D12-PPM FY2025
D12 County · est $2.1M
Bid dateThursday, January 30—
D12 County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Geauga Highway CO | R2Karvo Companies INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $500,000 | $260,000 | $249,150 | 31% |
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (900 CY | $280 | $319 | $352 | 16% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 641 CY | $245 | $318 | $448 | 10% |
| 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A | 1,091 FT | $125 | $109 | $145 | 8% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 135 CY | $800 | $2,150 | $4,100 | 7% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $3.00 | $1.55 | $2.28 | 6% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 486 SY | $140 |
| Item | Quantity | R1Geauga Highway CO | R2Karvo Companies INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 15 CY | $85.00 | $60.00 | $65.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $500 | $1,000 | $1,225 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $750 | $1,200 | $1,520 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,800 | $1,800 | $2,100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $145 |
| $81.00 |
| 4% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, (1.5") | 15,407 SY | $3.50 | $4.60 | $3.85 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $37,500 | $119,000 | $119,096 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $75.00 | $90.00 | $106 | 2% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 10,500 LB | $2.50 | $1.50 | $2.50 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 100 SY | $200 | $370 | $631 | 1% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 100 SY | $200 | $355 | $636 | 1% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 325 SY | $60.00 | $83.00 | $122 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $10,000 | $10,000 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $850 | $1,500 | $1,695 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 18 EACH | $850 | $1,400 | $1,625 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,191 LB | $6.00 | $2.10 | $0.50 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,916 GAL | $3.75 | $2.75 | $2.75 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $200 | $300 | $125 | 1% |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN |
| 1 EACH |
| $850 |
| $1,500 |
| $3,000 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 1 EACH | $1,800 | $1,800 | $3,200 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: CLEANOUT | 15 EACH | $350 | $300 | $925 |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 50 SY | $180 | $245 | $631 |
| 304E20000 AGGREGATE BASE | 15 CY | $120 | $50.00 | $125 |
| 407E13900 TACK COAT, 702.13 | 1,233 GAL | $3.75 | $2.75 | $5.00 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $600 | $950 | $1,000 |
| 621E00100 RPM | 178 EACH | $50.00 | $54.70 | $79.31 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 134 EACH | $15.00 | $5.00 | $5.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 3.89 MILE | $1,750 | $2,365 | $2,700 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.35 MILE | $750 | $1,000 | $2,300 |
| 646E10100 LANE LINE, 4" | 2.36 MILE | $1,500 | $1,220 | $2,100 |
| 646E10200 CENTER LINE | 1.23 MILE | $4,000 | $6,160 | $4,200 |
| 646E10300 CHANNELIZING LINE, 8" | 695 FT | $1.75 | $1.75 | $1.55 |
| 646E10400 STOP LINE | 259 FT | $15.00 | $12.30 | $12.00 |
| 646E10510 CROSSWALK LINE, 12" | 230 FT | $5.00 | $7.00 | $5.75 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 165 FT | $9.00 | $12.00 | $9.00 |
| 646E20300 LANE ARROW | 11 EACH | $175 | $175 | $166 |
| 646E20502 DOTTED LINE, 4" | 115 FT | $1.00 | $1.70 | $3.80 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,450 | $1,550 | $1,350 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 10 EACH | $185 | $150 | $185 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $900 | $700 | $1,500 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 2.36 MILE | $650 | $515 | $575 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 0.35 MILE | $750 | $620 | $1,400 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 2.36 MILE | $650 | $290 | $570 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.23 MILE | $1,250 | $1,985 | $1,175 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.23 MILE | $1,250 | $940 | $1,100 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.89 MILE | $1,750 | $1,475 | $1,500 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 695 FT | $0.85 | $0.75 | $0.66 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 695 FT | $0.85 | $0.70 | $0.64 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 115 FT | $0.75 | $0.65 | $1.00 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 115 FT | $0.75 | $0.60 | $1.00 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 165 FT | $3.50 | $3.75 | $3.00 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 165 FT | $3.50 | $3.70 | $3.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 259 FT | $3.50 | $4.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 259 FT | $3.50 | $3.95 | $3.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 230 FT | $3.00 | $3.50 | $1.50 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 230 FT | $3.00 | $3.45 | $1.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 11 EACH | $75.00 | $75.00 | $45.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 11 EACH | $75.00 | $70.00 | $45.00 |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 400 SF | $25.00 | $16.00 | $25.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $600 | $800 | $785 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $2,100 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $500,000 | $500k | 29% |
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (900 CY | $280 | $252k | 15% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 641 CY | $245 | $157k | 9% |
| 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A | 1,091 FT | $125 | $136k | 8% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 135 CY | $800 | $108k | 6% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $3 | $97k | 6% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 486 SY | $140 | $68k | 4% |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, (1.5") | 15,407 SY | $3.5 | $54k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $37,500 | $38k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $75 | $30k | 2% |