D04-BH/CR FY2025 (East)
D04 County · est $1.6M
Bid dateThursday, January 16—
D04 County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Marucci & Gaffney Excavating CO | R3Daniel R Schmoldt Enterprises INC | R4S E T INC | % of bid |
|---|---|---|---|---|---|---|
| 837E10000 LINER PIPE, 11'-10" min. X 7'-5" min. RISE, 748.06 | 206 FT | $2,832 | $2,831 | $5,400 | $3,900 | 34% |
| 837E21000 BACKFILL FOR LINER PIPE | 1,060 FT | $235 | $140 | $189 | $29.00 | 15% |
| 837E10000 LINER PIPE 54", 707.85 | 400 FT | $286 | $343 | $620 | $320 | 7% |
| 837E10000 LINER PIPE, 84", 707.35, 707.75, 707.85 | 224 FT | $488 | $743 | $966 | $599 | 6% |
| 837E10000 LINER PIPE, 48", 707.35, 707.75, 707.85 | 304 FT | $239 | $269 | $590 | $270 | 4% |
| 837E10000 LINER PIPE, 96", 707.35, 707.75, 707.85 | 110 FT | $629 | $697 | $1,500 | $670 | 4% |
| Item | Quantity | R1Eclipse CO LLC | R2Marucci & Gaffney Excavating CO | R3Daniel R Schmoldt Enterprises INC | R4S E T INC |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $25,000 | $14,300 | $15,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $5,000 | $12,650 | $7,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $25,000 | $17,600 | $15,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $15,000 | $13,750 | $15,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $68,192 | $64,800 | $20,230 | $200,000 | 4% |
| 837E21000 BACKFILL FOR LINER PIPE | 238 FT | $280 | $141 | $190 | $178 | 4% |
| 837E21000 BACKFILL FOR LINER PIPE | 110 FT | $490 | $305 | $371 | $374 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $52,500 | $100,000 | $144,000 | $234,000 | 3% |
| 837E10000 LINER PIPE, 54", 707.35, 707.75, 707.85 | 132 FT | $345 | $397 | $620 | $320 | 3% |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 276 SF | $114 | $75.00 | $130 | $80.00 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | — | $30,752 | $20,000 | $5,000 | $80,000 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | — | $30,012 | $125,000 | $2,500 | $270,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $26,000 | $13,000 | $74,068 | $23,000 | 2% |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 97 CY | $219 | $270 | $220 | $404 | 1% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", (ATB-307-16.531) | 206 FT | $103 | $20.00 | $60.00 | $14.00 | 1% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", AS PER PLAN | — | $192 | $20.00 | $60.00 | $26.00 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, (ATB-90-20.849) | 1 LS | $17,735 | $30,000 | $2,500 | $77,000 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | — | $17,735 | $12,000 | $2,500 | $77,000 | 1% |
| — |
| $43.00 |
| $144 |
| $60.00 |
| $7.00 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", AS PER PLAN | — | $130 | $22.73 | $60.00 | $22.00 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", AS PER PLAN | — | $57.00 | $19.74 | $60.00 | $9.00 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", AS PER PLAN | — | $77.00 | $205 | $60.00 | $319 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (ATB-90-20.849) | 1 LS | $3,938 | $500 | $2,500 | $10,000 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (TRU-305-16.860) | 1 LS | $3,938 | $4,000 | $3,000 | $9,000 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (TRU-80-12.115) | 1 LS | $3,938 | $2,000 | $4,000 | $10,000 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (TRU-82-12.260) | 1 LS | $3,938 | $500 | $6,000 | $25,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (ATB-90-20.849) | 1 LS | $3,938 | $1,500 | $2,500 | $20,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (TRU-305-16.860) | 1 LS | $3,938 | $100 | $2,500 | $16,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (TRU-80-12.115) | 1 LS | $3,938 | $500 | $2,500 | $16,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (TRU-82-15.260) | 1 LS | $3,938 | $500 | $2,500 | $22,000 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $8,960 | $4,000 | $5,000 | $5,000 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 19 CY | $141 | $150 | $210 | $351 |
| 659E10000 SEEDING AND MULCHING | 1,200 SY | $6.00 | $8.00 | $3.00 | $5.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $4,010 | $2,500 | $3,200 | $4,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 60 FT | $36.00 | $5.00 | $80.00 | $25.00 |
| 605E31100 AGGREGATE DRAINS | 60 FT | $20.00 | $8.00 | $18.00 | $18.00 |
| 611E06100 15" CONDUIT, TYPE C, 707.33 | 20 FT | $185 | $183 | $95.00 | $218 |
| 611E07600 18" CONDUIT, TYPE C, 707.21 | 20 FT | $246 | $200 | $177 | $202 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 60 FT | $37.00 | $20.00 | $15.00 | $16.00 |
| 630E80100 SIGN, FLAT SHEET | 8 SF | $48.00 | $20.00 | $55.00 | $53.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $68.00 | $50.00 | $85.00 | $127 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, (TRU-80-12.115) | 1 LS | $17,682 | $30,000 | $2,500 | $77,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $7,000 | $13,420 | $7,000 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | — | $168 | $20.00 | $60.00 | $20.00 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (ATB-307-16.531) | 1 LS | $3,938 | $2,000 | $7,200 | $7,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (ATB-307-16.531) | 1 LS | $3,938 | $500 | $4,700 | $46,000 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 35 CY | $155 | $200 | $220 | $473 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 1 CY | $1,667 | $500 | $650 | $1,198 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $35.50 | $20.00 | $17.50 | $16.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $48.00 | $20.00 | $55.00 | $53.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $17.00 | $20.00 | $28.00 | $26.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $23.00 | $20.00 | $28.00 | $26.00 |
| 837E10001 LINER PIPE, AS PER PLAN, 12", 707.85 | 32 FT | $325 | $310 | $157 | $206 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 15 SF | $379 | $75.00 | $130 | $183 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $12,500 | $5,000 | $13,200 | $5,000 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (MAH-170-5.903) | 1 LS | $3,938 | $4,000 | $5,000 | $7,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING, (MAH-170-5.903) | 1 LS | $17,682 | $20,000 | $2,000 | $69,000 |
| 503E21300 UNCLASSIFIED EXCAVATION, (MAH-170-5.903) | 1 LS | $3,938 | $500 | $2,800 | $24,000 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 55 CY | $140 | $100 | $2,450 | $448 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $37.00 | $20.00 | $17.50 | $16.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $16.00 | $100 | $55.00 | $53.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 15 SF | $379 | $75.00 | $130 | $183 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $684 | $1,000 | $1,500 | $1,268 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,115 | $24,000 | $16,234 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 837E10000 LINER PIPE, 11'-10" min. X 7'-5" min. RISE, 748.06 | 206 FT | $2,832 | $583k | 29% |
| 837E21000 BACKFILL FOR LINER PIPE | 1,060 FT | $235 | $249k | 12% |
| 837E10000 LINER PIPE 54", 707.85 | 400 FT | $286 | $114k | 6% |
| 837E10000 LINER PIPE, 84", 707.35, 707.75, 707.85 | 224 FT | $488 | $109k | 5% |
| 837E10000 LINER PIPE, 48", 707.35, 707.75, 707.85 | 304 FT | $239 | $73k | 4% |
| 837E10000 LINER PIPE, 96", 707.35, 707.75, 707.85 | 110 FT | $629 | $69k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $68,192 | $68k | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 238 FT | $280 | $67k | 3% |
| 837E21000 BACKFILL FOR LINER PIPE | 110 FT | $490 | $54k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $52,500 | $53k | 3% |