Figure 0.1 · BRIEFING BID #250141 · ODOT RESULT · awarded Feb 27 D05-PM FY2025 (B) Fast Dry West D05 County · est $2.0M
Bid date Thursday, February 27 —
Project scope Bid form · ODOT
29 ITEMS Pavement Marking 55% Maintaining Traffic 14% Mobilization & General 7% Other 24% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 1,336.88 MILE $700 $936k 56% 642E00300 CENTER LINE, TYPE 1 575.78 MILE $660 $380k 23%
Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC % of bid 642E00104 EDGE LINE, 6", TYPE 1 1,336.88 MILE $700 $760 57% 642E00300 CENTER LINE, TYPE 1 575.78 MILE $660 $805 23% 642E00204 LANE LINE, 6", TYPE 1 147.6 MILE $380 $380 3% 642E00404 CHANNELIZING LINE, 12", TYPE 1 57,306 FT $0.65 $0.75 2% 642E00620 CROSSWALK LINE, 12", TYPE 1 11,939 FT $3.00 $3.85 2% 614E11000 MAINTAINING TRAFFIC 1 LS $32,000 $60,000 2% 642E01510 DOTTED LINE, 6", TYPE 1 38,671 FT $0.65 $0.77 2% 642E01300 LANE ARROW, TYPE 1 335 EACH $74.00 $85.00 2% 642E00500 STOP LINE, TYPE 1 5,322 FT $4.00 $6.45 1% 642E40001 SPEED MEASUREMENT MARKING, AS PER PLAN 12 EACH $1,150 $1,500 1% 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 30 EACH $350 $400 1% 647E50100 PAVEMENT MARKING, MISC.: LANE ARROW, TYPE B90, 96" 10 EACH $1,050 $3,000 1% 624E10000 MOBILIZATION 1 LS $10,400 $60,000 1% 642E00400 CHANNELIZING LINE, 8", TYPE 1 19,257 FT $0.50 $0.65 1% 642E01410 WORD ON PAVEMENT, 96", TYPE 1 (ONLY) 114 EACH $84.00 $140 1% 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST 150 HOUR $55.00 $100 1% 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 23 EACH $350 $435 0% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $7,667 $10,250 0% 644E30000 REMOVAL OF PAVEMENT MARKING 329 FT $20.00 $6.00 0% 642E01322 WRONG WAY ARROW, TYPE 1 12 EACH $365 $380 0%
Show all 29 line items Item Quantity R1 The Aero-mark Company LLC R2 Oglesby Construction INC 642E01312 LANE REDUCTION ARROW, TYPE 1 8 EACH $500 $360 642E01352 TWO WAY LEFT TURN ARROW, TYPE 1 2 EACH $100 $185 642E01410 WORD ON PAVEMENT, 96", TYPE 1 (MERGE) 2 EACH $500 $380 642E20802 YIELD LINE, TYPE 1 194 FT $3.76 $10.00 642E30020 REMOVAL OF PAVEMENT MARKING 3 EACH $200 $1,000 644E30030 REMOVAL OF PAVEMENT MARKING 0.26 MILE $14,000 $31,680 646E50000 REMOVAL OF PAVEMENT MARKING 16 EACH
Project details
Description D05-PM FY2025 (B) Fast Dry West
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →