How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$345
$375
642E01352TWO WAY LEFT TURN ARROW, TYPE 1
11 EACH
$100
$110
642E01410WORD ON PAVEMENT, 96", TYPE 1
4 EACH
$64.00
$125
642E01500DOTTED LINE, 4", TYPE 1
3,192 FT
$1.00
$1.05
642E01602BIKE LANE SYMBOL MARKING, TYPE 1
4 EACH
$90.00
$100
642E20802YIELD LINE, TYPE 1
300 FT
$5.00
$8.25
642E30000REMOVAL OF PAVEMENT MARKING
100 FT
$5.00
$10.00
642E30020REMOVAL OF PAVEMENT MARKING
5 EACH
$350
$185
642E50010PAVEMENT MARKING, MISC.: FOURTEEN (14) DAY WORK OR
8 EACH
$500
$2,000
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
40 HOUR
$55.00
$40.00
643E00300CENTER LINE
354 MILE
$900
$319k
17%
643E00105EDGE LINE, 6", AS PER PLAN
119 MILE
$1,274
$152k
8%
642E00104EDGE LINE, 6", TYPE 1
200 MILE
$625
$125k
6%
642E01322WRONG WAY ARROW, TYPE 1
200 EACH
$280
$56k
3%
614E11000MAINTAINING TRAFFIC
1 LS
$50,000
$50k
3%
643E00204LANE LINE, 6"
63 MILE
$520
$33k
2%
642E00300CENTER LINE, TYPE 1
100 MILE
$325
$33k
2%
642E50010PAVEMENT MARKING, MISC.: SEVENTY TWO (72) HOUR WOR