LOR-SR 83-10.79
LOR County · est $4.3M
Bid dateThursday, October 31—
LOR County · est $4.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 82 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Ohio Concrete Maintenance LLC | R3Ruhlin Company | % of bid |
|---|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 390,800 LB | $2.75 | $2.85 | $2.88 | 31% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 351 CY | $1,250 | $1,100 | $1,100 | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $425,000 | $345,000 | 7% |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 130,248 LB | $1.60 | $1.30 | $1.44 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $206,000 | $110,000 | $220,000 | 6% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 296 SY | $550 | $345 | $510 | 5% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT |
| Item | Quantity | R1Great Lakes Construction CO | R2Ohio Concrete Maintenance LLC | R3Ruhlin Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $3,500 | $45,000 |
| 202E32000 CURB REMOVED | 50 FT | $5.00 | $15.00 | $6.50 |
| 202E38000 GUARDRAIL REMOVED | 1,600 FT | $1.80 | $2.00 | $4.00 |
| 202E75000 FENCE REMOVED | 108 FT | $3.00 | $4.00 | $10.26 |
| 203E10000 EXCAVATION | 325 CY | $50.00 | $40.00 | $31.50 |
| 203E20000 EMBANKMENT | 241 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 20,500 SF |
| $6.00 |
| $6.50 |
| $8.75 |
| 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 990 SY | $105 | $88.00 | $96.00 | 3% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 69 CY | $1,500 | $1,700 | $1,200 | 3% |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 20,500 SF | $5.00 | $6.50 | $4.00 | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 52 CY | $1,800 | $1,730 | $1,500 | 3% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 122 FT | $725 | $950 | $780 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (T=8") | 348 CY | $250 | $240 | $220 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,000 | $50,000 | $155,000 | 2% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 7 EACH | $10,000 | $13,500 | $17,000 | 2% |
| 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 530 FT | $105 | $105 | $100 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $55,000 | $45,000 | $25,000 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $18,500 | $25,000 | 1% |
| 202E23000 PAVEMENT REMOVED | 1,572 SY | $26.00 | $25.00 | $24.00 | 1% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 1,388 SF | $28.00 | $30.00 | $32.00 | 1% |
| $55.00 |
| $48.00 |
| $67.00 |
| 204E10000 SUBGRADE COMPACTION | 2,026 SY | $2.50 | $3.00 | $5.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 1,026 FT | $22.40 | $25.00 | $21.00 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 150 FT | $37.20 | $40.00 | $23.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,680 | $2,850 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,390 | $1,500 | $1,300 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 6 EACH | $2,530 | $3,000 | $2,400 |
| 607E15000 FENCE, TYPE 47 | 108 FT | $34.50 | $38.00 | $35.89 |
| 609E24500 CURB, TYPE 4-B | 70 FT | $75.00 | $50.00 | $44.00 |
| 623E39600 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE | 2 EACH | $325 | $700 | $850 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 7 SY | $200 | $200 | $250 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 152 SY | $100 | $110 | $140 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $600 | $400 |
| 659E00300 TOPSOIL | 116 CY | $30.00 | $85.00 | $72.00 |
| 659E10000 SEEDING AND MULCHING | 1,040 SY | $1.50 | $6.00 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 52 SY | $3.00 | $10.00 | $3.00 |
| 659E15000 INTER-SEEDING | 52 SY | $0.25 | $10.00 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $1,500 | $750 | $1,500 |
| 659E31000 LIME | 0.22 ACRE | $1.00 | $1,200 | $140 |
| 659E35000 WATER | 10 MGAL | $1.00 | $20.00 | $5.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 818 FT | $18.00 | $24.00 | $29.50 |
| 611E01500 6" CONDUIT, TYPE F | 69 FT | $45.00 | $26.00 | $29.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $400 | $500 | $700 |
| 304E20000 AGGREGATE BASE (T=6") | 308 CY | $98.00 | $125 | $120 |
| 407E10000 TACK COAT | 157 GAL | $1.00 | $3.50 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 54 CY | $260 | $400 | $350 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (76 CY | $305 | $300 | $310 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $550 | $450 | $400 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 4 EACH | $5,000 | $8,000 | $1,800 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 16 EACH | $10.50 | $12.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 24 EACH | $12.90 | $14.00 | $11.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 65 FT | $8.50 | $15.00 | $16.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 76 FT | $12.50 | $16.00 | $18.50 |
| 630E80100 SIGN, FLAT SHEET | 45 SF | $24.00 | $25.00 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 14 EACH | $25.50 | $50.00 | $16.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $36.00 | $50.00 | $21.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.4 MILE | $2,000 | $4,800 | $3,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.2 MILE | $2,000 | $7,000 | $3,100 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 1 EACH | $245 | $500 | $430 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $100 | $110 | $120 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,785 FT | $0.65 | $4.00 | $8.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,050 | $2,600 | $2,200 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 48 EACH | $10.50 | $22.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 6 EACH | $14.85 | $33.00 | $16.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $750 | $1,000 | $700 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.62 MILE | $2,000 | $7,500 | $5,100 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.22 MILE | $11,850 | $10,000 | $6,900 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 23 FT | $5.00 | $12.00 | $9.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,271 FT | $18.00 | $25.00 | $20.50 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 670 FT | $35.00 | $30.00 | $46.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $22,000 | $15,000 | $30,000 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $62.00 | $50.00 | $43.50 |
| 503E21100 UNCLASSIFIED EXCAVATION | 94 CY | $350 | $75.00 | $310 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 140 LB | $10.00 | $5.00 | $2.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 542 EACH | $35.00 | $30.00 | $24.00 |
| 511E43210 CLASS QC1 CONCRETE, PIER | 17 CY | $2,200 | $6,000 | $4,100 |
| 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA) | 260 EACH | $25.00 | $25.00 | $39.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 1,005 SY | $20.00 | $35.00 | $26.50 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 44 FT | $60.00 | $75.00 | $140 |
| 512E33000 TYPE 2 WATERPROOFING | 50 SY | $35.00 | $45.00 | $40.50 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 154 SY | $13.00 | $30.00 | $14.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 277 SY | $42.00 | $35.00 | $18.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 6,408 EACH | $4.60 | $10.00 | $4.50 |
| 514E10000 FINAL INSPECTION REPAIR | 18 EACH | $150 | $100 | $1.00 |
| 514E27700 FIELD PAINTING, MISC.: ZINC RICH PRIMER | 81 SF | $80.00 | $42.00 | $110 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,100 | $1,600 | $1,300 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,400 | $1,600 | $1,300 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 6 EACH | $1,900 | $3,000 | $2,200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 51 CY | $125 | $150 | $130 |
| 526E90010 TYPE A INSTALLATION | 118 FT | $190 | $200 | $220 |
| 530E13000 SPECIAL - FORM LINER | 438 SF | $24.00 | $16.00 | $36.50 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 202 CY | $100 | $130 | $110 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 124 SF | $115 | $125 | $130 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $50.00 | $10,000 | $500 |
| 619E16020 FIELD OFFICE, TYPE C | 9 MNTH | $4,000 | $2,200 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $25,000 | $60,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2 | 390,800 LB | $2.75 | $1.07M | 26% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 351 CY | $1,250 | $439k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $250k | 6% |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 130,248 LB | $1.6 | $208k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $206,000 | $206k | 5% |
| 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 296 SY | $550 | $163k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 20,500 SF | $6 | $123k | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 990 SY | $105 | $104k | 2% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 69 CY | $1,500 | $104k | 2% |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 20,500 SF | $5 | $103k | 2% |