HIG-SR 73/SR 785-10.72/00.00
HIG County · est $3.7M
Bid dateThursday, November 14—
HIG County · est $3.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1Brown County Asphalt INC | R2Fillmore Construction | R3Shelly Company | R4John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10,503 CY | $188 | $189 | $186 | $227 | 62% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 252,091 SY | $1.00 | $1.50 | $1.24 | $1.82 | 8% |
| 254E01600 PATCHING PLANED SURFACE | 50,271 SY | $2.50 | $1.00 | $2.75 | $1.78 | 4% |
| 644E00104 EDGE LINE, 6" | 32.51 MILE | $3,865 | $3,750 | $3,750 | $4,300 | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 4,000 SY | $28.00 | $30.00 | $28.25 | $37.75 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $57,985 | $240,000 | $57,226 |
| Item | Quantity | R1Brown County Asphalt INC | R2Fillmore Construction | R3Shelly Company | R4John R Jurgensen Company |
|---|---|---|---|---|---|
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 558 SY | $1.00 | $1.50 | $1.24 | $1.79 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 19 CY | $188 | $192 | $186 | $236 |
| 617E25000 WATER | 11.38 MGAL | $1.00 | $1.00 | $8.00 | $20.69 |
| 644E00500 STOP LINE | 104 FT | $26.20 | $10.55 | $10.55 | $15.00 |
| 646E10010 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3% |
| 407E20000 NON-TRACKING TACK COAT | 22,738 GAL | $3.50 | $3.50 | $3.90 | $4.00 | 3% |
| 644E00300 CENTER LINE | 16.27 MILE | $4,185 | $4,521 | $4,521 | $5,090 | 2% |
| 621E00100 RPM | 2,171 EACH | $29.15 | $36.70 | $36.00 | $29.15 | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 65.26 MILE | $910 | $555 | $555 | $865 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $90,000 | $94,000 | $100,000 | 2% |
| 617E10100 COMPACTED AGGREGATE | 473 CY | $80.00 | $100 | $100 | $139 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 32.63 MILE | $995 | $1,010 | $1,010 | $1,706 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.02 MILE | $4,000 | $5,000 | $3,350 | $5,744 | 1% |
| 897E01020 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS B, 3/8" | 294 SY | $53.50 | $30.00 | $43.00 | $27.90 | 0% |
| 209E60500 LINEAR GRADING | 9.67 MILE | $1,500 | $3,250 | $1,650 | $1,270 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,406 | $15,140 | $10,000 | $10,961 | 0% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 7.02 MILE | $1,000 | $1,000 | $975 | $975 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2,171 EACH | $2.50 | $10.00 | $12.50 | $12.17 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 44 EACH | $96.16 | $120 | $100 | $100 | 0% |
| 0.02 MILE |
| $117,720 |
| $65,000 |
| $65,000 |
| $182,250 |
| 646E10200 CENTER LINE | 0.01 MILE | $157,155 | $110,000 | $110,000 | $240,000 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 78 FT | $5.70 | $3.00 | $3.00 | $10.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 76 FT | $35.50 | $35.50 | $35.50 | $35.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 88 FT | $35.50 | $35.50 | $35.50 | $35.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 64 FT | $35.50 | $35.50 | $35.50 | $35.50 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 54 FT | $35.50 | $35.50 | $35.50 | $35.50 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $2,500 | $3,500 | $3,126 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10,503 CY | $188 | $1.97M | 62% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 252,091 SY | $1 | $252k | 8% |
| 254E01600 PATCHING PLANED SURFACE | 50,271 SY | $2.5 | $126k | 4% |
| 644E00104 EDGE LINE, 6" | 32.51 MILE | $3,865 | $126k | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 4,000 SY | $28 | $112k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $100k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 22,738 GAL | $3.5 | $80k | 2% |
| 644E00300 CENTER LINE | 16.27 MILE | $4,185 | $68k | 2% |
| 621E00100 RPM | 2,171 EACH | $29.15 | $63k | 2% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 65.26 MILE | $910 | $59k | 2% |