | $32.00 | $32.00 | $30.00 | $32.00 | $32.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 20 EACH | $42.00 | $16.00 | $15.00 | $23.00 | $42.00 | $42.00 | $35.00 | $42.00 | $42.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 32 SNMT | $1,500 | $1,500 | $1,500 | $950 | $1,500 | $1,500 | $1,500 | $1,500 | $1,500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | — | $3,600 | $3,500 | $3,500 | $3,679 | $3,500 | $3,500 | $3,500 | $3,500 | $3,500 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | — | $2,000 | $1,875 | $1,875 | $1,971 | $1,875 | $1,875 | $1,875 | $1,875 | $1,875 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | — | $2,000 | $1,875 | $1,875 | $1,971 | $1,875 | $1,875 | $1,875 | $1,875 | $1,875 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 50 FT | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 125 FT | $7.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 200 FT | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $15,000 | $30,000 | $67,000 | $28,188 | $38,192 | $65,000 | $25,000 | $90,000 | $50,000 |
| 616E10000 WATER | 40 MGAL | $90.00 | $55.00 | $60.00 | $50.00 | $1.00 | $0.01 | $1.00 | $90.00 | $80.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,220 FT | $30.00 | $29.75 | $28.00 | $39.00 | $25.00 | $22.00 | $29.00 | $40.00 | $26.35 |
| 642E20802 YIELD LINE, TYPE 1 | 106 FT | $22.00 | $20.00 | $20.00 | $21.00 | $20.00 | $18.00 | $20.00 | $20.00 | $20.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $50,000 | $124,500 | $60,000 | $23,918 | $121,282 | $155,000 | $40,000 | $75,000 | $70,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,535 CY | $220 | $558k | 12% |
| 203E20000 EMBANKMENT | 31,570 CY | $16.8 | $530k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $358,000 | $358k | 8% |
| 304E20000 AGGREGATE BASE | 2,371 CY | $110 | $261k | 5% |
| 609E26000 CURB, TYPE 6 | 6,387 FT | $30 | $192k | 4% |
| 442E22400 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 654 CY | $275 | $180k | 4% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,433 SY | $125 | $179k | 4% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 539 CY | $280 | $151k | 3% |
| 203E10000 EXCAVATION | 8,783 CY | $15 | $132k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $110,000 | $110k | 2% |