BUT-SR 122-02.70
BUT County · est $2.1M
Bid dateThursday, December 5—
BUT County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 99 more items below.
| Item | Quantity | R1Kelchner INC | R2Barrett Paving Materials INC | R3Rack & Ballauer Excavating CO INC | R4Eagle Bridge CO | R5John R Jurgensen Company | R6Sunesis Construction CO | R7Performance Site Development | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 898 CY | $200 | $170 | $190 | $190 | $190 | $191 | $225 | 15% |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 948 SY | $150 | $136 | $160 | $145 | $142 | $139 | $115 | 12% |
| 204E30020 |
| Item | Quantity | R1Kelchner INC | R2Barrett Paving Materials INC | R3Rack & Ballauer Excavating CO INC | R4Eagle Bridge CO | R5John R Jurgensen Company | R6Sunesis Construction CO | R7Performance Site Development |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $18,500 | $15,000 | $10,000 | $23,598 | $25,591 | $44,100 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 297 FT | $19.00 | $15.00 | $19.00 | $10.00 | $38.25 | $16.78 | $35.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2,018 CY |
| $58.00 |
| $75.00 |
| $51.00 |
| $60.00 |
| $59.07 |
| $83.36 |
| $84.00 |
| 10% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 188 CY | $380 | $240 | $270 | $355 | $355 | $357 | $355 | 6% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 220 CY | $320 | $220 | $260 | $300 | $300 | $302 | $306 | 6% |
| 638E11608 SPECIAL - 12" WATER MAIN DIP AND FITTINGS (2.01,3. | 411 FT | $160 | $150 | $157 | $190 | $200 | $190 | $209 | 6% |
| 203E10000 EXCAVATION | 3,176 CY | $20.00 | $20.00 | $24.00 | $19.00 | $23.76 | $20.12 | $27.00 | 5% |
| 304E20000 AGGREGATE BASE | 1,070 CY | $50.00 | $75.00 | $66.00 | $85.00 | $74.23 | $97.96 | $71.00 | 5% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 1,497 FT | $33.00 | $30.00 | $34.00 | $38.00 | $33.00 | $35.60 | $28.75 | 4% |
| 625E10490 LIGHT POLE, CONVENTIONAL, 30' | 11 EACH | $3,700 | $3,450 | $3,600 | $3,450 | $2,870 | $3,625 | $4,860 | 3% |
| 638E11604 SPECIAL - 8" WATER MAIN DIP AND FITTINGS (2.01,3.0 | 412 FT | $95.00 | $80.00 | $109 | $125 | $110 | $104 | $124 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $38,000 | $40,000 | $40,000 | $85,000 | $40,000 | $81,575 | $28,500 | 3% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 14 EACH | $2,600 | $1,850 | $2,505 | $1,891 | $1,575 | $2,522 | $3,380 | 3% |
| 638E11606 SPECIAL - 10" WATER MAIN DIP AND FITTINGS (2.01, 3 | 265 FT | $120 | $105 | $119 | $150 | $164 | $124 | $149 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,881 FT | $16.00 | $14.00 | $12.00 | $12.50 | $23.13 | $13.15 | $18.90 | 3% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 609E33000 CURB, TYPE 10 | 929 FT | $31.00 | $23.00 | $33.00 | $32.00 | $25.90 | $29.67 | $47.50 | 2% |
| 202E23000 PAVEMENT REMOVED | 3,263 SY | $8.00 | $4.50 | $6.20 | $11.00 | $6.75 | $7.07 | $14.00 | 2% |
| 638E06709 24" STEEL PIPE ENCASEMENT, OPEN CUT, AS PER PLAN | 119 FT | $215 | $170 | $360 | $300 | $216 | $299 | $260 | 2% |
| 611E98150 CATCH BASIN, NO. 3 | 5 EACH | $4,700 | $5,450 | $5,400 | $4,250 | $3,346 | $5,250 | $4,005 | 2% |
| 315 FT |
| $6.25 |
| $2.40 |
| $6.00 |
| $5.00 |
| $2.50 |
| $6.04 |
| $2.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $260 | $165 | $250 | $350 | $200 | $252 | $179 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $1,050 | $850 | $485 | $250 | $560 | $491 | $475 |
| 202E98100 REMOVAL MISC.: BOULDER | 3 EACH | $155 | $50.00 | $15.00 | $40.00 | $529 | $201 | $420 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $203 | $350 | $250 | $250 | $560 | $137 | $300 |
| 202E98100 REMOVAL MISC.: POLE | 2 EACH | $400 | $250 | $100 | $250 | $250 | $213 | $300 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $23.00 | $10.00 | $20.00 | $15.00 | $35.07 | $20.66 | $45.00 |
| 203E20000 EMBANKMENT | 1,882 CY | $8.00 | $15.00 | $13.00 | $13.00 | $12.26 | $13.68 | $14.00 |
| 204E10000 SUBGRADE COMPACTION | 6,332 SY | $2.50 | $1.00 | $2.60 | $2.50 | $2.10 | $4.34 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,018 CY | $11.00 | $22.00 | $24.00 | $24.00 | $37.99 | $27.03 | $29.00 |
| 204E20001 EMBANKMENT, AS PER PLAN | 504 CY | $5.25 | $40.00 | $18.00 | $13.00 | $53.48 | $13.04 | $15.00 |
| 204E30041 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 46 CY | $130 | $118 | $150 | $125 | $139 | $120 | $98.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $130 | $225 | $200 | $400 | $236 | $233 | $180 |
| 204E50000 GEOTEXTILE FABRIC | 6,052 SY | $1.45 | $2.00 | $1.05 | $1.20 | $1.58 | $1.10 | $3.70 |
| 606E15050 GUARDRAIL, TYPE MGS | 175 FT | $26.00 | $25.00 | $25.00 | $22.00 | $22.00 | $25.17 | $26.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,600 | $2,520 | $2,500 | $2,550 | $2,550 | $2,517 | $2,940 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 9 EACH | $750 | $1,000 | $600 | $1,098 | $1,121 | $1,037 | $450 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 6 EACH | $250 | $265 | $245 | $175 | $507 | $302 | $185 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $4,000 | $16,500 | $15,000 | $12,500 | $11,808 | $4,279 | $16,700 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,600 | $34,500 | $20,000 | $40,000 | $38,466 | $14,800 | $19,450 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 5 FT | $150 | $150 | $35.00 | $75.00 | $106 | $26.05 | $129 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $200 | $175 | $105 | $125 | $283 | $162 | $465 |
| 659E00300 TOPSOIL | 462 CY | $13.00 | $40.00 | $52.00 | $15.00 | $34.30 | $58.40 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 4,166 SY | $1.50 | $1.10 | $0.83 | $1.50 | $1.09 | $4.61 | $2.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.58 TON | $1,200 | $900 | $1,150 | $1,000 | $900 | $1,158 | $821 |
| 659E31000 LIME | 0.86 ACRE | $215 | $75.00 | $200 | $75.00 | $75.00 | $201 | $55.00 |
| 659E35000 WATER | 23.1 MGAL | $5.00 | $1.00 | $5.00 | $2.00 | $1.00 | $5.03 | $55.00 |
| 670E00500 SLOPE EROSION PROTECTION | 300 SY | $2.00 | $2.85 | $2.00 | $3.00 | $2.85 | $2.01 | $2.20 |
| 670E00700 DITCH EROSION PROTECTION | 530 SY | $2.00 | $2.85 | $2.00 | $3.00 | $2.85 | $2.01 | $2.20 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,500 | $2,000 | $1,500 | $3,000 | $2,275 | $2,291 | $4,750 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,900 | $8,000 | $8,000 | $9,000 | $3,700 | $5,074 | $9,950 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,000 | $12,000 | $12,000 | $13,000 | $11,196 | $11,273 | $11,150 |
| 602E20000 CONCRETE MASONRY | 1.8 CY | $5,000 | $1,850 | $3,000 | $2,500 | $3,762 | $4,067 | $2,995 |
| 611E00400 4" CONDUIT, TYPE E | 50 FT | $16.00 | $20.00 | $5.00 | $10.00 | $33.74 | $21.75 | $48.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 128 FT | $25.00 | $25.00 | $32.00 | $22.00 | $43.23 | $43.86 | $22.00 |
| 611E04400 12" CONDUIT, TYPE B | 68 FT | $87.00 | $60.00 | $88.00 | $120 | $115 | $90.40 | $89.95 |
| 611E04900 12" CONDUIT, TYPE D | 255 FT | $82.00 | $30.00 | $81.00 | $55.00 | $79.41 | $71.06 | $82.00 |
| 611E06100 15" CONDUIT, TYPE C | 134 FT | $80.00 | $50.00 | $86.00 | $70.00 | $96.83 | $74.89 | $85.00 |
| 611E08900 21" CONDUIT, TYPE B | 34 FT | $105 | $85.00 | $128 | $155 | $151 | $120 | $165 |
| 611E09100 21" CONDUIT, TYPE C | 25 FT | $120 | $85.00 | $108 | $165 | $131 | $140 | $162 |
| 611E10400 24" CONDUIT, TYPE B | 79 FT | $104 | $80.00 | $130 | $125 | $157 | $137 | $165 |
| 611E10600 24" CONDUIT, TYPE C | 21 FT | $85.00 | $80.00 | $124 | $150 | $146 | $180 | $162 |
| 611E23800 60" CONDUIT, TYPE B | 6 FT | $725 | $625 | $875 | $1,000 | $1,280 | $967 | $1,100 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 10 FT | $60.00 | $25.00 | $50.00 | $50.00 | $54.10 | $164 | $45.00 |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $2,800 | $3,700 | $3,700 | $3,250 | $2,379 | $3,409 | $3,155 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $13,000 | $3,750 | $3,350 | $3,500 | $2,864 | $3,941 | $6,500 |
| 611E98450 CATCH BASIN, NO. 2-2A | 2 EACH | $2,900 | $3,600 | $1,460 | $2,500 | $1,647 | $3,257 | $1,575 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,900 | $3,100 | $2,950 | $2,750 | $2,498 | $3,194 | $2,335 |
| 611E98571 CATCH BASIN, NO. 2-5, AS PER PLAN | 1 EACH | $9,000 | $7,450 | $6,600 | $6,000 | $4,851 | $8,719 | $7,075 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $150 | $325 | $300 | $275 | $644 | $386 | $750 |
| 611E99720 INSPECTION WELL | 1 EACH | $600 | $800 | $500 | $2,000 | $1,465 | $1,920 | $750 |
| 407E20000 NON-TRACKING TACK COAT | 491 GAL | $5.25 | $3.75 | $4.00 | $5.00 | $5.00 | $5.03 | $7.60 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $1,050 | $515 | $345 | $1,000 | $1,000 | $1,007 | $1,600 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 143 SY | $78.00 | $73.00 | $90.00 | $80.00 | $80.54 | $73.50 | $106 |
| 609E26000 CURB, TYPE 6 | 416 FT | $30.00 | $23.00 | $33.00 | $27.00 | $26.22 | $30.43 | $34.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 346 FT | $30.00 | $25.00 | $33.00 | $34.00 | $28.23 | $33.92 | $52.00 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN | 168 FT | $33.00 | $28.00 | $36.00 | $37.00 | $31.94 | $37.20 | $72.00 |
| 202E75611 VALVE BOX REMOVED, AS PER PLAN | 4 EACH | $150 | $185 | $300 | $250 | $296 | $137 | $295 |
| 638E04801 3/4" COPPER SERVICE BRANCH, AS PER PLAN | 120 FT | $89.00 | $65.00 | $160 | $40.00 | $78.52 | $73.14 | $85.00 |
| 638E10501 FIRE HYDRANT REMOVED AND RESET, AS PER PLAN | 1 EACH | $4,000 | $5,200 | $4,150 | $3,500 | $1,225 | $6,678 | $3,950 |
| 638E20538 SPECIAL - 6" GATE VALVE WITH VALVE BOX (2.05,3.04) | 1 EACH | $2,800 | $1,850 | $1,450 | $2,000 | $4,180 | $2,493 | $2,450 |
| 638E20570 SPECIAL - 10" GATE VALVE WITH VALVE BOX (2.05,3.04 | 1 EACH | $5,200 | $3,640 | $3,200 | $4,250 | $5,241 | $5,227 | $5,395 |
| 638E20586 SPECIAL - 12" GATE VALVE WITH VALVE BOX (2.05,3.04 | 3 EACH | $6,100 | $4,465 | $3,950 | $5,250 | $6,205 | $6,599 | $5,900 |
| 638E98000 WATER WORK, MISC.: 3/4" CURB VALVE & BOX (2.08,3.0 | 1 EACH | $750 | $675 | $230 | $2,250 | $1,019 | $404 | $440 |
| 638E98000 WATER WORK, MISC.: CONNECT TO EX. WATER MAIN | 4 EACH | $4,000 | $6,000 | $5,650 | $2,000 | $3,535 | $4,634 | $4,250 |
| 638E98000 WATER WORK, MISC.: INSTALL 3/4" METER SETTING, COM | 5 EACH | $4,000 | $5,300 | $2,100 | $1,150 | $2,104 | $2,037 | $4,650 |
| 638E98600 WATER WORK, MISC.: 2" PVC CASING | 60 FT | $15.00 | $70.00 | $200 | $65.00 | $41.66 | $14.66 | $45.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 14 EACH | $180 | $105 | $175 | $105 | $115 | $176 | $238 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 28 EACH | $180 | $105 | $175 | $105 | $115 | $176 | $238 |
| 625E10490 LIGHT POLE, CONVENTIONAL, 28' | 3 EACH | $3,600 | $3,200 | $3,430 | $3,200 | $2,535 | $3,453 | $4,635 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 783 FT | $3.75 | $4.00 | $3.55 | $4.00 | $4.00 | $3.57 | $4.80 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,692 FT | $2.00 | $2.00 | $2.05 | $2.00 | $1.90 | $2.06 | $2.75 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,109 FT | $12.00 | $12.00 | $11.50 | $12.00 | $11.25 | $11.58 | $15.55 |
| 625E25506 CONDUIT, 3", 725.052 | 231 FT | $14.00 | $16.00 | $13.65 | $16.00 | $8.50 | $13.74 | $18.40 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 14 EACH | $400 | $350 | $380 | $350 | $605 | $383 | $515 |
| 625E29002 TRENCH, 24" DEEP | 1,109 FT | $14.50 | $12.00 | $14.25 | $12.00 | $12.75 | $14.35 | $19.20 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $1,200 | $1,000 | $1,133 | $1,000 | $1,090 | $1,141 | $1,530 |
| 625E32000 GROUND ROD | 15 EACH | $300 | $275 | $282 | $275 | $470 | $284 | $380 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $14,000 | $8,169 | $13,860 | $8,169 | $14,750 | $13,955 | $18,720 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,340 FT | $1.75 | $2.70 | $1.60 | $2.70 | $1.70 | $1.61 | $2.15 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $15.50 | $11.50 | $15.00 | $12.50 | $12.50 | $15.10 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 559 FT | $14.00 | $14.50 | $13.50 | $14.50 | $14.50 | $13.59 | $15.70 |
| 630E08600 SIGN POST REFLECTOR | 5 EACH | $45.00 | $50.00 | $44.00 | $50.00 | $50.00 | $44.30 | $54.00 |
| 630E80100 SIGN, FLAT SHEET | 231 SF | $19.00 | $18.00 | $18.25 | $18.00 | $18.00 | $18.37 | $19.45 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 17 EACH | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.10 | $16.25 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 12 EACH | $26.00 | $20.00 | $25.00 | $20.00 | $20.00 | $25.17 | $21.65 |
| 644E00104 EDGE LINE, 6" | 0.35 MILE | $11,000 | $10,631 | $9,205 | $10,631 | $10,631 | $9,268 | $11,485 |
| 644E00300 CENTER LINE | 0.12 MILE | $15,500 | $15,005 | $12,530 | $15,005 | $15,005 | $12,616 | $16,205 |
| 644E01520 DOTTED LINE, 12" | 144 FT | $3.75 | $3.50 | $2.20 | $3.50 | $3.50 | $2.22 | $3.80 |
| 644E20800 YIELD LINE | 77 FT | $26.00 | $25.00 | $9.95 | $25.00 | $25.00 | $10.02 | $27.00 |
| 661E19000 DECIDUOUS SHRUB, 12" HEIGHT, RHUS ARMOATICA | 37 EACH | $45.00 | $95.00 | $60.00 | $105 | $105 | $60.41 | $43.00 |
| 661E50040 EVERGREEN TREE, 2' HEIGHT, PINUS MUGO | 16 EACH | $250 | $225 | $240 | $255 | $255 | $242 | $335 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $16,990 | $18,000 | $20,000 | $16,990 | $22,018 | $18,350 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $9,000 | $12,000 | $20,000 | $8,425 | $0.01 | $42,400 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $42,000 | $10,000 | $8,500 | $12,548 | $8,786 | $28,850 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $5,000 | $1,450 | $1,500 | $2,500 | $2,283 | $1,448 | $6,100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $18,000 | $45,000 | $30,000 | $25,000 | $9,733 | $25,372 | $34,700 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 898 CY | $200 | $180k | 10% |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 948 SY | $150 | $142k | 8% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,018 CY | $58 | $117k | 7% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 188 CY | $380 | $71k | 4% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 220 CY | $320 | $70k | 4% |
| 638E11608 SPECIAL - 12" WATER MAIN DIP AND FITTINGS (2.01,3. | 411 FT | $160 | $66k | 4% |
| 203E10000 EXCAVATION | 3,176 CY | $20 | $64k | 4% |
| 304E20000 AGGREGATE BASE | 1,070 CY | $50 | $54k | 3% |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 1,497 FT | $33 | $49k | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, 30' | 11 EACH | $3,700 | $41k | 2% |