MIA-/MER-IR 75/SR 119-16.91/13.74
MIA County · est $0.6M
Bid dateThursday, April 18—
MIA County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Advanced Excavating & Demolition LLC | R3Fenson Contracting LLC | % of bid |
|---|---|---|---|---|---|
| 833E10001 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 118 FT | $775 | $640 | $750 | 22% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" STRUCTURAL PLA | 358 FT | $208 | $310 | $422 | 18% |
| 203E20000 EMBANKMENT | 310.5 CY | $118 | $45.00 | $130 | 9% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 466 FT | $62.11 | $100 | $150 | 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,585 | $13,500 | $25,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,236 | $50,000 | $85,000 | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 975 FT | $19.74 |
| Item | Quantity | R1Bcc Ohio INC | R2Advanced Excavating & Demolition LLC | R3Fenson Contracting LLC |
|---|---|---|---|---|
| 201E20010 SPECIAL - TREE REMOVED, 4"-12" | 12 EACH | $257 | $450 | $500 |
| 201E26450 SPECIAL - STUMP REMOVED, 4"-12" | 12 EACH | $257 | $450 | $500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 60 FT | $25.74 | $25.00 | $100 |
| 202E38000 GUARDRAIL REMOVED | 1,072.5 FT | $2.10 | $2.00 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $362 | $345 | $385 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $18.80 |
| $21.00 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $17,650 | $40,000 | $20,000 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,446 | $15,000 | $7,500 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE ENCHRP 350/MASH | 4 EACH | $2,793 | $2,660 | $3,000 | 3% |
| 611E98301 CATCH BASIN, NO. 5, AS PER PLAN | 1 EACH | $10,954 | $8,000 | $12,000 | 3% |
| 611E08900 21" CONDUIT, TYPE B, 707.12 | 35 FT | $306 | $260 | $500 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 500 FT | $20.00 | $50.00 | $44.00 | 2% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 37 CY | $258 | $230 | $400 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,595 | $15,000 | $12,500 | 2% |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 337 LB | $22.15 | $25.50 | $30.00 | 2% |
| 304E20000 AGGREGATE BASE | 48 CY | $148 | $130 | $125 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,696 | $12,000 | $25,000 | 1% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $2,447 | $2,330 | $2,600 | 1% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 18.5 CY | $258 | $230 | $400 | 1% |
| 2 EACH |
| $99.75 |
| $95.00 |
| $100 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 2 EACH | $131 | $125 | $150 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $680 | $850 | $4,000 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 74 FT | $46.14 | $100 | $65.00 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 81 FT | $4.20 | $4.00 | $5.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,407 | $1,340 | $1,500 |
| 607E23001 FENCE, TYPE CLT, AS PER PLAN | 54 FT | $59.85 | $57.00 | $65.00 |
| 607E23005 FENCE REBUILT, TYPE CLT, AS PER PLAN | 27 FT | $56.70 | $54.00 | $60.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,065 | $2,210 | $2,500 |
| 659E00300 TOPSOIL | 66 CY | $48.24 | $70.00 | $100 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 599 SY | $5.20 | $4.95 | $5.25 |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 500 SY | $4.88 | $4.65 | $5.25 |
| 659E00590 SEEDING AND MULCHING, CLASS 6 | 157 SY | $5.78 | $5.50 | $5.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 63 SY | $1.05 | $2.00 | $1.00 |
| 659E15000 INTER-SEEDING | 63 SY | $1.00 | $0.10 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $3,680 | $3,505 | $1,500 |
| 659E31000 LIME | 0.26 ACRE | $21.00 | $20.00 | $200 |
| 659E35000 WATER | 6.9 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E12200 6" DEEP PIPE UNDERDRAINS | 25 FT | $54.38 | $50.00 | $25.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $89.25 | $80.00 | $135 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 14 EACH | $17.00 | $26.00 | $147 |
| 614E13350 OBJECT MARKER, ONE WAY | 14 EACH | $17.00 | $35.00 | $25.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,030 | $3,500 | $4,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 833E10001 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 118 FT | $774.77 | $91k | 20% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" STRUCTURAL PLA | 358 FT | $208.34 | $75k | 16% |
| 203E20000 EMBANKMENT | 310.5 CY | $118.14 | $37k | 8% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 466 FT | $62.11 | $29k | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $23,585 | $24k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,236 | $21k | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 975 FT | $19.74 | $19k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $17,650 | $18k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,446 | $13k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE ENCHRP 350/MASH | 4 EACH | $2,793 | $11k | 2% |