| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC | % of bid |
|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,800 CY | $189 | $180 | 22% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,950 CY | $219 | $208 | 18% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 2,038 CY | $197 | $190 | 17% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 870 CY | $225 | $350 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $158,450 | $248,400 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $135,000 | $100,000 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.5") | 46,668 SY | $2.00 | $2.15 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(3.0") | 56,970 SY | $1.20 | $1.50 | 3% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 29 EACH | $2,200 | $1,400 | 3% |
| 608E52000 CURB RAMP | 4,384 SF | $10.00 | $10.00 | 2% |
| 253E02000 PAVEMENT REPAIR | 165 CY | $240 | $450 | 2% |
| 608E10000 4" CONCRETE WALK | 3,772 SF | $10.00 | $10.00 | 2% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 2,869 SY | $12.17 | $12.17 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 44 EACH | $688 | $800 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 11,171 GAL | $2.65 | $3.15 | 1% |
| 202E30000 WALK REMOVED | 8,196 SF | $3.50 | $3.50 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 24 EACH | $1,145 | $1,400 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,859 GAL | $4.75 | $4.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 713 CY | $30.00 | $50.00 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 7 EACH | $2,850 | $2,850 | 1% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 3 SY | $50.00 | $50.00 |
| 202E32000 CURB REMOVED | 839 FT | $15.00 | $15.00 |
| 202E32500 CURB AND GUTTER REMOVED | 117 FT | $15.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 312.5 FT | $2.00 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 7 EACH | $295 | $295 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $90.00 | $90.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $75.00 | $75.00 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $25.00 | $25.00 |
| 203E20001 EMBANKMENT, AS PER PLAN(CURB RAMPS) | 32 CY | $55.00 | $55.00 |
| 203E20001 EMBANKMENT, AS PER PLAN(GUARDRAIL) | 76 CY | $76.50 | $76.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 6.9 STA | $90.00 | $90.00 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 22.01 STA | $100 | $100 |
| 209E60200 LINEAR GRADING | 3.02 STA | $2,600 | $5,500 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 7.33 MILE | $2,600 | $2,500 |
| 209E80000 GRADING MAILBOX APPROACHES | 38 EACH | $30.00 | $100 |
| 606E15050 GUARDRAIL, TYPE MGS | 62.5 FT | $28.00 | $28.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $31.20 | $31.20 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 175 FT | $17.40 | $17.40 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,480 | $1,480 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $1,285 | $1,285 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 76 FT | $50.00 | $50.00 |
| 609E26000 CURB, TYPE 6 | 296 FT | $50.00 | $50.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 13 EACH | $685 | $800 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 4 EACH | $1,150 | $1,400 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $3,000 | $2,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 5 EACH | $185 | $185 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $2,850 | $2,850 |
| 611E99155 INLET RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $6,500 | $6,500 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 600 LB | $5.00 | $5.00 |
| 254E01600 PATCHING PLANED SURFACE | 5,182 SY | $1.25 | $3.00 |
| 617E20000 SHOULDER PREPARATION | 3,547 SY | $0.25 | $0.30 |
| 621E00100 RPM | 345 EACH | $39.75 | $39.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 322 EACH | $8.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 42 EACH | $12.00 | $12.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 9.54 MILE | $825 | $825 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.48 MILE | $700 | $700 |
| 642E00300 CENTER LINE, TYPE 1 | 5.69 MILE | $1,100 | $1,000 |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 43 FT | $4.00 | $4.00 |
| 644E00404 CHANNELIZING LINE, 12" | 426 FT | $1.50 | $1.50 |
| 644E00500 STOP LINE | 671 FT | $6.00 | $6.00 |
| 644E00620 CROSSWALK LINE, 12" | 1,750 FT | $3.95 | $3.95 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 55 FT | $6.00 | $6.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $500 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $500 | $500 |
| 644E01300 LANE ARROW | 13 EACH | $90.00 | $90.00 |
| 646E10110 LANE LINE, 6" | 0.18 MILE | $8,000 | $8,000 |
| 646E10200 CENTER LINE | 0.09 MILE | $17,500 | $17,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $95.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,500 | $3,500 |
| 614E12460 WORK ZONE MARKING SIGN | 67 EACH | $65.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 75 CY | $125 | $225 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $900 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.93 MILE | $600 | $600 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 15.06 MILE | $975 | $975 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 929 FT | $0.60 | $0.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 384 FT | $1.50 | $3.50 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 1,057 FT | $1.00 | $2.60 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 30 EACH | $20.00 | $40.00 |
| 900E00100 RAILROAD FLAGGING SERVICES | 10,000 EACH | $1.00 | $1.00 |
| 202E98200 REMOVAL MISC.: EXISTING JOINT SEAL | 105 FT | $5.85 | $5.85 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 105 FT | $26.04 | $26.04 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 566 SY | $14.85 | $14.85 |
| 516E31000 JOINT SEALER | 105 FT | $26.04 | $26.04 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 117 SF | $94.21 | $94.21 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 50 FT | $136 | $136 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 90 FT | $26.13 | $26.13 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $8,000 | $5,100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,000 | $12,500 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20171 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,800 CY | $189 | $529k | 19% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,950 CY | $219 | $427k | 16% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 2,038 CY | $197 | $401k | 15% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 870 CY | $225 | $196k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $158,450 | $158k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $135,000 | $135k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.5") | 46,668 SY | $2 | $93k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(3.0") | 56,970 SY | $1.2 | $68k | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 29 EACH | $2,200 | $64k | 2% |
| 608E52000 CURB RAMP | 4,384 SF | $10 | $44k | 2% |