D01-OL FY25
D01 County · est $1.9M
Bid dateThursday, December 19—
D01 County · est $1.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 83 more items below.
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Bcc Ohio INC | R3Complete General Construction Company | R4Perk Company INC | R5Catts Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,510 SY | $52.00 | $50.40 | $48.00 | $48.00 | $48.00 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $115,000 | $137,000 | $80,000 | $160,000 | $174,000 | 9% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 978 SY | $107 | $126 | $125 | $98.90 | $162 | 8% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 654 SY | $145 | $136 | $125 | $120 | $162 | 7% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 756 SY | $120 | $129 | $125 | $98.50 | $162 | 7% |
| Item | Quantity | R1Ohio Concrete Maintenance LLC | R2Bcc Ohio INC | R3Complete General Construction Company | R4Perk Company INC | R5Catts Construction INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $1,170 | $5,000 | $15,000 | $19,400 |
| 202E38000 GUARDRAIL REMOVED | 975 FT | $3.00 | $2.10 | $2.00 | $10.00 | $2.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 12 EACH | $90.00 | $89.25 | $290 | $565 | $104 |
| 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN | 975 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $82,500 |
| $38,867 |
| $80,000 |
| $160,150 |
| $118,000 |
| 6% |
| 614E22326 WORK ZONE EDGE LINE, CLASS I, 6", 873 | 5.14 MILE | $15,000 | $14,095 | $13,425 | $14,000 | $16,400 | 6% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 424 SY | $165 | $176 | $135 | $170 | $162 | 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 424 SY | $165 | $176 | $135 | $170 | $162 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 110 CY | $550 | $525 | $500 | $500 | $607 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,400 FT | $24.00 | $20.14 | $23.00 | $35.00 | $22.75 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 978 SY | $55.00 | $69.91 | $115 | $94.50 | $91.00 | 4% |
| 517E72750 RAILING (THRIE BEAM RETROFIT) | 541.5 FT | $92.00 | $92.40 | $88.00 | $92.00 | $108 | 4% |
| 517E72750 RAILING (THRIE BEAM RETROFIT) | 507 FT | $92.00 | $92.40 | $88.00 | $92.00 | $108 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 756 SY | $58.00 | $77.31 | $115 | $98.50 | $93.00 | 3% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 654 SY | $58.00 | $79.08 | $100 | $110 | $94.00 | 3% |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 26 CY | $1,400 | $2,026 | $2,600 | $2,260 | $4,200 | 3% |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 11,820 FT | $3.00 | $0.89 | $2.88 | $2.50 | $0.69 | 3% |
| 253E02000 PAVEMENT REPAIR | 60 CY | $550 | $551 | $525 | $525 | $486 | 2% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 424 SY | $75.00 | $111 | $125 | $130 | $98.00 | 2% |
| $23.00 |
| $22.26 |
| $21.20 |
| $21.60 |
| $26.00 |
| 606E35121 BRIDGE TERMINAL ASSEMBLY, TYPE 3, AS PER PLAN | 8 EACH | $3,500 | $3,549 | $3,380 | $2,475 | $4,153 |
| 606E35001 BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,500 | $2,342 | $2,230 | $2,280 | $2,741 |
| 606E26501 ANCHOR ASSEMBLY, TYPE T, AS PER PLAN | 2 EACH | $1,300 | $1,139 | $1,085 | $1,120 | $1,333 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 253E02000 PAVEMENT REPAIR | 45 CY | $550 | $551 | $525 | $525 | $552 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 161 FT | $15.00 | $26.17 | $9.00 | $25.00 | $95.00 |
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 72 FT | $55.00 | $70.75 | $100 | $72.50 | $120 |
| 407E20000 NON-TRACKING TACK COAT | 225 GAL | $2.75 | $2.57 | $2.45 | $2.45 | $18.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 30 CY | $550 | $525 | $500 | $500 | $824 |
| 617E10100 COMPACTED AGGREGATE | 150 CY | $50.00 | $126 | $127 | $200 | $85.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1 1/2) | 2,630 SY | $10.00 | $11.23 | $9.00 | $9.00 | $5.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 56 HOUR | $110 | $89.25 | $85.00 | $100 | $55.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $35,887 | $35,000 | $5,000 | $40,000 |
| 614E12470 WORK ZONE SPEED LIMIT SIGN | 3 EACH | $300 | $122 | $116 | $250 | $142 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,100 | $991 | $945 | $1,250 | $1,160 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 0.81 MILE | $2,000 | $3,581 | $3,410 | $1,800 | $4,190 |
| 614E24122 WORK ZONE DOTTED LINE, CLASS I, 6", 873 | 5,040 FT | $2.00 | $1.74 | $1.66 | $1.50 | $2.00 |
| 616E10000 WATER | 2 MGAL | $20.00 | $2.10 | $150 | $80.00 | $120 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $950 | $657 | $727 | $850 | $893 |
| 407E10000 TACK COAT | 60 GAL | $3.00 | $2.57 | $2.45 | $2.45 | $12.25 |
| 614E11630 INCREASED BARRIER DELINEATION | 400 FT | $2.00 | $2.85 | $2.71 | $1.50 | $2.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (ONE WAY) | 28 EACH | $10.00 | $13.90 | $13.24 | $8.00 | $16.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 28 EACH | $18.00 | $23.30 | $22.19 | $16.00 | $27.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,316 SY | $10.00 | $11.30 | $14.00 | $23.50 | $11.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: USING DOW | 141 FT | $80.00 | $56.93 | $135 | $60.00 | $184 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 141 SF | $100 | $143 | $180 | $405 | $276 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 101 SF | $115 | $143 | $105 | $385 | $276 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 6 SY | $50.00 | $36.75 | $120 | $445 | $12.00 |
| 202E23500 WEARING COURSE REMOVED (T=1.25") | 978 SY | $13.00 | $5.92 | $13.00 | $14.00 | $16.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: USING DOW | 63 FT | $80.00 | $56.93 | $135 | $71.00 | $185 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 35 SF | $150 | $143 | $180 | $405 | $275 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 35 SF | $150 | $143 | $105 | $385 | $275 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 11 CY | $1,000 | $1,278 | $800 | $930 | $700 |
| 848E50000 HAND CHIPPING | 60 SY | $130 | $169 | $76.00 | $170 | $100 |
| 848E50100 TEST SLAB | 1 LS | $5,500 | $4,185 | $2,500 | $100 | $500 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $10,000 | $9,143 | $25,000 | $3,375 | $15,000 |
| 848E50200 FULL-DEPTH REPAIR | 6 CY | $1,000 | $1,068 | $1,400 | $4,700 | $800 |
| 202E23500 WEARING COURSE REMOVED (T=1.25") | 756 SY | $13.00 | $6.27 | $15.00 | $14.00 | $18.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: USING DOW | 49 FT | $100 | $56.93 | $135 | $84.00 | $302 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 63 SF | $125 | $143 | $180 | $405 | $276 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 63 SF | $125 | $143 | $105 | $385 | $276 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 19 CY | $1,000 | $1,278 | $800 | $930 | $700 |
| 848E50000 HAND CHIPPING | 60 SY | $130 | $169 | $76.00 | $170 | $100 |
| 848E50100 TEST SLAB | 1 LS | $5,500 | $4,185 | $2,500 | $100 | $500 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $15,000 | $8,980 | $15,000 | $3,360 | $15,000 |
| 848E50200 FULL-DEPTH REPAIR | 4 CY | $1,000 | $1,068 | $1,400 | $4,700 | $800 |
| 202E23500 WEARING COURSE REMOVED (T=1.75") | 424 SY | $15.00 | $11.68 | $20.00 | $28.50 | $26.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 130 FT | $25.00 | $17.16 | $31.00 | $35.00 | $49.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 154 SF | $125 | $143 | $180 | $405 | $276 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 154 SF | $125 | $143 | $105 | $385 | $276 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 28 CY | $1,000 | $1,278 | $800 | $930 | $700 |
| 848E50000 HAND CHIPPING | 64 SY | $130 | $169 | $80.00 | $295 | $100 |
| 848E50100 TEST SLAB | 1 LS | $5,500 | $4,185 | $2,500 | $100 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 3 CY | $3,000 | $1,068 | $1,400 | $4,700 | $300 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 150 FT | $120 | $118 | $112 | $111 | $137 |
| 202E23500 WEARING COURSE REMOVED (T=1.75") | 424 SY | $15.00 | $11.68 | $20.00 | $28.50 | $26.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 130 FT | $25.00 | $17.16 | $31.00 | $35.00 | $48.00 |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 424 SY | $75.00 | $111 | $125 | $130 | $98.00 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 18 CY | $1,000 | $1,278 | $800 | $930 | $700 |
| 848E50000 HAND CHIPPING | 55 SY | $130 | $169 | $80.00 | $295 | $100 |
| 848E50100 TEST SLAB | 1 LS | $5,500 | $4,185 | $2,500 | $100 | $500 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 150 FT | $120 | $118 | $112 | $111 | $137 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,000 | $1,068 | $1,400 | $4,700 | $800 |
| 202E23500 WEARING COURSE REMOVED (T=1.25") | 654 SY | $14.00 | $7.83 | $18.00 | $18.50 | $20.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: USING DOW | 48 FT | $100 | $56.91 | $135 | $85.00 | $218 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 26.5 SF | $150 | $143 | $180 | $405 | $276 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 26.5 SF | $150 | $143 | $105 | $385 | $276 |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 25 CY | $1,000 | $1,278 | $800 | $930 | $700 |
| 848E50000 HAND CHIPPING | 45 SY | $130 | $169 | $76.00 | $225 | $100 |
| 848E50100 TEST SLAB | 1 LS | $5,500 | $4,185 | $2,500 | $100 | $500 |
| 202E38500 BRIDGE RAILING REMOVED | 400 FT | $6.50 | $5.88 | $5.60 | $12.25 | $7.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,001 LB | $2.00 | $2.20 | $2.20 | $2.50 | $3.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 1,120 EACH | $23.00 | $25.31 | $18.00 | $30.00 | $63.00 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $10,000 | $4,680 | $25,000 | $29,250 | $25,000 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 5,253 FT | $3.00 | $2.65 | $2.10 | $3.00 | $4.00 |
| 848E50200 FULL-DEPTH REPAIR | 3 CY | $1,000 | $1,068 | $1,400 | $4,700 | $800 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $28,000 | $26,431 | $14,000 | $25,000 | $28,000 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $15.00 | $10.50 | $10.00 | $15.00 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 26 EACH | $15.00 | $12.60 | $12.00 | $25.00 | $15.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,510 SY | $52 | $131k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $115,000 | $115k | 6% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 978 SY | $107 | $105k | 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 654 SY | $145 | $95k | 5% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 756 SY | $120 | $91k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $82,500 | $83k | 4% |
| 614E22326 WORK ZONE EDGE LINE, CLASS I, 6", 873 | 5.14 MILE | $15,000 | $77k | 4% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 424 SY | $165 | $70k | 3% |
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 424 SY | $165 | $70k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 110 CY | $550 | $61k | 3% |