Bid dateThursday, February 27—
DEF County · est $7.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 134 more items below.
| Item | Quantity | R1E S Wagner Company | R2Miller Bros Const INC | R3Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 82,304 CY | $9.68 | $11.60 | $13.50 | 21% |
| 515E15090 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 10 EACH | $60,000 | $61,000 | $67,000 | 16% |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 4,758 SF | $65.00 | $65.00 | $65.00 | 8% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 262 CY | $943 | $750 | $950 | 6% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 6,140 FT | $38.50 | $25.00 | $45.00 | 6% |
| 840E23000 SELECT GRANULAR BACKFILL | 3,751 CY | $62.00 | $60.00 | $62.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 |
| Item | Quantity | R1E S Wagner Company | R2Miller Bros Const INC | R3Vernon Nagel INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $34,708 | $25,000 | $15,000 |
| 202E23000 PAVEMENT REMOVED | 5,201 SY | $8.50 | $4.40 | $5.00 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 4,252 SY | $5.00 | $9.00 | $10.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 975 FT | $20.00 | $10.00 | $8.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 320 FT | $28.50 | $50.00 | $10.00 |
| 202E58100 CATCH BASIN REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $274,304 |
| $200,000 |
| 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 769 CY | $210 | $210 | $210 | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 116,400 LB | $1.36 | $1.40 | $1.45 | 4% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 217 CY | $572 | $540 | $700 | 3% |
| 304E20000 AGGREGATE BASE | 1,785 CY | $68.00 | $65.00 | $60.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 6,954 FT | $11.50 | $10.00 | $22.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (331 CY | $240 | $240 | $225 | 2% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 236 SY | $300 | $360 | $350 | 2% |
| 611E16200 36" CONDUIT, TYPE A, 706.02 OR 707.33; OR 42? TYPE | 440 FT | $155 | $170 | $100 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 237 CY | $275 | $275 | $250 | 2% |
| 511E33418 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 67 CY | $962 | $810 | $800 | 2% |
| 840E26000 CONCRETE COPING | 344 FT | $186 | $124 | $140 | 2% |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 5,805 FT | $11.00 | $19.00 | $10.00 | 2% |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 24 EACH | $2,600 | $1,150 | $1,800 | 2% |
| 1 EACH |
| $305 |
| $400 |
| $225 |
| 202E75000 FENCE REMOVED | 2,313 FT | $2.00 | $2.00 | $4.00 |
| 203E10000 EXCAVATION | 2,762 CY | $8.54 | $8.00 | $13.50 |
| 204E10000 SUBGRADE COMPACTION | 7,993 SY | $1.77 | $1.40 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 209 CY | $8.54 | $17.50 | $18.00 |
| 204E20000 EMBANKMENT | 209 CY | $9.68 | $21.00 | $13.00 |
| 204E50000 GEOTEXTILE FABRIC | 627 SY | $1.57 | $1.50 | $1.30 |
| 204E60000 SPECIAL - GEOCELL, SUBGRADE6?, GEOWEB | 324 SY | $47.00 | $55.00 | $28.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 988 FT | $20.40 | $20.40 | $20.40 |
| 606E15551 GUARDRAIL, BARRIER DESIGN, TYPE MGS, AS PER PLAN | 151 FT | $34.00 | $34.00 | $34.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE EMASH 2016 | 4 EACH | $2,580 | $2,580 | $2,580 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,320 | $1,320 | $1,320 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,550 | $2,550 | $2,550 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $8,120 | $8,120 | $8,120 |
| 607E15001 FENCE, TYPE 47, AS PER PLAN | 1,820 FT | $13.60 | $13.60 | $13.60 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 308 FT | $113 | $113 | $113 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $2,000 | $1,250 | $800 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET | 1 EACH | $2,000 | $1,200 | $800 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $1,000 | $100 | $350 |
| 623E40900 MONUMENT, MISC.: MAG SPIKE TO BE SET DURING CONSTR | 12 EACH | $200 | $50.00 | $500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $5,000 | $2,000 | $3,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $3,000 | $2,000 | $1,000 |
| 625E32000 GROUND ROD | 4 EACH | $320 | $320 | $265 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $630 | $180 | $180 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $395 | $700 | $195 |
| 202E98100 REMOVAL MISC.:, BILLBOARD TO BE REMOVED | 1 EACH | $2,300 | $2,200 | $612 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 13 SY | $193 | $185 | $125 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 19 CY | $250 | $122 | $125 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $40.00 | $40.00 | $40.00 |
| 659E00300 TOPSOIL | 4,030 CY | $7.50 | $8.50 | $5.00 |
| 659E10000 SEEDING AND MULCHING | 33,928 SY | $0.74 | $0.74 | $1.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 2,559 SY | $0.74 | $0.74 | $0.74 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,815 SY | $3.10 | $0.74 | $0.74 |
| 659E15000 INTER-SEEDING | 1,815 SY | $0.50 | $0.50 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 4.9 TON | $850 | $850 | $850 |
| 659E31000 LIME | 7.5 ACRE | $35.00 | $35.00 | $35.00 |
| 659E35000 WATER | 196 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 11,728 SY | $1.80 | $1.80 | $1.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,025 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,825 | $6,650 | $9,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,020 | $10,200 | $12,000 |
| 832E30000 EROSION CONTROL | 40,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 20.3 CY | $672 | $1,200 | $1,200 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 3,230 FT | $8.00 | $9.40 | $12.00 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,835 FT | $21.00 | $18.70 | $15.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $22.00 | $19.00 | $20.00 |
| 611E00200 4" CONDUIT, TYPE C | 22 FT | $36.00 | $62.50 | $25.00 |
| 611E00400 4" CONDUIT, TYPE E | 50 FT | $25.00 | $22.50 | $15.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 137 FT | $36.00 | $37.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 123 FT | $45.00 | $45.00 | $22.00 |
| 611E01100 6" CONDUIT, TYPE C | 527 FT | $33.00 | $40.00 | $32.00 |
| 611E02000 8" CONDUIT, TYPE C | 87 FT | $127 | $52.00 | $30.00 |
| 611E03600 10" CONDUIT, TYPE E | 10 FT | $91.00 | $32.00 | $25.00 |
| 611E04400 12" CONDUIT, TYPE B | 124 FT | $87.00 | $75.00 | $50.00 |
| 611E04600 12" CONDUIT, TYPE C | 338 FT | $47.00 | $68.00 | $45.00 |
| 611E04900 12" CONDUIT, TYPE D | 250 FT | $73.00 | $65.00 | $48.00 |
| 611E05200 12" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 168 FT | $95.00 | $66.00 | $88.00 |
| 611E06100 15" CONDUIT, TYPE C | 382 FT | $53.00 | $83.00 | $56.00 |
| 611E11900 27" CONDUIT, TYPE B, 706.02; OR 30? TYPE B, 707.11 | 226 FT | $140 | $151 | $90.00 |
| 611E13200 30" CONDUIT, TYPE A, 706.02 OR 707.33; OR 36? TYPE | 158 FT | $145 | $159 | $95.00 |
| 611E98451 CATCH BASIN, NO. 2-2A, AS PER PLAN | 3 EACH | $3,100 | $2,100 | $1,500 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 4 EACH | $11,000 | $10,000 | $10,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $5,700 | $4,500 | $6,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 13 EACH | $600 | $330 | $400 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 118 SY | $10.00 | $10.00 | $10.00 |
| 407E20000 NON-TRACKING TACK COAT | 802 GAL | $2.00 | $2.00 | $2.75 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $500 | $500 | $250 |
| 609E24510 CURB, TYPE 4-C | 74 FT | $61.10 | $54.60 | $65.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1,865 FT | $3.63 | $3.25 | $3.75 |
| 625E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN | 1 EACH | $7,829 | $14,500 | $14,500 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $11.60 | $11.60 | $11.60 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1 WAY) | 8 EACH | $13.00 | $13.00 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 12 EACH | $13.40 | $13.40 | $13.40 |
| 630E80300 SIGN, TEMPORARY OVERLAY | 18 SF | $35.00 | $35.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 34 EACH | $30.00 | $30.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 51 EACH | $30.00 | $30.00 | $30.00 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 100 FT | $46.90 | $46.90 | $1.00 |
| 643E00100 EDGE LINE, 4" | 0.88 MILE | $4,510 | $4,510 | $4,510 |
| 643E00104 EDGE LINE, 6" | 1.09 MILE | $4,510 | $4,510 | $4,510 |
| 643E00204 LANE LINE, 6" | 0.54 MILE | $1,910 | $1,910 | $1,910 |
| 643E00300 CENTER LINE | 0.44 MILE | $6,940 | $6,940 | $6,940 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 64 HOUR | $103 | $85.00 | $80.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,380 | $2,380 | $2,380 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,000 | $7,000 | $7,000 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $356 | $192 | $192 |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $64.00 | $56.00 | $56.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1 WAY) | 140 EACH | $10.26 | $8.00 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 140 EACH | $27.22 | $16.00 | $16.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 20 SNMT | $800 | $850 | $850 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1 MILE | $10,000 | $10,000 | $10,000 |
| 616E10000 WATER | 240 MGAL | $50.00 | $15.00 | $2.00 |
| 203E20000 EMBANKMENT | 924 CY | $10.00 | $18.00 | $18.00 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 390 CY | $80.00 | $60.00 | $55.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $2,300 | $750 | $600 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 448 SY | $23.25 | $25.00 | $42.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 189 FT | $14.43 | $16.50 | $10.00 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 30 SY | $59.65 | $95.00 | $26.00 |
| 601E40000 PAVED GUTTER, MISC.: CONCRETE GUTTER ADJACENT TO C | 344 FT | $37.04 | $50.00 | $35.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $566 | $330 | $450 |
| 840E21000 WALL EXCAVATION | 1,593 CY | $15.00 | $5.00 | $7.00 |
| 840E22001 FOUNDATION PREPARATION, AS PER PLAN | 764 SY | $65.62 | $70.00 | $58.00 |
| 840E23050 NATURAL SOIL | 309 CY | $20.39 | $13.00 | $12.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 721 FT | $8.96 | $3.70 | $8.00 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $100 | $600 | $100 |
| 840E28000 SGB INSPECTION AND COMPACTION TESTING | 1 LS | $17,948 | $9,160 | $15,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,445 | $10,000 | $2,500 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $14,044 | $79,000 | $25,000 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 8,365 FT | $1.63 | $1.80 | $2.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $4,205 | $3,350 | $3,600 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 74 CY | $665 | $705 | $700 |
| 511E41512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 17 CY | $866 | $870 | $1,000 |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 29 CY | $1,061 | $1,000 | $975 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 41 CY | $473 | $530 | $500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,261 SY | $17.86 | $22.00 | $42.00 |
| 512E44450 TYPE E WATERPROOFING | 8 SY | $19.21 | $49.00 | $30.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 76 FT | $70.42 | $40.00 | $44.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 21 SF | $10.01 | $7.00 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 89 SF | $8.42 | $7.50 | $8.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 103 FT | $34.34 | $25.00 | $38.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,743 | $1,650 | $3,700 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,180 | $3,100 | $1,900 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 50 CY | $88.84 | $135 | $80.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 198 FT | $17.26 | $9.50 | $10.00 |
| 526E90030 TYPE C INSTALLATION | 80 FT | $164 | $170 | $200 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 390 FT | $90.80 | $90.80 | $90.80 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $38,000 | $40,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,000 | $75,500 | $50,000 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $2,100 | $2,200 | $2,300 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $22,970 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 82,304 CY | $9.68 | $797k | 15% |
| 515E15090 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 10 EACH | $60,000 | $600k | 11% |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 4,758 SF | $65 | $309k | 6% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 262 CY | $942.63 | $247k | 5% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 6,140 FT | $38.5 | $236k | 4% |
| 840E23000 SELECT GRANULAR BACKFILL | 3,751 CY | $62 | $233k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 769 CY | $210 | $161k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 116,400 LB | $1.36 | $158k | 3% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 217 CY | $572.27 | $124k | 2% |