UNI-US 33-09.10/11.50 (PART 1, 2, 3)
UNI County · est $21M
Bid dateThursday, March 27—
UNI County · est $21M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 415 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $1,041,758 | $1,000,000 | $1,057,321 | $1,150,000 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $950,000 | $777,000 | $850,000 | $1,075,000 | 10% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 38,396 FT | $24.57 | $21.00 | $20.00 | $22.00 | 10% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 9,815 SY | $71.00 | $52.00 | $52.00 | $71.00 | 7% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,415 CY | $181 | $181 | $181 | $193 | 7% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $600,000 | $800,000 |
| Item | Quantity | R1Miller Bros Const INC | R2Complete General Construction Company | R3Shelly & Sands INC | R4Eagle Bridge CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $80,000 | $5,500 | $10,000 |
| 203E10000 EXCAVATION | 5,302 CY | $28.50 | $34.00 | $38.00 | $35.00 |
| 203E20000 EMBANKMENT | 2,768 CY | $7.50 | $14.00 | $12.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 17,092 SY | $1.15 | $4.00 | $2.50 | $4.50 |
| 204E13000 EXCAVATION OF SUBGRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $350,000 |
| $425,000 |
| 6% |
| 513E10041 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 1 LS | $520,000 | $475,000 | $540,000 | $590,000 | 6% |
| 513E10041 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 1 LS | $510,000 | $475,000 | $540,000 | $590,000 | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 18,956.25 FT | $21.60 | $21.60 | $21.00 | $21.00 | 4% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 1,532 CY | $204 | $204 | $204 | $216 | 3% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 267 CY | $1,125 | $1,200 | $1,345 | $1,550 | 3% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 198 CY | $1,500 | $1,200 | $1,550 | $1,650 | 3% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 198 CY | $1,500 | $1,200 | $1,550 | $1,675 | 3% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 258 CY | $1,140 | $1,200 | $1,350 | $1,600 | 3% |
| 619E16020 FIELD OFFICE, TYPE C | 39 MNTH | $7,500 | $4,000 | $4,300 | $3,500 | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 194 CY | $1,400 | $1,300 | $1,690 | $2,000 | 3% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 194 CY | $1,400 | $1,300 | $1,655 | $2,000 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $150,000 | $135,000 | $275,000 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $175,000 | $160,000 | $300,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 5,646 SY | $39.50 | $22.00 | $21.00 | $50.00 | 2% |
| 151 CY |
| $53.00 |
| $36.00 |
| $34.00 |
| $35.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 151 CY | $72.50 | $60.00 | $74.00 | $60.00 |
| 204E45000 PROOF ROLLING | 8 HOUR | $150 | $250 | $275 | $200 |
| 204E50000 GEOTEXTILE FABRIC | 453 SY | $3.00 | $3.25 | $0.50 | $1.50 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 14 SY | $195 | $100 | $243 | $150 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 169 SY | $100 | $100 | $67.00 | $70.00 |
| 659E00300 TOPSOIL | 2,252 CY | $6.80 | $25.00 | $28.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 20,284 SY | $0.72 | $0.73 | $0.80 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,014 SY | $0.50 | $0.80 | $0.80 | $2.00 |
| 659E15000 INTER-SEEDING | 1,014 SY | $0.01 | $0.80 | $0.80 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 2.74 TON | $1,500 | $522 | $880 | $2,000 |
| 659E31000 LIME | 4.19 ACRE | $200 | $155 | $165 | $10.00 |
| 659E35000 WATER | 57.51 MGAL | $1.00 | $1.00 | $1.00 | $20.00 |
| 670E00500 SLOPE EROSION PROTECTION | 6,754 SY | $1.95 | $1.23 | $1.25 | $2.50 |
| 670E00700 DITCH EROSION PROTECTION | 1,260 SY | $1.95 | $1.29 | $1.25 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,975 | $3,000 | $3,200 | $3,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $39,780 | $39,780 | $43,700 | $45,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $26,500 | $26,500 | $28,300 | $27,500 |
| 832E30000 EROSION CONTROL | 55,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 1,001 FT | $17.00 | $18.00 | $18.00 | $15.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 8,083 FT | $13.50 | $14.00 | $10.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 729 FT | $75.00 | $18.50 | $23.00 | $32.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $2,000 | $900 | $927 | $900 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $3,000 | $775 | $925 | $900 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $415 | $365 | $565 | $300 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 3,969 SY | $9.95 | $9.95 | $10.00 | $9.95 |
| 304E20000 AGGREGATE BASE | 1,009 CY | $103 | $88.00 | $85.00 | $140 |
| 304E20001 AGGREGATE BASE, AS PER PLAN (VARIABLE DEPTH) | 1,803 CY | $90.00 | $112 | $110 | $85.00 |
| 407E10000 TACK COAT | 3,070 GAL | $2.50 | $2.50 | $2.50 | $2.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 178 CY | $75.00 | $124 | $98.00 | $165 |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 200 CY | $295 | $295 | $295 | $295 |
| 609E24510 CURB, TYPE 4-C | 425 FT | $43.00 | $74.00 | $40.00 | $75.00 |
| 620E70000 DELINEATOR, MISC.: UNDERDRAIN OUTLET MARKER | 7 EACH | $275 | $275 | $100 | $100 |
| 621E00100 RPM | 17 EACH | $235 | $275 | $290 | $235 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 17 EACH | $8.00 | $15.00 | $15.00 | $20.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 8 EACH | $15.00 | $15.00 | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 52 FT | $22.00 | $22.00 | $16.00 | $15.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 33 FT | $25.00 | $25.00 | $21.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 24 SF | $29.00 | $29.00 | $26.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $10.00 | $10.00 | $32.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $15.00 | $32.00 | $30.00 |
| 646E10010 EDGE LINE, 6" | 0.7 MILE | $5,200 | $17,650 | $17,650 | $5,200 |
| 646E10110 LANE LINE, 6" | 0.35 MILE | $5,300 | $9,915 | $9,915 | $5,300 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 1,325 FT | $26.60 | $26.60 | $25.00 | $25.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,804 | $2,280 | $1,950 | $1,804 |
| 614E12420 DETOUR SIGNING | 1 LS | $22,835 | $45,000 | $35,175 | $25,000 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 35 EACH | $308 | $325 | $895 | $308 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 4 EACH | $43,000 | $81,000 | $43,000 | $43,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 1,206 EACH | $12.43 | $9.00 | $3.30 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 220 EACH | $19.93 | $16.00 | $12.00 | $17.00 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 2.99 MILE | $1,150 | $1,150 | $1,600 | $1,150 |
| 614E20366 WORK ZONE LANE LINE, CLASS I, 6", 648 | 6.2 MILE | $1,260 | $1,260 | $1,250 | $1,260 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 39.26 MILE | $2,700 | $2,700 | $2,300 | $2,700 |
| 614E22336 WORK ZONE EDGE LINE, CLASS I, 6", 648 | 11.7 MILE | $1,625 | $1,625 | $1,925 | $1,625 |
| 614E23100 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 807 PAIN | 17,634 FT | $1.50 | $1.50 | $1.50 | $1.50 |
| 614E24102 WORK ZONE DOTTED LINE, CLASS I, 6", 807 PAINT | 12,224 FT | $1.50 | $1.50 | $1.20 | $1.50 |
| 616E10000 WATER | 33 MGAL | $90.00 | $80.00 | $50.00 | $25.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 10,530 FT | $18.87 | $24.00 | $36.00 | $23.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 255 SNMT | $536 | $536 | $535 | $450 |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 11,100 FT | $4.90 | $4.90 | $5.20 | $5.50 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $125,000 | $150,000 | $125,000 | $300,000 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $55.00 | $60.00 | $51.00 | $75.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $145,000 | $120,000 | $90,000 | $45,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 226 CY | $150 | $140 | $125 | $75.00 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 855 FT | $29.00 | $50.00 | $26.00 | $45.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 765 FT | $27.00 | $10.00 | $36.00 | $8.00 |
| 507E93300 STEEL POINTS OR SHOES | 18 EACH | $145 | $124 | $132 | $150 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 22,406 LB | $1.70 | $1.51 | $2.00 | $1.80 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 841 LB | $2.30 | $3.68 | $2.00 | $2.15 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 21,229 FT | $1.45 | $1.20 | $1.25 | $1.25 |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 35,496 FT | $1.75 | $1.62 | $1.45 | $1.60 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 39 CY | $975 | $1,000 | $1,200 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 92 CY | $850 | $950 | $1,150 | $875 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 699 SY | $10.50 | $14.00 | $15.00 | $12.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 29 SY | $42.00 | $45.00 | $45.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $85.00 | $54.00 | $50.00 | $70.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 3,114 EACH | $5.50 | $7.00 | $6.00 | $5.20 |
| 513E90000 STRUCTURAL STEEL, MISC.: MOMENT PLATE FATIGUE RETR | 3,918 LB | $18.50 | $21.63 | $19.00 | $20.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2-IN DIA. FIELD DRILLED H | 36 EACH | $75.00 | $78.65 | $83.00 | $77.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,198 SF | $8.27 | $7.75 | $13.25 | $13.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,198 SF | $5.33 | $5.00 | $6.00 | $6.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,707 SF | $5.33 | $5.00 | $4.00 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,707 SF | $5.33 | $5.00 | $3.20 | $3.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 83 FT | $43.00 | $135 | $58.00 | $70.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 73 SF | $6.50 | $11.00 | $6.00 | $7.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 73 SF | $7.00 | $12.00 | $8.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 50 SF | $8.50 | $13.00 | $10.00 | $12.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 107 FT | $29.00 | $45.00 | $37.00 | $35.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $2,200 | $1,225 | $1,400 | $1,650 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $37,000 | $48,000 | $50,000 | $100,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 87 CY | $140 | $100 | $120 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 118 FT | $10.00 | $11.00 | $3.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $17.00 | $13.00 | $5.00 | $16.00 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 229 SY | $500 | $420 | $450 | $500 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 83 FT | $250 | $335 | $400 | $350 |
| 530E00400 SPECIAL - STRUCTURES - GROUT AND SEAL PCB ANCHOR H | 26 EACH | $70.00 | $43.00 | $49.00 | $20.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 186 CY | $130 | $90.00 | $140 | $110 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION. | 1 LS | $20,000 | $18,000 | $30,000 | $50,000 |
| 514E27700 FIELD PAINTING, MISC.:' Coating of End Beams | 323 SF | $101 | $95.00 | $120 | $110 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $55.00 | $60.00 | $50.00 | $75.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $150,000 | $120,000 | $80,000 | $40,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 226 CY | $150 | $140 | $125 | $75.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $19,000 | $18,000 | $30,000 | $45,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 855 FT | $29.00 | $50.00 | $26.00 | $45.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 765 FT | $27.00 | $10.00 | $36.00 | $8.00 |
| 507E93300 STEEL POINTS OR SHOES | 18 EACH | $150 | $124 | $132 | $150 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 22,406 LB | $1.70 | $1.51 | $2.00 | $1.84 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 841 LB | $2.30 | $3.68 | $2.00 | $2.15 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 21,229 FT | $1.45 | $1.20 | $1.25 | $1.25 |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 35,496 FT | $1.80 | $1.62 | $1.55 | $1.60 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 39 CY | $975 | $1,000 | $1,200 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 92 CY | $850 | $975 | $1,165 | $900 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 699 SY | $10.50 | $14.00 | $15.00 | $12.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 29 SY | $42.00 | $45.00 | $48.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $85.00 | $54.00 | $53.00 | $70.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 3,114 EACH | $5.50 | $7.00 | $6.00 | $5.20 |
| 513E90000 STRUCTURAL STEEL, MISC.: MOMENT PLATE FATIGUE RETR | 3,918 LB | $18.50 | $22.05 | $19.00 | $20.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2-IN DIA. FIELD DRILLED H | 36 EACH | $75.00 | $78.65 | $83.00 | $77.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,198 SF | $8.27 | $7.75 | $13.25 | $13.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,198 SF | $5.33 | $5.00 | $6.00 | $6.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,707 SF | $5.33 | $5.00 | $4.00 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,707 SF | $5.33 | $5.00 | $3.15 | $3.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 83 FT | $42.00 | $135 | $60.00 | $70.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 73 SF | $6.50 | $11.00 | $6.00 | $7.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 73 SF | $7.00 | $12.00 | $8.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 50 SF | $8.50 | $13.00 | $10.00 | $12.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 107 FT | $29.00 | $45.00 | $37.00 | $35.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $2,300 | $1,500 | $1,500 | $1,700 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $37,000 | $45,000 | $55,000 | $100,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 87 CY | $140 | $100 | $120 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 118 FT | $10.00 | $11.00 | $4.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $16.50 | $14.00 | $5.00 | $16.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $7,400 | $6,500 | $6,500 | $4,500 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 229 SY | $500 | $420 | $465 | $500 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 83 FT | $250 | $335 | $398 | $340 |
| 530E00400 SPECIAL - STRUCTURES - GROUT AND SEAL PCB ANCHOR H | 26 EACH | $70.00 | $43.00 | $49.00 | $20.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 186 CY | $130 | $90.00 | $140 | $110 |
| 514E27700 FIELD PAINTING, MISC.:' Coating of End Beams | 323 SF | $101 | $95.00 | $120 | $110 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $125,000 | $175,000 | $140,000 | $300,000 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $55.00 | $60.00 | $50.00 | $75.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $65,000 | $20,000 | $35,000 | $35,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 160 CY | $240 | $140 | $100 | $75.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 22,827 LB | $1.70 | $1.51 | $2.00 | $1.85 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 1,133 LB | $2.20 | $3.68 | $2.00 | $2.15 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 24,565 FT | $1.45 | $1.20 | $1.25 | $1.25 |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 41,598 FT | $1.80 | $1.62 | $1.55 | $1.60 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 216 EACH | $26.00 | $16.00 | $33.00 | $26.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,200 | $3,500 | $4,600 | $4,250 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 46 CY | $938 | $1,000 | $1,180 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 36 CY | $900 | $1,250 | $2,180 | $1,650 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $550 | $700 | $1,350 | $900 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 815 SY | $10.50 | $14.00 | $14.00 | $12.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 34 SY | $36.00 | $45.00 | $45.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $130 | $54.00 | $55.00 | $75.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,860 EACH | $5.50 | $7.00 | $6.50 | $5.20 |
| 513E90000 STRUCTURAL STEEL, MISC.: MOMENT PLATE FATIGUE RETR | 4,010 LB | $18.00 | $21.45 | $19.00 | $20.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2-IN DIA. FIELD DRILLED H | 36 EACH | $75.00 | $78.65 | $77.50 | $77.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,177 SF | $5.87 | $7.50 | $13.30 | $13.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,177 SF | $4.80 | $4.50 | $6.20 | $6.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,704 SF | $4.80 | $4.50 | $4.10 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,704 SF | $4.80 | $4.50 | $3.10 | $3.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 104 FT | $43.00 | $135 | $55.00 | $70.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 64 SF | $10.50 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 129 FT | $29.00 | $33.00 | $40.00 | $35.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $2,200 | $1,450 | $1,320 | $1,550 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $36,000 | $30,000 | $36,500 | $50,000 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 2 EACH | $2,250 | $3,200 | $3,000 | $1,850 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 75 CY | $140 | $100 | $135 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 150 FT | $10.00 | $10.00 | $4.50 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $17.00 | $22.00 | $5.00 | $16.00 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 229 SY | $525 | $420 | $460 | $525 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 104 FT | $240 | $335 | $382 | $325 |
| 530E00400 SPECIAL - STRUCTURES - GROUT AND SEAL PCB ANCHOR H | 30 EACH | $70.00 | $43.00 | $56.00 | $20.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 274 CY | $130 | $125 | $130 | $75.00 |
| 514E27700 FIELD PAINTING, MISC.:' Coating of End Beams | 344 SF | $101 | $95.00 | $112 | $110 |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $55.00 | $60.00 | $52.00 | $75.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $65,000 | $20,000 | $29,000 | $35,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 160 CY | $240 | $140 | $110 | $75.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 22,827 LB | $1.70 | $1.51 | $1.95 | $1.80 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 1,133 LB | $2.25 | $3.68 | $1.85 | $2.15 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 24,565 FT | $1.45 | $1.20 | $1.20 | $1.25 |
| 509E30030 NO. 5 DEFORMED GFRP REINFORCEMENT | 41,598 FT | $1.80 | $1.62 | $1.50 | $1.60 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 216 EACH | $26.00 | $16.00 | $35.00 | $26.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,100 | $3,500 | $4,685 | $4,250 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 46 CY | $938 | $1,000 | $1,180 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 38 CY | $925 | $1,250 | $2,075 | $1,700 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $550 | $700 | $1,325 | $900 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 826 SY | $10.00 | $14.00 | $14.00 | $12.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 34 SY | $36.00 | $45.00 | $45.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 5 SY | $110 | $54.00 | $55.00 | $75.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 4,200 LB | $14.00 | $5.32 | $6.15 | $7.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,860 EACH | $5.50 | $7.00 | $6.50 | $5.20 |
| 513E90000 STRUCTURAL STEEL, MISC.: MOMENT PLATE FATIGUE RETR | 4,010 LB | $18.00 | $21.45 | $19.00 | $20.00 |
| 513E95030 STRUCTURAL STEEL, MISC.: 2-IN DIA. FIELD DRILLED H | 36 EACH | $75.00 | $78.65 | $77.50 | $77.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 8,862 SF | $8.00 | $7.50 | $13.30 | $13.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 8,862 SF | $4.80 | $4.50 | $6.20 | $6.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,863 SF | $4.80 | $4.50 | $4.10 | $4.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,863 SF | $4.80 | $4.50 | $3.10 | $3.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 104 FT | $43.00 | $135 | $55.00 | $70.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 71 SF | $9.50 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 132 FT | $29.00 | $33.00 | $40.00 | $35.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $2,600 | $1,600 | $1,753 | $2,100 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $36,000 | $60,000 | $66,000 | $80,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 81 CY | $135 | $100 | $130 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 150 FT | $10.00 | $10.00 | $4.00 | $16.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $17.00 | $14.00 | $5.00 | $20.00 |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 229 SY | $525 | $420 | $465 | $525 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 104 FT | $240 | $335 | $382 | $325 |
| 530E00400 SPECIAL - STRUCTURES - GROUT AND SEAL PCB ANCHOR H | 30 EACH | $120 | $43.00 | $55.00 | $20.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 274 CY | $130 | $125 | $127 | $75.00 |
| 514E27700 FIELD PAINTING, MISC.:' Coating of End Beams | 344 SF | $101 | $95.00 | $112 | $110 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $18,000 | $3,500 | $10,000 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN, 18.5" | 3,181 SY | $38.00 | $18.00 | $19.00 | $38.00 |
| 203E10000 EXCAVATION | 10 CY | $200 | $46.00 | $65.00 | $40.00 |
| 203E20000 EMBANKMENT | 32 CY | $85.00 | $18.00 | $15.00 | $45.00 |
| 204E10000 SUBGRADE COMPACTION | 3,391 SY | $2.20 | $4.00 | $6.00 | $12.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 6 SY | $195 | $100 | $107 | $140 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 135 SY | $100 | $100 | $68.00 | $70.00 |
| 659E00300 TOPSOIL | 755 CY | $50.00 | $30.00 | $42.00 | $15.00 |
| 659E10000 SEEDING AND MULCHING | 6,833 SY | $1.87 | $1.04 | $1.04 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 342 SY | $0.50 | $0.80 | $0.80 | $2.00 |
| 659E15000 INTER-SEEDING | 342 SY | $0.01 | $0.80 | $0.80 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.92 TON | $1,500 | $822 | $822 | $2,000 |
| 659E31000 LIME | 1.41 ACRE | $200 | $155 | $155 | $10.00 |
| 659E35000 WATER | 37 MGAL | $1.00 | $1.00 | $1.00 | $20.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 30 FT | $65.50 | $20.00 | $25.00 | $14.00 |
| 605E31100 AGGREGATE DRAINS | 45 FT | $30.00 | $16.00 | $20.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 30 FT | $75.00 | $18.00 | $25.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $415 | $350 | $560 | $300 |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 818 CY | $198 | $198 | $198 | $198 |
| 304E20001 AGGREGATE BASE, AS PER PLAN, 6" | 566 CY | $90.00 | $87.00 | $90.00 | $140 |
| 407E20000 NON-TRACKING TACK COAT | 540 GAL | $4.50 | $4.50 | $4.50 | $4.50 |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 310 CY | $290 | $290 | $290 | $290 |
| 609E24510 CURB, TYPE 4-C | 90 FT | $47.00 | $74.00 | $86.00 | $90.00 |
| 617E25000 WATER | 1 MGAL | $70.00 | $160 | $80.00 | $20.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,358 | $50,000 | $74,000 | $15,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 5 SNMT | $1,020 | $1,020 | $1,000 | $1,000 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $26,000 | $200,000 | $140,000 | $200,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 1 LS | $18,000 | $70,000 | $25,000 | $45,000 |
| 202E22900 APPROACH SLAB REMOVED | 222 SY | $55.00 | $60.00 | $48.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 819 SY | $9.50 | $11.00 | $13.00 | $18.00 |
| 202E32000 CURB REMOVED | 46 FT | $11.00 | $11.00 | $14.00 | $10.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $48,000 | $20,000 | $35,000 | $35,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $18,000 | $30,000 | $6,000 | $20,000 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 67,286 LB | $2.10 | $2.01 | $1.99 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,936 FT | $1.50 | $1.20 | $1.21 | $1.25 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 214 EACH | $25.00 | $16.00 | $40.00 | $20.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $3,300 | $3,500 | $4,680 | $4,250 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 51 CY | $977 | $950 | $1,130 | $1,150 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 41 CY | $1,000 | $1,200 | $1,970 | $1,500 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 7 CY | $925 | $1,500 | $2,610 | $2,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 345 SY | $13.00 | $14.00 | $14.00 | $12.00 |
| 512E33000 TYPE 2 WATERPROOFING | 11 SY | $100 | $54.00 | $55.00 | $60.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,050 EACH | $5.50 | $7.00 | $6.50 | $7.30 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 94 FT | $45.00 | $135 | $51.00 | $60.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $14.00 | $12.00 | $9.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 87 SF | $8.50 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 121 FT | $30.00 | $33.00 | $40.00 | $35.00 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 12 EACH | $2,100 | $2,000 | $1,850 | $2,100 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 12 EACH | $1,450 | $1,800 | $1,070 | $1,250 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 39 CY | $155 | $100 | $130 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 104 FT | $11.25 | $12.00 | $5.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 52 FT | $24.00 | $18.00 | $5.00 | $25.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 236 SY | $525 | $470 | $475 | $500 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 94 FT | $220 | $340 | $405 | $325 |
| 530E00400 SPECIAL - STRUCTURES (GROUT PORTABLE BARRIER ANCHO | 40 EACH | $60.00 | $43.00 | $52.00 | $20.00 |
| 530E00400 SPECIAL - STRUCTURES (PIER BEARING SEAT GRINDING) | 12 EACH | $190 | $180 | $790 | $275 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 7 SY | $120 | $110 | $156 | $150 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $400 | $350 | $560 | $300 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $100,000 | $200,000 | $140,000 | $200,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 1 LS | $18,000 | $70,000 | $25,000 | $45,000 |
| 202E22900 APPROACH SLAB REMOVED | 222 SY | $55.00 | $60.00 | $50.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 819 SY | $9.50 | $11.00 | $13.00 | $18.00 |
| 202E32000 CURB REMOVED | 46 FT | $11.00 | $11.00 | $14.00 | $10.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $48,000 | $20,000 | $35,000 | $35,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $19,000 | $30,000 | $6,000 | $20,000 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 67,287 LB | $2.10 | $2.01 | $1.99 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 4,936 FT | $1.50 | $1.20 | $1.21 | $1.25 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 214 EACH | $25.00 | $16.00 | $40.00 | $20.00 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 2 EACH | $3,400 | $3,500 | $4,681 | $4,250 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 51 CY | $977 | $950 | $1,130 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 41 CY | $1,000 | $1,200 | $1,965 | $1,500 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 7 CY | $1,000 | $1,500 | $2,610 | $2,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 345 SY | $13.00 | $14.00 | $45.00 | $12.00 |
| 512E33000 TYPE 2 WATERPROOFING | 11 SY | $100 | $54.00 | $55.00 | $60.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 4,050 EACH | $5.50 | $7.00 | $6.50 | $7.30 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 94 FT | $45.00 | $135 | $51.00 | $60.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $13.50 | $12.00 | $9.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 86 SF | $8.50 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 121 FT | $30.00 | $45.00 | $40.00 | $35.00 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 12 EACH | $2,100 | $2,000 | $1,830 | $2,250 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 12 EACH | $1,450 | $1,500 | $1,070 | $1,250 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 39 CY | $155 | $100 | $130 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 104 FT | $11.00 | $12.00 | $5.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 52 FT | $23.00 | $18.00 | $5.00 | $25.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 236 SY | $525 | $470 | $460 | $500 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 94 FT | $225 | $340 | $402 | $325 |
| 530E00400 SPECIAL - STRUCTURES (GROUT PORTABLE BARRIER ANCHO | 40 EACH | $60.00 | $43.00 | $52.00 | $20.00 |
| 530E00400 SPECIAL - STRUCTURES (PIER BEARING SEAT GRINDING) | 12 EACH | $190 | $180 | $790 | $275 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 7 SY | $115 | $110 | $128 | $160 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $400 | $350 | $560 | $300 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $65,000 | $200,000 | $236,000 | $325,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 1 LS | $13,000 | $60,000 | $25,000 | $55,000 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $55.00 | $60.00 | $54.00 | $75.00 |
| 202E23500 WEARING COURSE REMOVED | 234 SY | $10.00 | $15.00 | $13.00 | $30.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $20,000 | $38,000 | $30,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $17,000 | $18,000 | $6,000 | $25,000 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 39,341 LB | $2.15 | $2.03 | $2.19 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 5,654 FT | $1.50 | $1.20 | $1.21 | $1.25 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 232 EACH | $24.00 | $16.00 | $38.00 | $20.00 |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 90 CY | $1,250 | $2,300 | $2,378 | $2,200 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 59 CY | $935 | $1,000 | $1,110 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 37 CY | $1,000 | $1,300 | $2,150 | $1,675 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 8 CY | $1,000 | $1,500 | $3,060 | $2,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 434 SY | $9.00 | $14.00 | $14.00 | $12.00 |
| 512E33000 TYPE 2 WATERPROOFING | 6 SY | $45.00 | $54.00 | $54.00 | $75.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 79 FT | $43.00 | $135 | $50.00 | $65.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $8.00 | $12.00 | $8.50 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 86 SF | $8.50 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 92 FT | $30.00 | $33.00 | $40.00 | $35.00 |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.: (1 1/4" x 9") | 85 FT | $105 | $80.00 | $125 | $125 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $42,000 | $75,000 | $90,000 | $90,000 |
| 518E12500 SCUPPER, MISC.: STEEL TUBE SCUPPERS INCLUDING ATTA | 2 EACH | $2,700 | $1,500 | $3,300 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 28 CY | $165 | $130 | $160 | $185 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 108 FT | $10.50 | $11.00 | $5.00 | $18.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 53 FT | $22.50 | $18.00 | $5.00 | $20.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 230 SY | $515 | $470 | $448 | $475 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 79 FT | $220 | $335 | $428 | $350 |
| 530E00400 SPECIAL - STRUCTURES(GROUT PORTABLE BARRIER ANCHOR | 68 EACH | $60.00 | $43.00 | $51.00 | $20.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 7 SY | $115 | $100 | $127 | $155 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $400 | $350 | $560 | $300 |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 715 SY | $110 | $120 | $128 | $140 |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 715 SY | $125 | $130 | $125 | $140 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 14 CY | $300 | $280 | $247 | $300 |
| 848E50000 HAND CHIPPING | 25 SY | $270 | $80.00 | $109 | $125 |
| 848E50100 TEST SLAB | 1 LS | $3,300 | $1,000 | $2,700 | $2,500 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $2,000 | $1,500 | $1,500 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (3" THICKNESS) | 715 SY | $19.00 | $20.00 | $13.00 | $25.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 250 SY | $32.00 | $32.00 | $55.00 | $40.00 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $174,000 | $225,000 | $236,000 | $340,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 1 LS | $19,000 | $70,000 | $24,400 | $45,000 |
| 202E22900 APPROACH SLAB REMOVED | 241 SY | $60.00 | $60.00 | $55.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 332 SY | $10.50 | $14.00 | $13.00 | $30.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $48,000 | $25,000 | $35,500 | $30,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $17,000 | $20,000 | $7,400 | $25,000 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 41,967 LB | $2.10 | $2.02 | $2.15 | $2.00 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 5,654 FT | $1.50 | $1.20 | $1.20 | $1.25 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 278 EACH | $25.00 | $16.00 | $38.00 | $25.00 |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 99 CY | $1,300 | $2,300 | $2,190 | $2,200 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 59 CY | $935 | $1,000 | $1,100 | $1,250 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 42 CY | $1,550 | $1,500 | $1,930 | $1,500 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 7 CY | $1,200 | $1,500 | $3,460 | $2,250 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 430 SY | $9.50 | $10.50 | $10.28 | $12.00 |
| 512E33000 TYPE 2 WATERPROOFING | 5 SY | $75.00 | $54.00 | $50.00 | $75.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 113 FT | $45.00 | $135 | $46.00 | $65.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $8.00 | $11.00 | $8.00 | $8.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 86 SF | $8.75 | $14.00 | $9.00 | $12.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 126 FT | $30.00 | $33.00 | $39.00 | $35.00 |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.: (1 1/4" x 9") | 119 FT | $100 | $65.00 | $109 | $125 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $58,000 | $80,000 | $90,000 | $100,000 |
| 518E12500 SCUPPER, MISC.: STEEL TUBE SCUPPERS INCLUDING ATTA | 2 EACH | $2,700 | $1,500 | $3,300 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 33 CY | $150 | $130 | $178 | $165 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 142 FT | $10.50 | $10.00 | $4.35 | $18.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 52 FT | $23.00 | $22.00 | $5.00 | $20.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 324 SY | $460 | $420 | $365 | $450 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 113 FT | $210 | $315 | $360 | $325 |
| 530E00400 SPECIAL - STRUCTURES (GROUT PORTABLE BARRIER ANCHO | 76 EACH | $60.00 | $43.00 | $47.00 | $20.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 7 SY | $120 | $100 | $126 | $160 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $420 | $350 | $560 | $300 |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,025 SY | $100 | $110 | $106 | $115 |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,025 SY | $120 | $120 | $120 | $125 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 20 CY | $310 | $280 | $247 | $300 |
| 848E50000 HAND CHIPPING | 38 SY | $260 | $85.00 | $90.00 | $125 |
| 848E50100 TEST SLAB | 1 LS | $3,300 | $1,000 | $2,700 | $2,500 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $2,000 | $1,500 | $1,500 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (3" THICKNESS) | 1,025 SY | $16.00 | $20.00 | $13.00 | $25.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 359 SY | $35.00 | $32.00 | $57.00 | $40.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 30,731.25 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN | 20 EACH | $145 | $360 | $220 | $220 |
| 202E42051 ANCHOR ASSEMBLY REMOVED, TYPE B, AS PER PLAN | 17 EACH | $125 | $350 | $150 | $150 |
| 202E47801 IMPACT ATTENUATOR REMOVED, AS PER PLAN | 7 EACH | $235 | $480 | $250 | $250 |
| 203E20001 EMBANKMENT, AS PER PLAN | 2,325 CY | $68.00 | $68.00 | $30.00 | $30.00 |
| 209E60200 LINEAR GRADING | 327 STA | $49.60 | $49.60 | $125 | $125 |
| 606E15050 GUARDRAIL, TYPE MGS | 8,755.25 FT | $19.20 | $19.20 | $19.50 | $19.50 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 50 FT | $28.40 | $28.40 | $35.00 | $35.00 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 493.75 FT | $33.60 | $33.60 | $44.00 | $44.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 5 EACH | $2,695 | $2,695 | $2,450 | $2,450 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 26 EACH | $2,650 | $2,650 | $2,450 | $2,450 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 34 EACH | $1,420 | $1,420 | $1,100 | $1,100 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 33 EACH | $2,760 | $2,760 | $2,450 | $2,450 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 19 EACH | $550 | $550 | $525 | $525 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $8,860 | $8,860 | $7,850 | $7,850 |
| 606E98000 GUARDRAIL, MISC.:ALTERNATIVE GUARDRAIL PLACEMENT | 200 FT | $12.00 | $12.00 | $10.00 | $10.00 |
| 622E90200 BARRIER, MISC.:VERTICAL EXTENSION OF BARRIER TRANS | 8 EACH | $2,000 | $3,300 | $1,680 | $4,000 |
| 601E34401 ROCK CHANNEL PROTECTION, WITH GROUT, AS PER PLAN | 3 CY | $800 | $270 | $1,200 | $750 |
| 659E00300 TOPSOIL | 411 CY | $250 | $30.00 | $40.00 | $15.00 |
| 659E10000 SEEDING AND MULCHING | 3,705 SY | $0.72 | $2.36 | $1.36 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 185 SY | $0.50 | $0.80 | $0.80 | $2.00 |
| 659E15000 INTER-SEEDING | 185 SY | $0.01 | $0.80 | $0.80 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $1,500 | $822 | $821 | $2,000 |
| 659E31000 LIME | 0.77 ACRE | $200 | $155 | $155 | $10.00 |
| 659E35000 WATER | 20 MGAL | $1.00 | $1.00 | $1.00 | $20.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 410 EACH | $12.25 | $12.25 | $10.00 | $10.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $90.00 | $110 | $125 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $100,000 | $117,500 | $110,000 | $250,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $3,500 | $8,000 | $5,000 | $30,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $57,860 | $180,000 | $134,000 | $125,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $22,000 | $5,100 | $5,000 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $32,080 | $42,500 | $38,000 | $175,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $1,041,758 | $1.04M | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $950,000 | $950k | 5% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 38,396 FT | $24.57 | $943k | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 9,815 SY | $71 | $697k | 3% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,415 CY | $181 | $618k | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $600,000 | $600k | 3% |
| 513E10041 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 1 LS | $520,000 | $520k | 2% |
| 513E10041 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN | 1 LS | $510,000 | $510k | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 18,956.25 FT | $21.6 | $409k | 2% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 1,532 CY | $204 | $313k | 2% |