D08-Bridge Maintenance FY2025
D08 County · est $1.4M
Bid dateThursday, January 30—
D08 County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 81 more items below.
| Item | Quantity | R1Prus Construction Company | R2Complete General Construction Company | R3Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,000 | $150,000 | $31,706 | 11% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 4,465 SF | $30.00 | $40.00 | $65.00 | 11% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 131 FT | $975 | $2,000 | $3,103 | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $100,000 | $130,000 | $82,480 | 8% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 28 CY | $3,000 | $3,000 | $2,502 | 7% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 454 SY | $175 | $110 | $102 | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 454 SY |
| Item | Quantity | R1Prus Construction Company | R2Complete General Construction Company | R3Sunesis Construction CO |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 240 SF | $24.00 | $75.00 | $4.00 |
| 202E38000 GUARDRAIL REMOVED | 325 FT | $3.00 | $2.00 | $7.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 3 EACH | $400 | $325 | $556 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $150 | $110 | $125 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $105 | $75.00 | $125 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $155 |
| $135 |
| $100 |
| 6% |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 8 EACH | $8,500 | $3,820 | $6,478 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 156 CY | $325 | $335 | $335 | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $50,000 | $25,000 | $23,726 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $10,000 | $10,064 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,200 FT | $33.50 | $29.00 | $17.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $88,500 | $80,562 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $35,000 | $35,000 | $40,590 | 3% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $33,000 | $45,000 | $31,267 | 3% |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 176 FT | $185 | $128 | $124 | 3% |
| 516E11801 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT, | 68 FT | $425 | $425 | $333 | 2% |
| 511E43210 CLASS QC1 CONCRETE, PIER | 8 CY | $3,500 | $7,500 | $7,571 | 2% |
| 832E30000 EROSION CONTROL | 24,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.50") | 3,754 SY | $5.00 | $5.50 | $20.00 | 2% |
| 6 STA |
| $75.00 |
| $50.00 |
| $75.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $30.00 | $23.60 | $23.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $3,500 | $2,980 | $2,600 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,750 | $1,475 | $1,250 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $1,825 | $1,520 | $1,250 |
| 608E12000 5" CONCRETE WALK | 240 SF | $35.00 | $50.00 | $21.00 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $15,000 | $13,000 | $2,734 |
| 659E00300 TOPSOIL | 62 CY | $115 | $30.00 | $48.00 |
| 659E10000 SEEDING AND MULCHING | 563 SY | $11.00 | $8.53 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 28 SY | $3.00 | $3.50 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $1,100 | $675 | $1,400 |
| 659E31000 LIME | 0.12 ACRE | $175 | $50.00 | $200 |
| 659E35000 WATER | 3 MGAL | $1.75 | $0.50 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 338 GAL | $12.50 | $5.00 | $5.00 |
| 621E00100 RPM | 2 EACH | $1,400 | $1,120 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $61.00 | $150 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 11 EACH | $15.00 | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 78 FT | $25.00 | $20.00 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $58.00 | $45.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $90.00 | $85.00 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $25.00 | $15.00 | $25.00 |
| 644E00100 EDGE LINE, 4" | 0.24 MILE | $8,500 | $7,340 | $7,340 |
| 644E00200 LANE LINE, 4" | 0.24 MILE | $4,600 | $4,015 | $4,015 |
| 644E00300 CENTER LINE | 0.16 MILE | $14,000 | $11,870 | $11,870 |
| 644E00400 CHANNELIZING LINE, 8" | 225 FT | $2.00 | $1.75 | $2.00 |
| 644E00500 STOP LINE | 85 FT | $9.00 | $7.50 | $8.00 |
| 644E00720 CHEVRON MARKING | 80 FT | $8.50 | $7.25 | $7.00 |
| 644E01300 LANE ARROW | 2 EACH | $230 | $200 | $200 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,118 FT | $3.00 | $2.60 | $3.00 |
| 646E10000 EDGE LINE, 4" | 0.23 MILE | $19,000 | $16,025 | $16,025 |
| 646E10010 EDGE LINE, 6" | 0.03 MILE | $24,000 | $20,490 | $20,490 |
| 646E10100 LANE LINE, 4" | 0.23 MILE | $12,250 | $10,595 | $10,595 |
| 646E10110 LANE LINE, 6" | 0.01 MILE | $13,500 | $11,685 | $11,685 |
| 646E10200 CENTER LINE | 0.25 MILE | $28,500 | $24,990 | $24,990 |
| 646E10300 CHANNELIZING LINE, 8" | 100 FT | $5.75 | $5.00 | $5.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 250 FT | $17.25 | $15.00 | $15.00 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 1,427 FT | $3.00 | $2.50 | $3.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $140 | $95.00 | $85.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,765 | $2,400 | $2,850 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (UNI-DIRECTIONAL) | 20 EACH | $16.00 | $14.00 | $11.00 |
| 614E13360 OBJECT MARKER, TWO WAY (UNI-DIRECTIONAL) | 20 EACH | $21.00 | $18.00 | $13.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 7 SNMT | $805 | $700 | $1,180 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.2 MILE | $1,650 | $1,435 | $1,435 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 5 MILE | $1,250 | $1,085 | $1,085 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.16 MILE | $9,500 | $8,100 | $8,100 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 316 FT | $0.90 | $0.75 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 28 FT | $5.25 | $4.50 | $5.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 17 EACH | $86.25 | $75.00 | $75.00 |
| 690E71000 SPECIAL - ASBESTOS ABATEMENT: WORK INVOLVING ASBES | 1 LS | $1,000 | $2,000 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $18,000 | $75,000 | $23,982 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 789 LB | $6.00 | $2.75 | $4.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 104 EACH | $55.00 | $85.00 | $22.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 168 SY | $40.50 | $35.00 | $32.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 168 SY | $30.00 | $25.00 | $35.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 30 FT | $175 | $150 | $172 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $2,250 | $20,000 | $2,662 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 72 LB | $8.00 | $21.00 | $13.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 12 EACH | $65.00 | $115 | $21.00 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 0.53 CY | $18,000 | $15,000 | $11,563 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 8 SY | $40.50 | $35.00 | $75.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 6 SY | $30.00 | $25.00 | $35.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $12,000 | $10,000 | $17,383 |
| 516E01300 ELASTOMERIC STRIP SEAL WITHOUT STEEL EXTRUSIONS | 68 FT | $180 | $150 | $85.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 68 FT | $155 | $25.00 | $34.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 13 CY | $400 | $350 | $384 |
| 848E50000 HAND CHIPPING | 4 SY | $350 | $250 | $2,189 |
| 848E50100 TEST SLAB | 1 LS | $2,500 | $8,000 | $5,615 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 200 LB | $6.00 | $10.00 | $4.00 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 2,128 LB | $5.00 | $8.00 | $5.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 252 SY | $40.25 | $35.00 | $28.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 225 SY | $30.00 | $25.00 | $35.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 115 FT | $125 | $25.00 | $35.00 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 18 SY | $700 | $590 | $837 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 21 SY | $550 | $500 | $771 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $1,000 | $525 | $16,182 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $14,000 | $6,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,000 | $135k | 9% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 4,465 SF | $30 | $134k | 9% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 131 FT | $975 | $128k | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $100,000 | $100k | 6% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 28 CY | $3,000 | $84k | 5% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 454 SY | $175 | $79k | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 454 SY | $155 | $70k | 4% |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 8 EACH | $8,500 | $68k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 156 CY | $325 | $51k | 3% |